| 1 | Repairing of damaged AMF Panel with synchronizing panel and replacing of damaged synchronizing relay volt meters, amp meters, CTs and control relays including painting of the AMF panel complete job (Make Schneider) |
| 2 | Supply and fixing of 1250 ampre Air Circuit Breaker 50 K 4 Pole (EDO Type) in the existing panel board including dismentaling of old ACB with connection testing etc as requried 1No |
| 3 | Supply and fixing of 1000 ampre (Air Circuit Breaker) 50 K 3 Pole (EDO Type) in the existing panel board including dismentaling of old ACB with connection testing etc as requried 2 No |
| 4 | Supply and Fixing of 400 ampre 4 Pole 50 K MCCB in the existing panel board including dismentling of old MCCB with connection testing etc as req etc as requried 1 no |
| 5 | Repairing and replacement of damaged 1250 ampre bus bar in the existing panel 2.8 meter |
| 6 | Repairing of VCB control panel indoor type by way of replacing of charging motor,NONC coils and DC supply 12 volt 100 AH maintance free (MAKE SCHNEIDER) |
| 7 | Supply and fixing of CT/PT trivector meter panel Ratio 30/5 / PT 110 Volt including dismentling of existing panel complete job |
| 8 | Supply and laying of PVC Power cable (HT) 3.3 KV Grade armoured aluminium XLPE cables including earth work, cost of end termination, thimbles and saddles etc. as required. |
| 9 | 120 sq mm x 3 core |
| 10 | Construction of platform with concreete base 1:3:6 of (10'- 0\\"X 4'- 0') 3'- 0\\" including excavation shuttering and refilling complete job |
| 11 | Earthing withGI earth plate 600mm x 600 mm x 6mm thick including accessories and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. (with charcoal or coke and salt) complete as required for earthing and lightning protection |
| 12 | Providing and fixing 25 mm x 6 mm GI strip from earth electrode as required(10 Meter) each approx |
| 13 | Supply installation testing commission of LA link set 11 KVA along with GO/DO set 9 insulator with gang set complete with Rod etc as requried |
| 14 | Supplying and making outdoor cable end termination with with heat shrinkable jointing kit complete with all accessories including lugs suitable for 120 sq mm 3 core XLPE alum conductor cable |
| 15 | Supply and laying of PVC Power cable 1.1 KV Grade armoured aluminium XLPE cables including earth work, cost of end termination, thimbles and saddles etc. as required. |
| 16 | 3.5 C X 300 SQ MM |
| 17 | Repairing of 11 KV 630 KVA transformer with built in HT automatic voltage regulator (BUCK BOOST TRANSFORMER ) by way of replacing of carbon roller assembly(24no), auto manual switch with push button,PCB relay breather with sillica Gel,terminal block(72no) , O ring washers for top cover gas release plug, O ring washer for conservator oil plug(7no), transformer oil (250 ltr Approx), accessories req as per site to make the auto manual system in order to run the system including labour charges complete job |
| 18 | Repairing and overhauling of following DG set of different capacities |
| 19 | 500 KVA DG Set |
| 20 | 250 KVA DG Set |
| 21 | 125 KVA DG Set |
| 22 | Repairing of Distribution transformer by way of complete rewinding of following capacities |
| 23 | 400 KVA |
| 24 | 250 KVA |
| 25 | Repairing of 5 HP motor( mono block pump set ) by way of complete rewinding etc as requried |
| 26 | Repairing of APFC panel board 135 KVAR alongwith 25 KVAR capacitor HD 400 volts box type 4 nos, 20 KVAR capacitor HD 400 volts box type 01no, APFC relay ETA smart 12 stage 01no, contactor 70 amp 4nos, contactor 9 amp 2 nos, fuse link L&T 100 amp 4 set including dismentling of the damaged parts with conection testing etc Please Enable Macros to View BoQ information |