|
| 1 | Preparation of old plastered surfaces by brooming down or steel wire brushing, scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spot and M&L for applying one coat of cement base paint on walls complete all as specified and directed. Note: Work shall be carried out in bldgs with height upto 8 storeies. |
| 2 | Preparation of old plastered surface by brooming down or steel wire bruhing scrapping down smoke soot mouds, mess & effloresent salt and trading oil & greasy spot and M&L for applying one coat of 100% premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over complete all as specified and directed. Note: Work shall be carried out in bldgs with height upto 8 storeies. |
| 3 | Complete removal of existing treatment of wall surfaces damaged due to seapage/dampness/fungal growth by using electric sander machine to remove all dust and loose scales etc and prepare to receive wall care putty complete all as specified and directed. Note: Work shall be carried out in bldgs with height upto 8 storeies. |
| 4 | M&L for applying two coats of 100% premium acrylic exterior emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over new surfaces complete all as specified & as directed |
| 5 | Preparation of old painted surfaces of steel & iron surface of any description over 10 Cm width or girth and M&L for applying one coat of synthetic enamel paint complete all as specified and directed. Note: Work shall be carried out in bldgs with height upto 8 storeies. |
| 6 | Preparing old wooden surfaces of any description over 10 cm width or girth and M&L for applying one coat of synthetic enamel paint complete all as specified and directed. Note: Work shall be carried out in bldgs with height upto 8 storeies. |
| 7 | Preparation of plastered and unplastered surfaces of old decorated walls and M&L for applying a one coat of acrylic oil emulsion distemper complete all as specified and directed. Note: Work shall be carried out in bldgs with height upto 8 storeies. |
| 8 | Preparation of plastered and unplastered surfaces of old decorated ceilings by brooming down or steel wire bruhing scrapping down smoke soot mouds, mess & effloresent salt and trading oil & greasy spot and M&L for applying one coat of acrylic oil emulsion distemper complete all as specified and directed |
| 9 | Grubbing up and uprootinng of trees / plants from external walls of bldgs upto 8 storyed height pouring muratic acid for burning risidual roots in any . Racking out the dead roots from plants/concrete joints upto its penetrated portion and M&L for filling with PCC (1:2:4) using 20 mm graded stone aggregates and finishing the surface with 15 mm thick rendering in CM (1:4) mixed with WPC @ 2% complete all as specified and directed. Note: WPC shall be measured and paid separately |
| 10 | Demolition of PCC in ground floor and pavings not exc 15 cm thickness below or above ground level including removal of all debris outside MoD land complete all as specified and directed. |
| 11 | M&L for 75mm thick PCC (1:3:6), type C-2 using 40mm graded stone aggregate as in plinth protection, surface finished even & smooth without using extra cement complete all as specified and directed. |
| 12 | Taking down cement plaster on brick or stone wall surfaces including glazed tiles wherever exists including raking out joints, hacking for key and scrubbing down with water including removal of all debris outside MoD land complete all as specified and as directed. |
| 13 | M&L for Rendering 20 mm thick in two layers (Top 10mm thick rendering coat mixed with water proofing compound shall be laid over 10mm thick plastered surface) with CM (1:4) on brick work or concrete surfaces finished the surface even and smooth without using extra cement to match the existing surface complete all as specified and directed.Note: WPC shall be measured and paid separately |
| 14 | M&L for 5mm thick plastering on ceiling surfaces in CM (1:3) surface finished even and fair complete all as specified and directed. |
| 15 | Supply only Integral water proofing compound complete all as specified and directed. |
| 16 | M&L for 1mm thick wall care putty on wall including rubbing with sand paper to achieve a smooth surface & sharp straight edges etc complete all as specified and directed. Note: Work shall be carried out in bldgs with height upto 8 storeies. |
| 17 | Demolition of brickwork or stone boulder masonry, built in cement mortar or cement lime mortar including all quoins,arches, pillars,etc. but excluding ashlar facings, dressed stonework and precast concrete articles including removal of all debris outside MoD land complete all as specified and directed. |
| 18 | M&L for brick work with flyash old size bricks, straight or curved on plan exc 6m mean radius, built in CM (1:6) complete all as specified and directed. |
| 19 | M&L for brick work with flyash old size bricks, straight or curved on plan to any radius in half brick thick walling built in cement mortar 1:4 complete all as specified and directed. |
| 20 | Dismantling of stone slabs and tiles of any description or thickness in floors,aprons etc laid, bedded & pointed in any mortar including removal of all debris outside MoD land complete all as specified and directed. |
| 21 | M&L for Granite(of any type) 18-20 mm thick for slab machine cut, bedded & jointed with grey cement slurry & pointed with white cement with admixture of pigment to match the shade of granite stone over & including 15 mm thick screed bed in cement mortar 1:4 including grinding & polishing fixed in slab/steps complete all as specified and directed. |
| 22 | Dismantling of 100mm cast iron or reinforced concrete drain pipes, jointed in cement mortar and taking out of trenches, if required complete all as specified & as directed. |
| 23 | S&F 110mm bore PVC(SWR) pipe single socket in any length rubber ring joints complete all as specified and directed. |
| 24 | S&F 110mm dia PVC (SWR) pipes double socketed in any length with rubber ring joints fixed to walls complete all as specified and directed. |
| 25 | S&F 110mm bore PVC(SWR) pipe bend single socket complete all as specified & as directed. |
| 26 | S&F 110mm PVC (SWR) WC connector bent type complete all as specified & as directed. |
| 27 | Removing/taking down of old water proofing treatment from roof and concrete surface & cleaning of the roof surface with wire brush to make it free from dust, dirt etc including removal of all debris outside MoD land complete all as specified and directed . |
| 28 | M&L for bedding layer of mortar 20 mm thick finished fair and even in CM 1:4 mixed with liquid water proofing compound on roof complete all as specified and directed. |
| 29 | M&L for APP based polymeric membrane minimum weighing 3kg/sqm and minimum 3mm thick reinforced with polyster non woven fabric (wt. not less than 150 gms/sqm) by forced application laid over bitumen primer @ 0.40 Litre/Sqm complete all as specified and directed. Please Enable Macros to View BoQ information |