| 1 | Subwork No1 Rising MianItem No.1 Providing ISI mark G.I. pipe of following class and dia. excluding GST levied by GOI & GOM in all respect, inspection charges, transportation to stores, etc. complete as per IS-1239/2004. Note : One coupler shall be provided with each full length of pipe cost of which is included in rates below.110 mm dia HDPE PN 10 Pipes |
| 2 | Item No.2 Providing and supplying Air Valves as per IS14845-2000 and MJP’s standard specifications of approved make and quality of following diameters including railway freight, inspection charges, unloading from railway wagons, loading into truck, transportation upto departmental stores, unloding and stacking excluding GST levied by GOI & GOM in all respect etc. complete40 mm Air Valve Single Ball Flanged / Screwed Type - PN -1 |
| 3 | Item No.3 Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A1/259) |
| 4 | Item No.4 Excavation for foundation / pipe trenches in hard murum including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge,normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-2/259) |
| 5 | Item No.5Excavation for foundation /pipe trenches in Hard murum and boulders,W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below,stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. |
| 6 | Item No.6 Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A4/259) |
| 7 | Item No.7 Excavation for foundation / pipe trenches in hard rock by controlled blasting, including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the area and lifts as below, normal dewatering, excluding backfilling, etc. complete. (Bd-A-5/259 |
| 8 | Item No.8 Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. (Bd-A-10/263) |
| 9 | Item No.9 Lowering, laying and jointing G. I. pipes and specials of following class and diameter including conveyance from stores to site of works, all labour, etc. complete either underground or in vertical position, as directed by Engineer-in-charge.110 mm dia HDPE PN 10 Pipes |
| 10 | Item No.10 Lowering, laying and fixing in proper alignment and position all types of C.I. air valves as directed by Engineer-in-charge including cost of conveyance from stores to site of work, cost of all material and giving satisfactory hydraulic testing, etc. complete. (for all class of valves).40 mm Air Valve Single Ball Flanged / Screwed Type - PN -1 |
| 11 | Item No.11 Providing and fixing in position air valve shaft including providing and fixing GI Medium Class or 6 mm thick M.S. pipe shaft 2.70 M long over branch flange of air valve tee, providing PCC block of M-150 concrete, 150 mm thick around the air valve tee including encasing of vertical shaft in PCC M-150 as shown in type design together with providing and making flanged joints wherever required and fixing of air valve tee, etc. complete as per type design and as directed by Engineer -incharge for following diameters of pipe lines (type design attached.)Upto 150mm Foundation on Murum and Harder Strata. |
| 12 | Item No.12 Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard murum material in 15cm layers with all leads and lifts including consolidation, surcharging etc. complete. |
| 13 | Subwork No 2 DistributionItem No.1 Providing ISI mark G.I. pipe of following class and dia. excluding GST levied by GOI & GOM in all respect, inspection charges, transportation to stores, etc. complete as per IS-1239/2004. Note : One coupler shall be provided with each full length of pipe cost of which is included in rates below.110 mm dia HDPE PN 8 Pipes |
| 14 | 90 mm dia HDPE PN 8 Pipes |
| 15 | 75 mm dia HDPE PN 8 Pipes |
| 16 | 63 mm dia HDPE PN 8 Pipes |
| 17 | Item No.2 Providing double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete.Without by pass arrangement -PN -165 mm - PN -1 |
| 18 | 80 mm - PN -1 |
| 19 | 100 mm - PN -1 |
| 20 | 125 mm - PN -1 |
| 21 | Item No.3 Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A1/259) |
| 22 | Item No.4 Excavation for foundation / pipe trenches in hard murum including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge,normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-2/259) |
| 23 | Item No.5Excavation for foundation /pipe trenches in Hard murum and boulders,W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below,stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. |
| 24 | Item No.6 Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A4/259) |
| 25 | Item No.7 Excavation for foundation / pipe trenches in hard rock by controlled blasting, including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the area and lifts as below, normal dewatering, excluding backfilling, etc. complete. (Bd-A-5/259 |
| 26 | Item No.8 Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. (Bd-A-10/263) |
| 27 | Item No.9 Lowering, laying and jointing G. I. pipes and specials of following class and diameter including conveyance from stores to site of works, all labour, etc. complete either underground or in vertical position, as directed by Engineer-in-charge.110 mm dia HDPE PN 8 Pipes |
| 28 | 90 mm dia HDPE PN 8 Pipes |
| 29 | 75 mm dia HDPE PN 8 Pipes |
| 30 | 63 mm dia HDPE PN 8 Pipes |
| 31 | Item No.10 Lowering, laying and jointing in position following C.I.D/F Reflex valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc. complete. (Rate for all class of valves.)65 mm - PN -1 |
| 32 | 80 mm - PN -1 |
| 33 | 100 mm - PN -1 |
| 34 | 125 mm - PN -1 |
| 35 | Item No.11 Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. (Cement 5.90 bags / cum) |
| 36 | Item No.12 Valve Chamber with Precast RCC Covers Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation, B.B. masonry in CM 1:5 proportion precast RCC frame and cover, etc. complete as directed by Engineer-in-charge. |
| 37 | Item No.13 Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard murum material in 15cm layers with all leads and lifts including consolidation, surcharging etc. complete. Please Enable Macros to View BoQ information |