| 1 | Demolising RCC works mannuly by mechanical means including stacking of steel bars and disposal of unservisible materials with in 50m. Leads as directed by Engineer-In-charge as per SOR(15.3) |
| 2 | Taking out existing CC interlocking paver blocks from footpath/central verge, including removal ot rubbishetc. Disposal of unsurvisible material to dumping ground as per DAR 16.83 SOR 36 |
| 3 | Earth work in surface excavation not exceeding 30 Cm. in depth but exceeding 1.50 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge 2.1.1 all kind so |
| 4 | Providing and laying in position cement concrete of specified grade ecluding th cost of centring and shuttering all work upto plingth level 1:4:8 (1 cement, 4 coarse sand and 8 stone ballast 40 mm as per SOR( 2021-22) 4.1.8 |
| 5 | Class-150 brick work in 1:4 cement and Coarse sand of fineness modulus mortar in foundation and plinth including supply of all material, labour T&P etc required proper completion of work. but in super-structure, including necessary cutting and mould |
| 6 | Providing and laying in position cement concrete of specified grade ecluding th cost of centring and shuttering all work upto plingth level 1:2:4 (1 cement, 2 coarse sand and 4 stone grit 20 mm as per SOR( 2021-22) 4.1.3 |
| 7 | 12 mm cement plaster finished with a floating coat of neat cement of mix 1:4 (1 cement:4 fine sand) as per SOR 13.7.2 |
| 8 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired |
| 9 | Providing Laying spreading and compaction stone aggregates of 53-22.4 mm size to water bound macadam specification including spreading in uniform thickness, hand packing rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber apply |
| 10 | Laying of old CC interlocking paver blocks of any design/shape laid in required line, level curvature colour and pattern over including 50 mm thick compacted bed of coarse sand filling the joint with fine sand etc. all completed as per Engineer-in-charge. |
| 11 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 |
| 12 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 50 |
| 13 | Providing and laying dense graded bituminous macadam Grading-I with 120 TPH batch type HMP producing an avarage output of 75 tonne per hour using crused aggregates of specified grading premixed with bituminous binder @ 4.50 percent by weight of total mi |
| 14 | Providing and laying bituminous concrete with 120 TPH batch type hot mix plant producing an avarage output of 75 tonne per hour using crushed aggregates of specified grading premixed with bituminous binder @ 5.4 to 5.6 percent of mix and filler , trans |
| 15 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorizing glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform a |
| 16 | Providing and fixing of pavement maker (Cat Eye) X-ASTMD-4956-04 Avery Dennison/3M (USA Make) consisting of ASA plastic housing fitted with tightly adherent plotting compound. The housing shall contain prismatic two glass covered prismatic reflective face Please Enable Macros to View BoQ information |