|
| 1 | Supply,Erection and Commissioning |
| 2 | RTU comprising panels, racks, subracks, Power Supply modules, CPU analog / digital input & control output module as per specification interfacing equipment, required converters & all other required items/accessories including complete wiring for all modules |
| 3 | Router (DC Power supply) |
| 4 | Single TFT PC for LDMS with all accessories |
| 5 | 1 B/W laser printer |
| 6 | Software for LDMS (client based) |
| 7 | OS for PC (windows latest version) |
| 8 | Anti Virus For Workstation latest version |
| 9 | MS Office 2020 STD |
| 10 | DC Voltage Transducers |
| 11 | DC current Transducers |
| 12 | Oil Temperature Transducers |
| 13 | Winding Temperature Transducer |
| 14 | TAP Position Transducers |
| 15 | DC Power Supply (DCPS) system based on SMPS |
| 16 | UPS(0.6kVA) for LDMS PC |
| 17 | RTU Database Configuration & Maintenance Software tool. |
| 18 | Mandatory Spares for RTU(5%) |
| 19 | Installation, Testing and Commissioning Cost to Integrate 36 nos S/s with existing SCADA Infrastructure/ system including configuration, databse updating and ensuring display of all parameters on the system dashboard |
| 20 | Battery Bank for above DCPS (VRLA Type) for minimum 4 hrs backup (HBL,TRIUMPH-HP VRLA battery-48V, 80 AH) |
| 21 | Installation, Testing and Commissioning of Existing DR (Disaster Recovery) including configuration and integration of Storage & Back up Devices to ensure secure data backup for newly integrated 36 nos 33/11kV substations |
| 22 | External Hard Disk for data storage 1.2 TB |
| 23 | Facilities Management Services with all type of material (hardware (all types of cables, control cables, items etc.), + software+ manpower) to maintain the SCADA system post successful completion of acceptance tests shall be provided for a period of Five years from the date of completion of acceptance test. Manpower required for FMS (mentioned in Detailed Document ) |
| 24 | FMS FOR 5 YEAR WITH MATERIAL, MANPOWER |
| 25 | RTU comprising panels, racks, subracks, Power Supply modules, CPU analog / digital input & control output module as per specification interfacing equipment, required converters & all other required items/accessories including complete wiring for all modules |
| 26 | Router (DC Power supply) |
| 27 | Single TFT PC for LDMS with all accessories |
| 28 | 1 B/W laser printer |
| 29 | Software for LDMS (client based) |
| 30 | OS for PC (windows latest version) |
| 31 | Anti Virus For Workstation latest version |
| 32 | MS Office 2020 STD |
| 33 | DC Voltage Transducers |
| 34 | DC current Transducers |
| 35 | Oil Temperature Transducers |
| 36 | Winding Temperature Transducer |
| 37 | TAP Position Transducers |
| 38 | DC Power Supply (DCPS) system based on SMPS |
| 39 | UPS(0.6kVA) for LDMS PC |
| 40 | RTU Database Configuration & Maintenance Software tool. |
| 41 | Mandatory Spares for RTU(5%) |
| 42 | Installation, Testing and Commissioning Cost to Integrate 36 nos S/s with existing SCADA Infrastructure/ system including configuration, databse updating and ensuring display of all parameters on the system dashboard |
| 43 | Battery Bank for above DCPS (VRLA Type) for minimum 4 hrs backup (HBL,TRIUMPH-HP VRLA battery-48V, 80 AH) |
| 44 | Installation, Testing and Commissioning of Existing DR (Disaster Recovery) including configuration and integration of Storage & Back up Devices to ensure secure data backup for newly integrated 36 nos 33/11kV substations |
| 45 | External Hard Disk for data storage 1.2 TB |
| 46 | Facilities Management Services with all type of material (hardware (all types of cables, control cables, items etc.), + software+ manpower) to maintain the SCADA system post successful completion of acceptance tests shall be provided for a period of Five years from the date of completion of acceptance test. Manpower required for FMS (mentioned in Detailed Document ) Please Enable Macros to View BoQ information |