| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.7.4 Hard Rock (Blasting Prohibited) |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soils |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 4 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:with. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) |
| 6 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with Cement mortar 1:6 (1 Cement : 6 coarse sand) |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. |
| 9 | Dry random rubble masonry with hard stone in foundation and plinth/ superstructure with bond stones. |
| 10 | Providing and laying of coping 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 11 | Construction of crate work by way of handpacking of stones in wire crates including cost of stones & crates with 4 mm dia GI wire conforming to IS :280 and IS 4826 in 100 mm x100 mm mesh (woven Diagonally) |
| 12 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 13 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. 1000 mm dia. R.C.C. pipe (laying by manual/mechanical means) |
| 14 | Backfilling with stones including cost of stones, in horizontal on level (behind walls ) |
| 15 | Carriage of sand from source to site of work for an avg. lead of 123 km by MT including loading/unloading complete |
| 16 | Carriages of Stone Aggregate from source to site of work by MT for an average lead of 18.00 km including loading and unloading complete |
| 17 | Carriages of Stones from local site/ nallah by MT for an average lead of 10.00 km including loading and unloading complete |
| 18 | Carriage of hume pipes from source to site of work for an avg. distance of 83 km MT including Loading Unloading Complete Please Enable Macros to View BoQ information |