| 1 | Dismantling CC road surfaces for laying of pipe line including sorting out of serviceable materials and disposal of unserviceable materials. (a) |
| 2 | Excavation for pipeline in soil mixed with kankar with a lift upto 1.50m and lead upto 30m from the trenches and disposal of surplus earth within a distance of 60m from the trenches (a) |
| 3 | Supply of 450mm dia DI K-7/9 with all jointing materials such as socket, rubber gasket as per IS-4984/1995 and IS 8329/2000 or their latest amendment including for destination and all taxes and insurance etc. with loading-unloading and stacking all complete. (a) |
| 4 | Dismentalling of CC drain that is built over DI pipe line (a) |
| 5 | Provision of crossing nala including shifting of telephone electric cable etc. along the alignment of drain including special etc. complete. (a) |
| 6 | Bypass arrangement during the damaged drain for crossing pipe line and CC reinstatement. (a) |
| 7 | Dismantling Interlocking road surfaces for laying of pipe line including sorting out of serviceable materials and disposal of unserviceable materials. (b) |
| 8 | Excavation for pipeline in soil mixed with kankar with a lift upto 1.50m and lead upto 30m from the trenches and disposal of surplus earth within a distance of 60m from the trenches (b) |
| 9 | Supply of 250mm dia DI K-7/9 with all jointing materials such as socket, rubber gasket as per IS-4984/1995 and IS 8329/2000 or their latest amendment including for destination and all taxes and insurance etc. with loading-unloading and stacking all complete. (b) |
| 10 | Dismentalling of CC drain that is built over DI pipe line (b) |
| 11 | Provision of crossing nala including shifting of telephone electric cable etc. along the alignment of drain including special etc. complete. (b) |
| 12 | Bypass arrangement during the damaged drain for crossing pipe line and CC reinstatement. (b) |
| 13 | Dismantling Interlocking road surfaces for laying of pipe line including sorting out of serviceable materials and disposal of unserviceable materials. (c) |
| 14 | Excavation for pipeline in soil mixed with kankar with a lift upto 1.50m and lead upto 30m from the trenches and disposal of surplus earth within a distance of 60m from the trenches (c) |
| 15 | Supply of 250mm dia DI K-7/9 with all jointing materials such as socket, rubber gasket as per IS-4984/1995 and IS 8329/2000 or their latest amendment including for destination and all taxes and insurance etc. with loading-unloading and stacking all complete. (c) |
| 16 | Dismentalling of CC drain that is built over DI pipe line (c) |
| 17 | Provision of crossing nala including shifting of telephone electric cable etc. along the alignment of drain including special etc. complete. (c) |
| 18 | Bypass arrangement during the damaged drain for crossing pipe line and CC reinstatement. (c) |
| 19 | GST Please Enable Macros to View BoQ information |