| 1 | Dagbelling 5 to 7.5 cm deep |
| 2 | Clearance of Jungle and cutting of ordinary vegetation shrubs and bushes |
| 3 | Hard soil mixed with Kankar boulders, Morrum(40%) |
| 4 | Soft / Disintegrated rock(30%) |
| 5 | Hard rock without blasting(30%) |
| 6 | Cement Concrete 1:3:6 well mixed and laid in position complete including all leads of all construction materials including curing and finishing well graded broken stone aggregate of 20mm size |
| 7 | cement mortar for apron 1;6, 23cm kharanja for thickness |
| 8 | Random rubble stone masonary in cement mortar 1:6 forFoundation and super structure |
| 9 | Cement concrete well mixed with cement mortar (1:2:4) laid in position complete excluding curing with aggregate size upto 12mm HB. |
| 10 | Cement plaster in cement sand mortar 1:4, 25mm thick with curing. |
| 11 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect for Black Cotton Soil for Corewall and Cutoff Trench |
| 12 | Re- handling excavation earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water including loading and un-loading wherever required with cost of dewatering wherever required. |
| 13 | Transportation of Black Cotton Soil upto average 5 km lead considering shortest route including Loading, Unloading and Stacking for Corewall and Cutoff Trench |
| 14 | Earth work in rough (borrow area) excavation with JCB or Scraper, for embankment in hard soil, Morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted manually or by plain roller with initial lead of 250 m and lift up to 3m (excluding charges for compaction and watering), including loading and un-loading wherever required complete in all respect. |
| 15 | Dry Stone Pitching 15 to 30 centimeter thick with hammer dressed including all lifts and including supply of stone |
| 16 | Excavation of soil up to a depth of 1.5 m in the foundation, trench, drain, compaction of the bottom, watering, arranging the sides, removing the excavated soil, filling the voids after filling the foundation with soil again and disposing of the remaining soil up to distance of 50m |
| 17 | In cement concrete foundation or floor, put 40 mm nominal size stone aggregate (crusher broken)/ brick soil in cement-sand mixture in the ratio of 1 cement : 4 sand : 8 aggregate and crush it, including tamping. (10 a) |
| 18 | Iron work in grills/gates etc. including cutting, mounting and fitting of flat cones, Tees and channels, etc. (63) |
| 19 | Applying enamel paint in 3 layers to give an even shade. Creating an even surface on new work/old work. (82 a) Please Enable Macros to View BoQ information |