| 1 | Opening of jumper at cut points getting the line charged and tested. Fault detection along with departmental electrician Rectifying the fault with dismantling cable or replacing punctured pin insulators. | Opening of jumper at cut points getting the line charged and tested. Fault detection along with departmental electrician Rectifying the fault with dismantling cable or replacing punctured pin insulators. |
| 2 | Dismantling cable from the pole and assisting electrician during disconnecting the cable from transformer. Loading the cable and transformer on the truck and re-erecting the transformer at new location by departmental crane. Connecting the cable on pole and assisting electrician during re-connection. | Dismantling cable from the pole and assisting electrician during disconnecting the cable from transformer. Loading the cable and transformer on the truck and re-erecting the transformer at new location by departmental crane. Connecting the cable on pole and assisting electrician during re-connection. |
| 3 | Carrying the Light fitting from Substation loading on truck and unloading at different location. Removing the damaged fitting from pole after disconnectiong from pole and lowering to the ground by rope. Lifting the new light on to the pole or lamp post ( after erection) and fixing and connection to O/H line or cable as required. | Carrying the Light fitting from Substation loading on truck and unloading at different location. Removing the damaged fitting from pole after disconnectiong from pole and lowering to the ground by rope. Lifting the new light on to the pole or lamp post ( after erection) and fixing and connection to O/H line or cable as required. |
| 4 | 8-1-14 (CSR 2019-20) Erecting rolled steel joist (girder) pole 200 x 100 mm. (25.9 kg/m) with provided base plate in provided foundation as per specification no. OH-PL/RSJ (only labour required) | 8-1-14 (CSR 2019-20) Erecting rolled steel joist (girder) pole 200 x 100 mm. (25.9 kg/m) with provided base plate in provided foundation as per specification no. OH-PL/RSJ (only labour required) |
| 5 | 16-3-3 (CSR 2023-24) Making Cement concrete foundation including excavation (60 x 60 x 150)cm deep in 1:3:6 cement concrete 20 x 25 mm stone metal, (45 x 45 x 45)cm /45cm dia. x 45cm height plinth duly plastered, with necessary curing and finishing complete. (above 6m to 9m poles) | 16-3-3 (CSR 2023-24) Making Cement concrete foundation including excavation (60 x 60 x 150)cm deep in 1:3:6 cement concrete 20 x 25 mm stone metal, (45 x 45 x 45)cm /45cm dia. x 45cm height plinth duly plastered, with necessary curing and finishing complete. (above 6m to 9m poles) |
| 6 | 8-6-2 (CSR 2023-24) Supplying and erecting G.I. stay set for poles, including loop insulators at in accessible height with anchor plate 300x300x6mm., straining screws, G.l. stay wire7/8SWG,G.l. stay rod 20mmx1.8m length and pole clamps duly erectedin provided cement concrete foundation complete. | 8-6-2 (CSR 2023-24) Supplying and erecting G.I. stay set for poles, including loop insulators at in accessible height with anchor plate 300x300x6mm., straining screws, G.l. stay wire7/8SWG,G.l. stay rod 20mmx1.8m length and pole clamps duly erectedin provided cement concrete foundation complete. |
| 7 | 16-3-6 (CSR 2023-24)Making Cement concrete foundation including excavation (60 x 60 x 150)cm deep in 1:3:6 cement concrete, (20 to 25) mm stone metal with necessary curing and finishing complete.(for stay). | 16-3-6 (CSR 2023-24)Making Cement concrete foundation including excavation (60 x 60 x 150)cm deep in 1:3:6 cement concrete, (20 to 25) mm stone metal with necessary curing and finishing complete.(for stay). |
| 8 | 8-5-2 (CSR 2023-24)Supplying and erecting porcelain shackle type LT mediumi nsulator 75x115mm dia. with G.l. (shackle) strips, nuts and bolts, complete. | 8-5-2 (CSR 2023-24)Supplying and erecting porcelain shackle type LT mediumi nsulator 75x115mm dia. with G.l. (shackle) strips, nuts and bolts, complete. |