| 1 | Transportation of D.C. Rig machine & its T&P from store to the site of TW. |
| 2 | Carting of rig Machine from store to site of works. |
| 3 | Carting of rig Machine’s T&P by Truck from store to site. |
| 4 | Loading and unloading of Rig Machine’s T&P |
| 5 | Return Trip of above after competition of work. |
| 6 | Transportation of T.W. Assembly from store to the site of Tube well. |
| 7 | Crating of T.W. Assembly by Truck from store to site |
| 8 | Loading and unloading of T.W. assembly |
| 9 | Transportation of D.C. Rig machine & its T&P from store to the site of TW. |
| 10 | Toing of 600 P.S.I air Compressor by tractor from store to site |
| 11 | Carting of compressor’s T&P by Truck from store to site |
| 12 | Loading and unloading of Compressor’s T&P |
| 13 | Return Trip of above after competition of work. |
| 14 | Transportation of O.P Unit and its T&P from store to the site. |
| 15 | Toing of O.P. Unit by tractor from store to site |
| 16 | Carting of O.P. Unit T&P by Truck from store to site |
| 17 | Loading and unloading of O.P. Unit T&P |
| 18 | Return Trip of above after competition of work. |
| 19 | Transportation of pumping plant from store to the site. |
| 20 | Carting of Pumping plants material by Truck from store to site |
| 21 | Loading and unloading of pumping plant’s material. |
| 22 | Tube well Assembly |
| 23 | 300mm Dia 7.1mm thick MSERW Housing pipe |
| 24 | 300x200 mm dia M.S. Reducer |
| 25 | 200mm Dia 7.1mm thick MSERW plain Pipe |
| 26 | 200mm Dia 7.1mm thick MSERW Slotted Pipe |
| 27 | 200mm dia Bail Plug |
| 28 | 300 mm dia M.S. Clamp |
| 29 | 300 mm dia well cap |
| 30 | 300 mm dia M.S. Ring |
| 31 | 200 mm dia M.S. Ring |
| 32 | 300 mm dia Tubewell assembly support |
| 33 | 300 mm M.S. Center Guide |
| 34 | Pea Gravel- Supply of Lal kaun quarry Pea Gravel 1.6 to 4.8mm size duly screened, washed and stacked, with carting loading, un loading complete at site |
| 35 | DRILLING OF TUBE WELL BORE : Installation of rig Machine along with dressing the site of work then drilling by 200/300 mm size bit up to 300m depth then reaming by 450mm, 550mm, and 625mm size bits, after drilling the dismantling work will be done. |
| 36 | Erection of DC rig Machine, T&P and camp equipages. |
| 37 | Dismantling of rig Machine and its T&P |
| 38 | Drilling of 625 mm dia bore from GL to 65 M. BGL |
| 39 | Drilling of 500 mm dia bore from 65 to 80 M. BGL |
| 40 | Drilling of 500 mm dia bore from 80 to 120 M. BGL |
| 41 | Drilling of 500 mm dia bore from 120 to 160 M. BGL |
| 42 | Drilling of 500 mm dia bore from 160 to 200 M. BGL |
| 43 | Drilling of 500 mm dia bore from 200 to 240 M. BGL |
| 44 | Drilling of 500 mm dia bore from 240 to 250 M. BGL |
| 45 | Water arrangement charges for during the drilling work |
| 46 | Logging of bore hole by electric logger |
| 47 | Barricading of Tw site for safety with necessary T&P and required lobour etc. complete. |
| 48 | LOWERING OF TUBE WELL ASSEMBLY AND SHROUNDING OF PEA- GRAVEL : Lowering of 300/200mm dia size tube well assembly from ground level to 230M below ground level including gravelling work etc. complete. |
| 49 | 300 mm dia Housing PIPE from G.L TO 60 M. BGL |
| 50 | 200 mm dia Plain/Slotted PIPE from 60M. BG.L TO 80 M. BGL |
| 51 | 200 mm dia Plain/Slotted PIPE from 80M. BG.L TO 120 M. BGL |
| 52 | 200 mm dia Plain/Slotted PIPE from 120M. BG.L TO 160 M. BGL |
| 53 | 200 mm dia Plain/Slotted PIPE from 160M. BG.L TO 200 M. BGL |
| 54 | 201 mm dia Plain/Slotted PIPE from 160M. BG.L TO 200 M. BGL |
| 55 | 200 mm dia Plain/Slotted PIPE from 200M. BG.L TO 230 M. BGL |
| 56 | Development of tube well by 600 P.S.I air compressor |
| 57 | Erection of 600 PSI Air- Compressor, T&P and camp equipages |
| 58 | Development of T.W. by 600 PSI Air Compressor upto 100 hrs |
| 59 | Dismantling of Air Compressor and its T&P. |
| 60 | Development of tube well by O.P Unit |
| 61 | Erection of O.P. Unit T&P and camp equipages. |
| 62 | Development of T.W. by O.P. Unit 100 hrs |
| 63 | Dismantling of O.P. Unit its T&P. |
| 64 | Yield and verticality test of T.W. along with chemical and Bacteriological analysis of tubewell’s water. |
| 65 | Cleaning of site for soil and including filling of pit and disposal lead up to 10km for way from site by tractor trolly and labour including loading unloading after completion of drilling and development work (PWD-231(a)+235(a)-I+II). |
| 66 | Watch and ward during working period by two chowkidar day- night (PWD-Chapter -2(18). |
| 67 | Eletrical loggig of the Bore |
| 68 | Main piping and valve, 150 mm dia 5.4 mm hick MS. column pipe with both end flanged and groove for passing of submersible cable in each lenth in 3m long Total 24m with 1m longs top pipe with cap (Damdam) and sealing ring, C1-D/F 90 bend of size 150 mm dia, Cl-A/F tee of size 150 mm dia, M.S. Distance piece of 150 mm dia 1.00m long 2 Nos and 1.5m long1 No., M.S. enlarger/reducer of suitable size, 150mm dia Sluice Valve (Confirming to 15.780/1S.2905)f, 150 mm dia Reflex Valve (Confirming to IS-5312 No part-1) |
| 69 | S/F of 150mm dia long ms D/F column pipe extra to SI No-3 Please Enable Macros to View BoQ information |