| 1 | Making of Cavity for Rainwater Harvesting system including machinery and all material required as per the site of Engineer-In-Charges. |
| 2 | Providing and laying of 8 Dia PVC Pipe ISI marked of Aggarwal, Finolex and Dplast 1st quality make including carridge and handling charges, complete in all respect. |
| 3 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] |
| 4 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] |
| 5 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] |
| 6 | [20.90.3]Drilling of 250mm dia of bore through bokky type instrument complete in all respect including charges for shifting of infrastructures as per IS Code 12818: 1992 3. 76 to 100m BGL [Through Rate] |
| 7 | [20.91]Providing and Lowering 225 mm outer dia UPVC pipe threaded (10kg/CM2) duly ISI marked IS Code 12818:1992 complete in all respect as per directions of Engineer-in-charge [Through Rate] |
| 8 | [20.92]Providing and lowering 225mm outer dia UPVC filter Jali (10 Kg/CM2) duly ISI marked IS Code 12818:1992 complete in all respect as per directions of Engineer-in-charge [Through Rate] |
| 9 | [20.93]Providing and fixing 250 mm M.S. clamp as for suitable pipe with nut and bolt complete in all respect as per directions of Engineer-in-charge [Through Rate] |
| 10 | [20.94]Providing and fixing UPVC cap for 225mm outer dia UPVC pipe (10kg/cm2) duly ISI marked IS Code 12818:1992 complete in all respect as per directions of Engineer-in-charge [Through Rate] |
| 11 | [33.12]Supplying, filling, spreading and levelling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads and lifts, all complete as per direction of Engineer-in-charge. [Through Rate] |
| 12 | [33.13]Supplying, filling, spreading and levelling gravels of size range 5 mm to 10 mm, in the recharge pit, over the existing layer of boulders, in required thickness, for all leads and lifts, all complete as per direction of Engineer-in-charge. [Through Rate] |
| 13 | [33.14]Supplying, filling, spreading and levelling coarse sand of size range 1.5 mm to 2 mm in recharge pit, in required thickness over gravel layer, for all leads and lifts, all complete as per direction of Engineer -in-charge. [Through Rate] |
| 14 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate] |
| 15 | [6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] |
| 16 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate] |
| 17 | [7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] Please Enable Macros to View BoQ information |