| 1 | Dismantling brick work in lime or cement morter including stacking of material as directed by engineer in charge within ditance of 60 meter |
| 2 | Dismantling C.C. Work in lime or cement morter including stacking of material as directed by engineer in charge within ditance of 60 meter |
| 3 | Laying soiling coat with brick ballast consolidation by hand ramming including opening out stacts sorting in ballast in to size including carriage of material 30 meter and cariage of water 200 m. including all T & P required for proper completion of work |
| 4 | Execavation of foundation including in all type of soil including lift up to 1.5m. And lead up to 30m. Including, filling watering ramming of excaveted of earth in to the space and side of the foundation of trenches as directed by engineer in charge up to distance of 30 m. |
| 5 | Laying C.C 1:3:6 in foundation with 20 to 40 mm size stone ballast inculiding 3m. Lift and lead up to 60m.with cost of all material labour and T&P etc. |
| 6 | M-150 class brick work in 1:4 cement and coarse sand Mortar including cost of all material labour T&P etc. |
| 7 | Centering & shuttering for RCC work including cost of material labour and T&P etc |
| 8 | Centering & shuttering for CC work including cost of material labour and T&P etc |
| 9 | Cutting, bending, binding & placing of reinforcement including cost of steel, labour & T&P etc complete |
| 10 | R.C.C. work 1:1.5:3 with 10-20 mm size stone grit incl. all cost of labour, material & T&P etc but execluding cost of rainforcement centring and shuttring |
| 11 | C.C. 1:1:2 in wearing coat with 10-20 mm size stone grit including cost of all material and labour T&P etc. as per direction of ingineer In charge |
| 12 | 12.5 mm thick cement plaster in 1:3 cement coarse sand on Structure including cost of all material, labour and T&P etc. complete |
| 13 | Finishing wall with water proof cement paint of approved make & quality on new work with two coats including complete material labour T&P etc. required for proper completion of work. |
| 14 | Earth work in Road Diversion/By pass & Ramp's with it's manual compection, drassing including all lead and lift as per direction of engineer In charge, Making Road Diversion & Ramp |
| 15 | Removal of Road Diversion |
| 16 | Supplying & fixing NP-2 RCC Hume pipe in road Diversion |
| 17 | Removal of NP-2 RCC Hume pipe from road Diversion as per direction of engineerIn charge |
| 18 | Brick soling on edge including filing joint's with earth and praprition of subgrade as per direction of engineer In charge with cost of all material labour & T&P |
| 19 | Hiring 5HP diesal pump including opretor and pol |
| 20 | S/F Tar felt sheet between slab & Bed Block as per direction of engineer In charge including cost of all material labour & T&P |
| 21 | Supply and fixing Angle Iron 50x50x5 on joint as per direction of engineer In charge including cost of all material labour & T&P |
| 22 | Supply and fixing of signboard as per direction of engineer In charge including cost of all material labour & T&P |
| 23 | Material testing |
| 24 | Supplying & fabrication and fixing of mild steel/ iron work grill, gates ,railling including cutting ,drilling ,welding riveting and fixing ,where necessary with fixing in position including cost of all materials, labour, tools and plants etc. required for |
| 25 | Providing and fixing of spindle rod 50mm dia of EN-8 heigh carbon steel including cost of all material, labour and T&P etc.complete. |
| 26 | Erection and fixing of trusses and other steel structures including carriage within 30 M. |
| 27 | Providing and fixing of thrust bearing for steel gate including cost of all material, labour and T&P etc.complete. |
| 28 | Glands /sleeves/chuck nut/ journal bearing without white metal including all labour,T&P etc.complete.Bronze IS : 318 Gr. 2 Spares |
| 29 | Threading and turning of 50 mm dia spindle rod including all labour,T&P etc.complete. |
| 30 | Suppllying and fixing GI pipe 75 mm dia including cost of all material, labour and T&P etc.complete. |
| 31 | Providing and fixing cap pipe hook (locking system) including cost of all material, labour and T&P etc.complete. |
| 32 | Supplying and fabrication of handle with 1\\" shaft including cost of all material, labour and T&P etc.complete. |
| 33 | Oiling and Greasing steel regulator gate including cost of all material, labour and T&P etc.complete. |
| 34 | Painting of steel regulator gate including cost of all material, labour and T&P etc.complete. |
| 35 | Carriage from workshop to site including cost of all material, labour and T&P etc.complete.(Hiring of Tractor 35 H.P and above with driver and P.O.L. with trolley.(Rs. 250 per hour maximum Rs. 2000/Day) |
| 36 | Writing letter on parapet wall including supply of all material labour and t&p etc. required for proper completion of the work. |
| 37 | 75mm dia Providing, laying, Jointing & field testing of High Density Polyethylene pipes, (HDPE) PE100 PN6 confirming to IS 4984/ 14151/ 12786/ 13488 with necessary jointing of pipes by electro fusion / butt welding process .with all leads and lifts etc. complete |
| 38 | 100mm dia Providing, laying, Jointing & field testing of High Density Polyethylene pipes, (HDPE) PE100 PN6 confirming to IS 4984/ 14151/ 12786/ 13488 with necessary jointing of pipes by electro fusion / butt welding process .with all leads and lifts etc. complete |
| 39 | 125 mm dia Providing, laying, Jointing & field testing of High Density Polyethylene pipes, (HDPE) PE100 PN6 confirming to IS 4984/ 14151/ 12786/ 13488 with necessary jointing of pipes by electro fusion / butt welding process .with all leads and lifts etc. complete |
| 40 | 150 mm dia Providing, laying, Jointing & field testing of High Density Polyethylene pipes, (HDPE) PE100 PN6 confirming to IS 4984/ 14151/ 12786/ 13488 with necessary jointing of pipes by electro fusion / butt welding process .with all leads and lifts etc. complete |
| 41 | E/W in Restoration of canal in U/S & D/S VRB with compaction incl. all cost of labour & T&P etc. |
| 42 | Providing and laying Cement concrete (1:2:4) with cement , coarse sand , and 10mm to 20mm crushed stone grit including cost of all material, labour and T&P etc.complete. |
| 43 | Finishing walls with Acrylic Smooth exterior paint of required shade : 13.46.1 New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) Please Enable Macros to View BoQ information |