| 1 | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. |
| 2 | Providing earth work in embankment with approved materials obtained from departmental land or other sources upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades and section, watering and compaction with Power roller to achieve not less than 97 % of standard proctor density etc. complete |
| 3 | Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 600 mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete. |
| 4 | Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 900 mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete. |
| 5 | Supplying 80mm trap metal at the road side for metal including conveying an stacking etc. complete (50 meter intial lead (excluding royalty) by breaking boulders(hand broken)Add 10% Hilly area S.E.Circular No.1 R.A. |
| 6 | Supplying 40mm trap metal at the road side for metal including conveying an stacking etc. complete (50 meter intial lead (excluding royalty) by breaking boulders(hand broken)Add 10% Hilly area S.E.Circular No.1 R.A. |
| 7 | Supplying soft murum at the road site, including conveying and stacking complete. |
| 8 | Spreading over size 40/50/60/80mm laterite /trap metal including sectioning complete 55.00 Add 10% . . |
| 9 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete. |
| 10 | Compacting the size metal(200 mm loose) layer 2.0 to 7.00 mtwidth with static roller, including necessary labour, materials including necessary labour, materials and artificial watering etc complete. |
| 11 | Compacting the size metal(100 mm loose) layer 2.0 to 7.00 mtwidth with static roller, including necessary labour, materials including necessary labour, materials and artificial watering etc complete. |
| 12 | Providing 20m thick premix bituminous carpet including supplying all materials, preparing and cleaning the base, heating bitumen applying tack coat at specified rate, Mixing hot bitumen and chips, laying the carpet layer and compacting etc comp. by bulk asphalt, (cold mix with prior approval) Please Enable Macros to View BoQ information |