| 1 | Engagement of labourers for clearance of site etc. |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: (1 meter from cutting edge ) All kinds of soil |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 4 | Providing and laying stone soling/ hand packed (above 75 mm) including all sorts of carriages by all means of transport upto site of work complete job . |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 7 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate. |
| 8 | Providing & Laying in position cement concrete.1:2:4(1 cement: 2coarse sand : 4 graded stone aggregate 20 mm N.S crushed),reinforced cement concrete excluding the cost of centering, shuttering, finishing & reinforcement. All work upto plinth level. |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level complete job including all carriages complete job.(TMT Bars) |
| 10 | Form work centering / shuttering including Strutting, Propping etc and removal of form work for:(a) Foudation, footings, basis, coloums etc |
| 11 | 12mm thick cement plaster on walls in 1:6 mix (1 Cement :6 sand ) |
| 12 | Providing & Laying non pressure NP2 Class (Heavy) duty) RCC pipes with collars jointed with stiff mixture of cement mortor in the proporation of 1:2 (1 cement : 2 fine sand) including testing of joints etc complete300 mm dia RCC pipe. |
| 13 | Lifting / disposal of excavated/ dismantelled unservicable material from site of work to dumping site by mechinical transport including loading,unloading beyond municipal limits. as per direction of Engineer-in-charge: |
| 14 | Providing & laying Black cutting / Nallah Muck /GSB / filling got by lorries including Loading, unloading. Ramming, dressing, and watering in layers including all sorts of carriages complete job. |
| 15 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete job including all carriages complete job.(a) (Welded.) |
| 16 | Engagement of Dewatering pump for Dewatering of drain / foundation during execution of work including all POL charges complete as directed at site. |
| 17 | Carriage of materials by mechanical transport from source upto the site of work complete job A) Stone agg 40mm from Athwajan10 kms lead |
| 18 | b) Stone agg 20mm from Athwajan 10 kms lead |
| 19 | Sand from Ganderbal 23 Km lead Please Enable Macros to View BoQ information |