|
| 1 | GST rate/ amount, SAC & Total amount incl. GST |
| 2 | Supply, loading, storing, unloading and laying of GI pipes, including supply of GI fittings/accessories including Anaconda, Fittings of all sizes & thickness like Elbows, Tees, unions, sockets, reducers, GI plugs,Sleeves etc., installation of GI line (alongwith installation of required accessories as mentioned above) of following sizes, including fabrication with supply of all materials , consumables, labour and other incidental works. Carrying out all temporary, ancillary, auxiliary works required to make the GI line ready for commissioning as per drawings specifications. |
| 3 | Scope of work indicated in PJS and other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works:Preparation and approval of schedules, execution procedures, sketches. |
| 4 | Finalisation of optimum route with consent of customer, from transition fitting to cooking oven/ appliance. |
| 5 | Making temporay but stable platforms/ scaffolding/ rope ladders and all other safety measures including safety belts wherever required. |
| 6 | Installation of GI Pipes ,Fittings, including NPT threading, painting as specified . |
| 7 | Drillings of holes through walls (Brick, RCC) , Granite, Marble, Glass Cutting with proper heavy duty hammer drill machine tools and tackles, using proper sealent /grout materialed colors to match the original replacement of damages during drillling, restoring the area to original condition. |
| 8 | Supply & Fixing of approved clamps, Dowell Plugs with screws, grout material, suitable thread sealant i.e. Teflon Tape/ lock tight, drilling of holes through tiles/ wood/ marble/ Granite etc. jointing of PE to above Ground service GI pipes, testing, purging with Nitrogen and commissioning of the complete installation as per specification. |
| 9 | Painting of entire length of pipe along with fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint complete as per specification & direction of EIC. Restoring the wall surface to origin. Preparation of Isometric Drawing, Testing of Installation at prescribed pressure and interval. |
| 10 | All above activities to be carried out as per specification to the complete satisfaction of consumer & as desired by Engineer-in-charge. |
| 11 | Handing over the completed works to GAIL for operation/ use, reconciliation of material area wise and obtaining \\"no objection certificate\\" from GAIL / PMC/CMC. |
| 12 | Any other activity not mentioned/ covered, explicitly above, but otherwise required for satisfactory completion/ safety/ statutory/ maintenance of works shall also be covered under scope of work and has to be completed by contractor within specified schedule time. |
| 13 | Measurement will be cosidered after updating data in Sahaj Portal. |
| 14 | 1/2 Inch GI Pipe, as per actual-All Floor: Pipe & all the fittings in Contractor’s scope |
| 15 | 1/2 Inch GI Pipe, as per actual-All Floor: GI pipe supplied by the Owner. All the fittings in Contractor’s scope |
| 16 | 3/4 Inch GI Pipe - as per actual-All Floor: Pipe & all the fittings shall be in Contractor’s scope |
| 17 | 3/4 Inch GI Pipe, as per actual-All Floor: GI pipe supplied by the Owner. All the fittings in Contractor’s scope |
| 18 | NOTE: |
| 19 | i))Under SOR 1.0(a) and SOR 1.0 (c) supply of GI pipes including all fittings shall be in the scope of the Contractor |
| 20 | ii)Under SOR 1.0(b) and SOR 1.0 (d) GI pipes shall be supplied by the Owner as Free Issue Material. All the fittings shall be in the scope of Contractor. |
| 21 | iii) The scope also includes connectivity from TF to regulator. |
| 22 | Supply and Installation of Copper Pipes,12.0 mm OD x 0.6 mm wall thickness, pipe is in scope of contractor: Supply and installation of copper tubing & associated fittings including brass fittings at the outlet of the meter and at the entry of appliance valve as per satisfaction of EIC. The copper tube and fittings shall be procured from approved vendors who have supplied these items for similar application earlier ,Copper tube shall be installed from the downstream of meter upto the isolation valve before the customers' appliance as per requirement and to the satisfaction of EIC. The Contractor to provide all equipment, tools and material necessary to execute the work in an efficient manner by cutting, cleaning, flux application, soldering and lacquering. The work includes supply of all tools, tackles and consumables including clamps for fixing the tubes. |
| 23 | Supply and Installation of Copper Pipes,12.0 mm OD x 0.6 mm wall thickness- Pipe in the scope of Contractor |
| 24 | Installation & fixing of meters with associated inlet and outlet connections/ fittings/adapters, valves, regulators ( 100mBar, 21 mbar), approved meter brackets and other supports by proper scaffolding/ grouting, restoring the area to original condition as per specification. (Meter and Regulator will be issued as free issue Item) Measurement will be cosidered after updating data in Sahaj Portal. |
| 25 | Domestic Meter installation (G1.6) |
| 26 | Anaconda installation (Supply in contractor scope) |
| 27 | Domestic/Service Regulator ( 100mBar, 21 mbar) with associated inlet and outlet connections/ fittings/adapters, Bracket, painting, other supports by proper scaffolding/ grouting, Restoring the area to original condition as per specification and instruction of EIC. (Regulator will be issued as free issue Item) Measurement will be cosidered after updating data in Sahaj Portal. |
| 28 | Domestic Regulator, 100mBar to 21mBar |
| 29 | Domestic Regulator, 4bar to 21 mbr |
| 30 | Service Regulator (25 SCMH/40 SCMH/65 SCMH) 4bar to 100 mbar |
| 31 | NOTE: |
| 32 | I)Technical specification of Anaconda shall be in accordance with applicable National /Interantion Stadnard, PNGRB |
| 33 | Supply and installation of Isolation & Appliance Ball Valves as per Technical Specification and as directed by EIC |
| 34 | Isolation Ball Valve 1/2 \\" max. 6 bar (g): Valves are in contractor scope |
| 35 | Isolation Ball Valve 3/4 \\" max. 6 bar (g): Valves are in contractor scope |
| 36 | Appliance Ball Valve 1/2 \\" max. 35 mili Bar (g),Valves are in contractor scope |
| 37 | NOTE: |
| 38 | I)Isolation Valves, Applicance valves in the scope of Contractor shall be in accordance with applicable National/Internation Standard, PNGRB and as directed by EIC. |
| 39 | Domestic Conversion: The work also includes installation and supply of Steel reinforced Flexible Hose as per IS 9573 (with Type as per lastest PNGRB guidelines) (Gas tube from end of Isolation Valve upto burner/stove) and conevrsion of all the burners of the LPG stove (one appliance per household) including supply of all types of burner nozzles/jets and associated controls etc. Gas hose pipe 1m /1.5 m length AS PER LATEST PNGRB STD. with nozzles for burners & other associated fittings are in scope of Contractor. appliance valve provided by GAIL as a free issue material, Measurement will be cosidered after updating data in Sahaj Portal. |
| 40 | Domestic Conversion (Domestic Appliances) |
| 41 | Pipe Laying in any unprepared surface (Katcha surface) / Normal Surface / Hard surface using open cut / Moling (without Casing) methodology. |
| 42 | Receipt, Loading, unloading, storing, reloading, tranportation, unloading, stringing and laying of PE100, SDR11/17.6 line pipes of all sizes including, proper stacking, identification,and supply & jointing of accessories of all sizes & thickness like PE Bends, Couplers, Endcaps, Tee, Reducer, CS / GI to PE Fittings (i.e. Transition Fittings of sizes 20 mm to 63 mm), Warning Mat etc. Handling, Stringing / uncoiling, aligning of the PE line pipe on the pipeline Right-of-Use / route ,laying / installation of PE line pipe alongwith required accessories as mentioned above as per specification wherever required depending on site condition including execution of all works; Storeage of material in contractor's store, fabrication, access for construction procurement and supply of all materials, consumables,equipments, labour and other inputs.In the case of free issue items, the scope also includes, receiving and loading from Owner's designated store, transportation, unloading and stacking of free issue items at Contractor's store |
| 43 | Carrying out all temporary, ancillary, auxiliary works required to make the PE pipeline ready for commissioning as per drawings. |
| 44 | Specifications, scope of work indicated in PJS and other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works: |
| 45 | Surveying of route and detours required at the time of execution including marking the same in topographical sheet, preparation of construction drawings showing survey details, and submit same to Owner for review / approval. |
| 46 | Carrying out preliminary activities such as preperation of drawings wherever required for crossing etc. |
| 47 | Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition. |
| 48 | Stacking and installation of construction markers, clearing, fencing, grubbing, cutting of trees, full filling all the requirements of various statutory/ environment authorities to the entire satisfaction of concerned authorities, grading of work area. |
| 49 | Barricading the work area as per local authorities norms & to the satisfaction of Owner/ Eingineer -in- charge, installation of safety signs. |
| 50 | Barricading the pipeline construction area prior to execution of the works as per std. drawing no. enclosed with tender document and to the entire satisfaction of owner / engineer- in -charge. |
| 51 | Laying using open trench without casing includes survey of under ground utilities (through trial pits), execution of work as per specification including Trenching to all depths by excavation in all types of soils including soft/ rocky strata and different type of pavement / footpath / roads etc. including rock breaking, chiselling or otherwise cutting etc. as required and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline as per the relevant standard/ specification etc. [The minimum depth of the top of pipeline shall be 1.0 m measured from top of pipeline to the top of undisturbed surface of the soil or as per Specification/ OISD - 226 & PNGRB latest guidelines whichever is higher]. Dewatering of trenches / pits if required as per site condition.Repairing of all damaged utilities if any, and payment of any compensation (if claimed by owner / other utility agencies) |
| 52 | Uncoiling / stringing & aligning of PE pipes, clamping, jointing of the pipe ends / fittings / valves by qualified personnel using approved electro-fusion techniques as per specification. |
| 53 | Installation / lowering the pipeline in trench to required depth as per PJS, Technical Specification & drawings, supply & placement of HDPE Yellow colour warning mat (refer PJS item no.- 4.2J) over the pipeline along the complete route as per standard drawings, data sheets & technical specifications, padding around pipeline including supply of suitable padding material duly approved by EIC , backfilling to its original condition with excavated earth / borrowed select soil/sand duly approved by EIC & its compaction & crowning. At certain specific area of ROU, trench shall be backfilled & compacted and shall be made ready for motorable.All tiles/slabs/curb stones etc removed during excavation shall be placed properly and no seperate payment shall be admissible against this activity. Restoration shall be carried as per separate SOR item mentioned elsewhere in the SOR or to be done by Owner / concerned authorities. |
| 54 | The scope of work against this item also include Electro-fusion jointing of valves, fittings wherever required and as directed by Engineer-in-charge. |
| 55 | The scope of work against laying of 20 mm/32mm pipe also includes works like making of PCC pedastal of grade (1:2:4) and size (8\\"X6\\"X4\\"), supply and installation of GI Sleeve (Heavy (C-Class) as per IS-1239), filling of sand and installation of TF (along with supply). |
| 56 | Pneumatic testing, purging with nitrogen and commissioning as per specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per the instructions of the Engineer-in-charge. |
| 57 | Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by Engineer–in–charge. |
| 58 | Maintaining the completed pipelines and installation for any defect or failures during defect liability period (i.e. 12 months from date of completion of work) . |
| 59 | Handing over the completed works to Owner for their operation/ use, reconciliation of material area wise and obtaining \\"no objection certificate\\" from Owner/PMC |
| 60 | Preparation and submission of Daily progress report, Laying Graphs / PE line cards on daily basis. |
| 61 | On completion of gas charging of pipelines. Preparation and submission of As-built drawings, crossings details, termination, utility graphs and deviation statements. |
| 62 | In case, the minimum required depth is not possible due to site condition, necessary mitigation measures shall be required to be taken by contractor in consultation with EIC as per PNGRB Guidelines. No additional payment shall be admissible against the same. |
| 63 | Submission of all documents required for contract closure in numbers as mentioned in contract. |
| 64 | Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to Owner. All the work shall be executed in accordance with the provision of contract. |
| 65 | 20 mm PE 100 pipe Service line laying upto 4 Mtr. length -(On Charged/ pressurised line)/Online GC (Applicable For already charged line/pressurized laid by other contractor) includes works like making of PCC pedastal of grade (1:2:4) and size (8\\"X6\\"X4\\"), supply and installation of GI Sleeve (Heavy (C-Class) as per IS-1239), filling of sand and installation of TF (along with supply). |
| 66 | 20 mm PE 100 pipe includes works like making of PCC pedastal of grade (1:2:4) and size (8\\"X6\\"X4\\"), supply and installation of GI Sleeve (Heavy (C-Class) as per IS-1239), filling of sand and installation of TF (along with supply). |
| 67 | 32 mm PE 100 pipe |
| 68 | 63 mm PE 100 |
| 69 | NOTE:Auto Cad drawing is mandatory in Soft and hard copy for 20mm to 125mm at the time of testing and commissioning. Scale 1:250 |
| 70 | i)The lengths of pipelines are tentative. |
| 71 | ii)For restoration of asphalt / concrete roads, the item for construction of asphalt top / concrete top / red stone / paver shall be paid separately as per the rates quoted for the same elsewhere in the SOR. |
| 72 | iii) The measurement will be made from tapping saddle on existing PE pipe of various sizes of existing network to Transition Fitting (PE to GI). The tapping saddle, Transition Fittings and other fittings shall be included in the measurement. |
| 73 | iv)Payment against SOR item no. 7.0 (a) will be applicable only in case of Ground Connectivity with Installation of TF, Pedestal and in case of ONLINE GROUND CONNECTIVITY from a existing charged/pressurised line. In case Ground Connectivity/Service Line is laid by taking tapping from Contractors's own laid line then payment shall be made as per SOR item no. 7.0 (b) |
| 74 | v)In case quantity increases beyond 4 meter (against SOR item no 7.0(a)) payment towards additional length beyond 4 Mtr shall be paid as per SOR item no. 7.0(b). |
| 75 | Laying of MDPE Pipelines - HDD Method without Casing : All equipment(fusion machine etc.), material & manpower(Jointer etc.) will be in contractor scope,MDPE pipe as FIM.All fittings are in Contractor scope.Receipt, Loading, unloading, storing, reloading, tranportation, unloading, stringing and laying of PE100, SDR11/17.6 line pipes of all sizes including, proper stacking, identification,and supply of accessories of all sizes & thickness like PE Bends, Couplers, Endcaps, Tee, Reducer, CS / GI to PE Fittings (i.e. Transition Fittings of sizes 20 mm to 63 mm), Warning Mat etc. Carrying out all temporary, ancillary, auxiliary works required to make the PE pipeline ready for commissioning as per drawings. |
| 76 | 32 mm PE 100 MDPE Pipeline |
| 77 | 63 mm PE 100 MDPE Pipeline |
| 78 | Flushing,Testing & Commissioning of MDPE line with all tools,Machines,Manpower are in contractor scope:Pneumatic testing, purging with nitrogen and commissioning as per specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per the instructions of the Engineer-in-charge. (Lines already laid)-Note* |
| 79 | 20 mm PE 100 MDPE Pipeline |
| 80 | 32 mm PE 100 MDPE Pipeline |
| 81 | 63 mm PE 100 MDPE Pipeline |
| 82 | 90 mm PE 100 MDPE Pipeline |
| 83 | 125 mm PE 100 MDPE Pipeline |
| 84 | NOTE:Under SOR Item No. 9(a), 9(b),9(c) , 9(d) and 9 ( e) old MDPE line laid by other contractor but not yet charged has to be flushed, tested, and commissioned and handed over as per the instruction and satisfaction of EIC/Owner. |
| 85 | Restoration of the roads, pavements, channels, footpaths, tiles, stones etc. to original condition including supply of the approved quality material requierd, as per local authorities norms, obtaining NOC from land owners/ third party inspection agencies/Consultant designated by GAIL and to the satisfaction of Engineer-in-charge. |
| 86 | Restroration of the all kind of pathway: Restoration by using excavated material such as tiles/pavers/granite/red stone etc by providing PCC 1:4:8 of 50mm thickness below after compaction of the filled soil, fixing the Tiles/Paver blocks/Granite etc and matching it to the existing surface. Item includes providing of extra finished material if required.such as Tiles/Paver blocks/Granite etc matching to original pathways. |
| 87 | RCC Surface including soil/earth compaction layer wise as required, reinforcement , etc all complete. |
| 88 | PCC including soil/earth compaction layer wise as required etc all complete. |
| 89 | Brick Pavement |
| 90 | Paver Block/Interlocking |
| 91 | Chauka/Red Sand Stone/Patiya/Curb Stone |
| 92 | Asphalt/Bituminous |
| 93 | Restoration of bitumen Asphalt road after laying of pipe line as per the specifications and instruction of Engineer-In-Charge. Restoration of roads shall be done as per requirement of RMC/MCD/PWD/LOCAL ASSOCIATIONS & BODIES, BUILDER, RWA and to get NOC from the concerned authorities. Restoration of the asphalt road cut portion for pipeline trench width shall be carried out by filling the bottom layer with good earth/Soil filling followed by 225mm thk. GSB & 250mm thk. WMM with top bituminous layers comprising of 50mm thk. DBM & 40mm thk. BC matching with the existing road top level. This item also includes disposal of surplus soil /debris with all lift & leads, cutting of Top layer of asphalt road by mechanized saw/cutters for maintaining straight line. |
| 94 | NOTE: |
| 95 | I) Tapping on Bituminous Road surface/Paver Block/Kaccha in the Scope of Contractor. However in the case of RCC surface payment for cutting of RCC surface shall be paid as per SOR 11.0 |
| 96 | Cutting of Road/Street/Private Pavement |
| 97 | RCC Surface |
| 98 | Testing of GI Piping already installed in customer premises. Preparation of Isometric Drawing, testing and commissioning |
| 99 | 1/2\\", 3/4\\" GI Piping |
| 100 | NOTE: |
| 101 | i) Under this SOR 12.0 (a), in customer premises where GI piping already installed shall be tested and Isometric drawing shall be prepared and commissioned by the contractor. Payment shall be made for such old GI pipe under this SOR.Testing, commissioning of any additional GI piping installed by the contractor shall be paid in accordance with SOR 1.0. Contractor has to do the testing and commissioning of entire GI connection in cusotmer house before conversion. |
| 102 | Domestic Registration, Collection of Cheques as per Plan and collection & uploading documents, entry in GAIL's Portal for creation of Business Partner No.(Payment terms before SD collection,JMR) |
| 103 | Assistance in carrying out the work of Domestic PNG registration as per directions/instructions of the Marketing In charge of GAIL (I) Limited / Authorized representative including but not limited to following: 1) Enrolment & Registration of Domestic PNG Customers as per the given target. Carrying out the marketing activities for Domestic PNG connection as detailed in Scope of work, complete in all respects, as per directions/instructions of the Marketing In Charge including but not limited to the following: Distribution of leaflets & FAQ, Installation of banners, to be provided by client, at prime location, Awareness cum Registration Camp, Audio / Visual Presentations, Organizing Road Shows, etc. |
| 104 | Assistance in carrying out the work of Domestic PNG SD Collection as per directions/instructions of the Marketing In charge of GAIL (I) Limited / Authorized representative including but not limited to following: 1) Collection of filled up form along with Cheque/Demand Draft of Security Deposit amount and documents All other activities as may be required to complete the work in all respect is defined in the Scope of work to be read along with the Special Conditions of Contract and as per instructions of EIC. Carrying out the marketing activities for Domestic PNG connection as detailed in Scope of work, complete in all respects, as per directions/instructions of the Marketing In Charge including but not limited to the following: Distribution of leaflets & FAQ, Installation of banners, to be provided by client, at prime location, Awareness cum Registration Camp, Audio / Visual Presentations, Organizing Road Shows, etc. |
| 105 | Core cutting of RCC Slab/Floor/Roof/Pillar/Beam for GI Riser (1/2\\",3/4\\"/1\\") in Multi-Storey Apartments/Independent House |
| 106 | RCC Structure |
| 107 | Dismantling of existing GI Installation, fittings etc. as per direction of EIC |
| 108 | 3/4\\" GI |
| 109 | 1/2\\" GI |
| 110 | Copper Pipes, 12.0 mm OD x 0.6 mm wall thickness |
| 111 | Domestic Meter (G1.6) |
| 112 | Domestic Regulator (2.5 SCMH) |
| 113 | Re-Installation (dismantling and re-routing) of GI Installation, fittings etc. as per the direction of EIC. |
| 114 | 3/4\\" GI |
| 115 | 1/2\\" GI |
| 116 | Copper Pipes, 12.0 mm OD x 0.6 mm wall thickness |
| 117 | NOTE:GI pipes and Copper pipes removed from Customer premises shall be re-installed by the contractor as per the Instruction and direction of EIC. Any additional lengh of pipe shall be paid as per applicable SOR items 1.0 and 2.0 respectively. Any additional fittings required for completion of work shall be in the scope of Contractor. |
| 118 | Valve Pit Chamber (RCC): Constructing valve pit chamber in RCC of grade M-25 over 75 mm thick levelling course in 1:4:8 mix including 16 mm thick plastering with cement mortar 1:3 (1 cement : 3 coarse sand) and PCC pedestal for Valve support (if required) complete as per specification, drawings and direction of EIC. Valve Pit Chamber shall be covered with 150 mm thick RCC top slab of M-25 grade with manhole cover (medium duty) along with frame as per IS 1726. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 45 grade cement, reinforcement, CI manhole cover, PVC coated rungs, inserts including excavation and backfilling, masonry works, plastering, etc. with all bye works and sundry works. |
| 119 | Type-I having Internal size of Minimum 1000 x 1000mm |
| 120 | Type-II having Internal size of Minimum 600 x 600mm |
| 121 | NOTE:The tender drawing enclosed is only for reference purpose and contractor shall be required to prepare drawings (in line with reference tender drawing) for specific sizes of Valve pits and the same shall be approved by EIC. |
| 122 | Installation of valve in pit including supply of valves: Supply of isolation valves (as per data sheet) and installation of valves in the valve pits as per typical drawing and specification enclosed and instructions of Engineer-in-charge. Payment of valve pits shall be paid separately as per SOR. |
| 123 | PE Valve 32 mm dia |
| 124 | PE Valve 63 mm dia |
| 125 | PE Valve 90 mm dia |
| 126 | PE Valve 125mm dia |
| 127 | Fabrication & Installation of Markers |
| 128 | Supply, fabrication and installation of RCC Route Markers , Plate Markers & Pole marker with foundation as per the attached drawings, along the route including all associated civil works such as excavation and construction in all types of soils, construction and pedestals and grouting with concrete. |
| 129 | RCC Route Markers |
| 130 | Warning Plate Markers |
| 131 | Pole Marker with foundation |
| 132 | PNG CONNECTIONS IN (ON EXISTING RISER) Basic Rate- Supply and installation from existing riser to appliance along with meter installation. within 4m after lateral isolation valve upto appliance along with installation of meter . Additional quantity above 4 Meters (GI + Cu) shall be payable only in case cumulative length exceeds 4 m. Measurement will be cosidered after updating data in Sahaj Portal.all type of resources to be deployed for the work at height like, Jhula, safety belt, safety rope etc. |
| 133 | PNG CONNECTIONS IN O&M AREA(Gasified)/ connection from gas charged line Basic Rate- Installation & fixing of meters with associated inlet and outlet connections/ fittings/adapters, valves, regulators , approved meter brackets and other supports by proper scaffolding/ grouting, restoring the area to original condition as per specification. (Meter and Regulator will be issued as free issue Item ) .Installation from existing riser to appliance along with meter installation. within 4m after lateral isolation valve upto appliance along with installation of meter . other items including supply of GI fittings/accessories including Anaconda, Fittings of all sizes & thickness like Elbows, Tees, unions, sockets, reducers, GI plugs,Sleeves etc in contractor scope. Additional quantity above 4 Meters (GI + Cu) shall be payable in SOR 1.0 only in case cumulative length exceeds 4 m. GI pipe supplied by the Owner. Measurement will be cosidered after updating data in Sahaj Portal. This SoR item will be applicable only for existing/old Riser connections. Supply of isolation valve will be paid through the sepearte SOR line items |
| 134 | HIGH RISE SEGMENT (4th Floor and above) |
| 135 | LOW RISE SEGMENT (G+3 Floor) |
| 136 | Painting of GI Pipes with Synthetic enamel yellow Paint: Painting - GI pipes where paint has been shed off , painting of above ground at all heights of GI pipe along with fittings of various sizes installed at domestic connection after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint complete as per specifications & directions of EIC. Restoring the pipe surface by cleaning with sand paper /pasting of the corresponding paint to original as per instructions &to the satisfaction of the EIC. Paint should be from reputed manufactures such as Narolac/Asian/ Berger etc |
| 137 | Construction of a pedestal surrounding the GI sleeve at the transition fitting location of the MDPE pipe and GI pipe in the O&M area on the existing service line. (Not applicable in case of New service line) |
| 138 | GI sleeve upto 2.5 inch and length 1 feet with concreat foundation etc. complete. |
| 139 | Concrete half sleeve 2.5 inch and length 1 feet including HDPE pipe, clamp etc. complete. |
| 140 | Excavation of Hard Rock: Trenching of Hard Rock is defined as trench material with a single piece of rock, dimension exceeding 1 meter in any direction, which requires cutting only by use of manual/pneumatic chisel/drill or sledge hammer and chisel or removal of same by additional techniques and supply of approved coarse sand (Size 0.6-2 mm as per IS 383) free from any impurities like clay, mica and soft flaky pieces for padding of 150 mm above and below laid pipeline as per the specifications |
| 141 | Crossing of sewage Drain/Nala alongside of independent houses where Drain/Nala are being encountered adjacent to houses the scope of work include supply of medium duty GI caising pipes of 2.5 inches, alongwith padding with sand stone and civil works associated for contruction of cover slab. |
| 142 | Supply of valve chamber cover for MDPE valve chamber |
| 143 | RCC Valve Chamber Cover of diameter approximately 22 inch-26 inch as per site condition |
| 144 | COMMERCIAL METER: Installation & fixing of commercial meters alongwith box such as G4, G6,G10, G16 and G25 etc with associated inlet and outlet connection fittings, meter brackets(if required), pipe supports etc, by using proper scaffolding. Restoring the area to original completre as per specification. COMMERCIAL METER alongwith box is a free issue material. |
| 145 | COMMERCIAL REGULATORS: Installation & Fixing of commercial regulators (0.5 - 6 bar to 300/ 500 mbar) -10 SCMH to 65 SCMH capacity with associated inlet and outlet connection fittings with required supports. Restoring the area to original completre as per specification. COMMERCIAL REGULATOR is a free issue material. |
| 146 | Electr-fusion Joint of PE pipeline network for Dia-125mm, 90mm, 63mm, and 32mm including electrofusion jointing and restoration of pits, Supply & installation of all types of MDPE fittings as Coupler, Elbows, End caps and etc. (SDR-11) & required tools/tackles. Cost of hiring of JCB / Hydra and other manpower for pit opening, closing and jointing will be included in this SOR. This SOR is applicable for old MDPE line laid by other contractor. |
| 147 | 125mm Please Enable Macros to View BoQ information |