| 1 | Demolition of concrete of any description and in any position not otherwise specifically provided for as directed by Engr-in-charge.( Note : The concrete shall be demolished in panels /as required at site . In panels the concrete shall be cut sharply around all the four edges/edges as per site by diamond cutter upto the full depth of concrete, before demolition of panels without disturbing the existing concrete in adjacent panels. |
| 2 | Earth work in excavation by mechanical means (Hydraullic excavator) over areas not exceeding 1.5m in depth, getting out in hard and dense soil (WBM/GSB) complete all as specified and as directed. |
| 3 | Earth work in excavation by mechanical means (Hydraullic excavator) over areas not exceeding 1.5m in depth, getting out in any type of soil complete all as specified and as directed. |
| 4 | Removing demolished concrete debris (retrieved from PQC/DLC) to the crusher plant, not exc 5km distance including loading, Unloading, depositing and stacking at the destination , complete all as specified and as directed. |
| 5 | Removing the surplus/unserviceable concrete debris obtained from item No. 1 here-in-before and item No 7 here-in-after loading and unloading and depositing outside MoD land. Disposal of debris outside MoD land disposal of debris outside MoD land is the responsibility of contractor and no extra payment will be allowed for lead and lift for removal and deposition of debris beyond the MoD land complete all as specified and directed. |
| 6 | Removing the excavated soil to a distance including loading and unloading and depositing outside MoD land. Disposal of debris outside MoD land is the responsibility of contractor and no extra payment will be allowed for lead and lift for removal and disposal of debris beyond the MoD land complete all as specified and directed.. |
| 7 | M&L for crushing of demolished concrete obtained from item No.1 above by using stone crusher to required grade (grade V of Table 400-1of MoRTH specifications for Road and Bridge works, 2013) including stacking the crushed material for reuse as in GSB complete all as specified all as directed. |
| 8 | Rolling and consolidating formation surface in cutting to the required gradient and camber including filling in depression and hollow, watering, leveling etc. complete using power roller exceeding 8 tonne and not exceeding 12 tonne capacity complete all as specified and as directed.Note:- Rolling and consolidating formation surfaces in cutting to the required gradient and camber under optimum moisture conditions to achieve at least 98% of maximum dry density determined using modified proctor density method as per revelant IS code. |
| 9 | M&L for laying and compacting 150 mm thick (compacted thickness) Granular Sub Base Course (GSB) grading as per Grade V using pulverised demolished concrete obtained from item no.7 herein before, including adding any deficient material to obtain the desired grading as specified Table 400-1 of MoRTH specifications for Road and Bridge works, 2013, in a single layer over compacted subgrade with naturaI sand, crushed gravel, crushed stone, crushed slag' or combination there of as per the grading required The materials are mechanically mixed, spread and leveling on the subgrade by using motor grader of adequate capacity, and rolling with vibratory roller of capacity 80-100 KN static weight for achieving required compaction density of atleast 98% of the Maximum Dry Density. Consolidating to required gradient and camber with finished surface tolerances as per Table 900-1 of MoRTH specifications for Road and Bridge works, 2013. complete all as specified and directed.Note:- 1) The rate includes pulverization, grading as per GSB grade V and lead of crushed material to the laying location. |
| 10 | M&L for laying and compacting 250 mm thick (compacted thickness) Granular Sub Base Course (GSB) grading as per Grade V using pulverised demolished concrete obtained from item No. 07 herein before,including adding any deficient material to obtain the desired grading as specified Table 400-1 of MoRTH specifications for Road and Bridge works, 2013, in two layers of 125mm each over compacted subgrade with naturaI sand, crushed gravel, crushed stone, crushed slag' or combination there of as per the grading required The materials are mechanically mixed, spread and leveling on the subgrade by using motor grader of adequate capacity, and rolling with vibratory roller of capacity 80-100 KN static weight for achieving required compaction density of atleast 98% of the Maximum Dry Density. Consolidating to required gradient and camber with finished surface tolerances as per Table 900-1 of MoRTH specifications for Road and Bridge works, 2013. complete all as specified and directed.Note:- 1) The rate includes pulverization, grading as per GSB grade V and lead of crushed material to the laying location. |
| 11 | M&L for laying and compacting 150 mm thick (compacted thickness) Granular Sub Base Course (GSB) grading as per Grade V as specified Table 400-1 of MoRTH specifications for Road and Bridge works, 2013, in a single layer over compacted subgrade with naturaI sand, crushed gravel, crushed stone, crushed slag' or combination there of as per the grading required The materials are mechanically mixed, spread and leveling on the subgrade by using motor grader of adequate capacity, and rolling with vibratory roller of capacity 80-100 KN static weight for achieving required compaction density of atleast 98% of theMaximum Dry Density. Consolidating to required gradient and camber with finished surface tolerances as per Table 900-1 of MoRTH specifications for Road and Bridge works, 2013, complete all as specified and directed. |
| 12 | M&L Laying and compacting 150 mm thick (compacted thickness) Wet Mix Macadam (WMM) laid in two layers of 75 mm each grading as per table 400-13 of MoRTH specifications for Road and Bridge works 2013 manufactured in WMM plant, material comprising of clean, crushed, graded aggregate and granular material premixed with water to a dense mass, spreading with sensor paver and rolling with vibratory roller of capacity 80-100 KN static weight and consolidating to required gradient and camber. The finished surface tolerances to be as per Table 900-1 of MaRTH specifications for Road and Bridge works 2013 complete all as specified and directed by Engr-in-charge Please Enable Macros to View BoQ information |
| 13 | M&L Laying and compacting 150 mm thick (compacted thickness) Wet Mix Macadam (WMM) laid in two layers of 75 mm each grading as per table 400-13 of MoRTH specifications for Road and Bridge works 2013 manufactured in WMM plant, material comprising of clean, crushed, graded aggregate and granular material premixed with water to a dense mass, spreading with sensor paver and rolling with vibratory roller of capacity 80-100 KN static weight and consolidating to required gradient and camber. The finished surface tolerances to be as per Table 900-1 of MaRTH specifications for Road and Bridge works 2013 complete all as specified and directed by Engr-in-charge Please Enable Macros to View BoQ information |