| 1 | Repairing of Pump having 6”x6”of suction/ delivery by carrying out following works (Old material to be retained by firm). Repairing of storm water pump i/c dismantling of pump set from base frame by cutting of nut bolts of suction side and delivery side and holding of delivery line by dead flange and thrust support and suction line by holding with tripod arrangement i/c loading/ unloading by skilled labour, to & fro cartage along with replacement of its parts/ accessories i/c gland plate/ spilt gland, MS Lock nut with Lock washer, Keys of impeller & coupling, stud of Gland plate and all packings i/c oiling, greasing, replacement of required body studs & nuts, coupling tyre, required machining works for proper balancing of complete pump unit and minor repair works and dynamic balancing with existing motor i/c installation, testing and commissioning on full load etc. as required complete in all respects. |
| 2 | Repairing of pump shaft |
| 3 | Repairing of pump shaft sleeve |
| 4 | Repairing of Impeller |
| 5 | Replacement of pump bearing |
| 6 | Providing of M.S. coupling guard made of suitable size M.S. Angle iron welded/ joint with M.S. Sheet of minimum size of 3 mm or as suitable and M.S. cross welded net, over the pump set coupling. Fixing of coupling guard with required nut, bolts etc., by drilling holes on base frame and duly painted complete in all respects as required. |
| 7 | Repairing of Pump having 10”x10”of suction/ delivery by carrying out following works (Old material to be retained by firm). Repairing of storm water pump i/c dismantling of pump set from base frame by cutting of nut bolts of suction side and delivery side and holding of delivery line by dead flange and thrust support and suction line by holding with tripod arrangement i/c loading/ unloading by skilled labour, to & fro cartage along with replacement of its parts/ accessories i/c gland plate/ spilt gland, MS Lock nut with Lock washer, Keys of impeller & coupling, stud of Gland plate and all packings i/c oiling, greasing, replacement of required body studs & nuts, coupling tyre, required machining works for proper balancing of complete pump unit and minor repair works and dynamic balancing with existing motor i/c installation, testing and commissioning on full load etc. as required complete in all respects. |
| 8 | Repairing of pump shaft |
| 9 | Repairing of pump shaft sleeve |
| 10 | Repairing of Impeller |
| 11 | Replacement of pump bearing |
| 12 | Providing of M.S. coupling guard made of suitable size M.S. Angle iron welded/ joint with M.S. Sheet of minimum size of 3 mm or as suitable and M.S. cross welded net, over the pump set coupling. Fixing of coupling guard with required nut, bolts etc., by drilling holes on base frame and duly painted complete in all respects as required. |
| 13 | Repairing of 40 HP Electrical Motor by carrying out following works (Old material to be retained by firm) Repairing of following rating Electrical Motor by rewinding, varnishing including dismantling of motor from pump by heavy labour i/c loading, unloading, to & fro cartage, complete with repairing of connection plate, fan, fan cover and required balancing, making connection, installation, testing & commissioning on full load etc. as required complete in all respects. |
| 14 | Replacement of bearing (support bearing) |
| 15 | Replacement of bearing (load bearing) |
| 16 | Repairing of Sluice valve of 150 mm dia by carrying out following works (Old material to be retained by firm) Making of flap |
| 17 | Making of spindle (SS) |
| 18 | Repairing of Guide way of flap |
| 19 | Making of GM nut |
| 20 | Fixing of GM Ring on the flap |
| 21 | Providing/ fixing of operating wheel |
| 22 | Replacing of Housing Bolts |
| 23 | Providing/ fixing of gland housing |
| 24 | Removing of broken studs from housing |
| 25 | Dismantling, assembling charges i/c rubber packing, cartage etc. |
| 26 | Repairing of Sluice valve of 250 mm dia by carrying out following works (Old material to be retained by firm) Making of flap |
| 27 | Making of spindle (SS) |
| 28 | Repairing of Guide way of flap |
| 29 | Making of GM nut |
| 30 | Fixing of GM Ring on the flap |
| 31 | Providing/ fixing of operating wheel |
| 32 | Replacing of Housing Bolts |
| 33 | Providing/ fixing of gland housing |
| 34 | Removing of broken studs from housing |
| 35 | Dismantling, assembling charges i/c rubber packing, cartage etc. |
| 36 | P/F of onload changeover switch four pole in existing cubical panel with advance neutral conforming to cIS13947(part 3) including drilling holes in cubicle panel making connections etc complete as required of 250A |
| 37 | P&F of Fully Automatic Star Delta Starter in steel sheet Enclosure with SPP and overload relay feature i/c connections etc. complete as required for 50 HP 3-phase 415V 50Hz motor Please Enable Macros to View BoQ information |