|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil. |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size). |
| 3 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) |
| 4 | Brick work in foundation and plinth with non-modular bricks. Cement mortar 1:6 ( 1 cement : 6 coarse sand). |
| 5 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level. |
| 6 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone |
| 7 | 15mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 6 ( 1 cement : 6 coarse sand) |
| 8 | Dumping of Stones in horizontal including the cost of stone. |
| 9 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 10 | Distempering with dry distemper of approved brand and manufacture (two or more coats) and of required shade on new work, over and including water thinnable priming coat to give an even shade |
| 11 | Carriage of material by Mechanical Transport including loading unloading complete sand lead upto 26 Kms. |
| 12 | Carriage of material by Mechanical Transport including loading unloading complete stone aggregate lead upto 45 Kms. |
| 13 | Carriage of material by Mechanical Transport including loading unloading complete stone lead upto 05 Kms. |
| 14 | Carriage of material by Mechanical Transport including loading unloading complete bricks lead upto 240 Kms. |
| 15 | Carriage of material by Manual including loading unloading complete sand lead upto 100m. |
| 16 | Carriage of material by manual including loading unloading complete stone aggregate lead upto 100m. |
| 17 | Carriage of material by manual including loading unloading complete stone lead upto 100m. |
| 18 | Carriage of material by manual including loading unloading complete bricks lead upto 100m. Please Enable Macros to View BoQ information |