| 1 | Excavation in trenches in any type of soil not exceeding 1.5 meter wide and not exceeding 1.5M in depth for laying of Cables, poles, stay and getting out of excavated material complete all as specified and directed by Engineer-in-Charge |
| 2 | Excavation in Trenches exc. for each additional 1.5m or part thereof in depth beyond the first 1.5 m for laying of steel tubular pole/Stays, etc., getting out including forming bottom surface to required level and gradient in Soft/ Loose Soil and getting out, complete all as specified and as directed. |
| 3 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25cm thick each, excavated soil in trenches after the cables have been laid and tested complete all as specified and directed by Engineer-in-Charge |
| 4 | Removal of surplus soil to a distance not exc. 50m and deposited where directed at a level not exc. 1.5 m above the starting point all as specified and as directed. |
| 5 | M&L for sand cushioning as per para 19.75 of SSR Part-I(2009) in trenches for underground cable protection and consolidated and compacted with clean dry sand complete all as specified and directed by engineer-in-charge.NOTE: Punned thickness only shall be measured for payment. |
| 6 | M&L for Brick protection with subclass ‘B’ bricks old size, laid dry, flat over cable perpendicular across the cable in trenches complete all as specified. |
| 7 | Laying Only Serviceable Bricks after cleaning by wire brush obtained from taking out unserviceable LT cable in connected items here-in-after. |
| 8 | Taking out of interlocking paver block, any shape or size and Re-laying the same after removing all vegetation, algae, grass etc, laid to proper slope & gradient over sand cushioning complete all as specified and directed.(NOTE: Sand, if required for correction of cushioning level will be measured and paid separately. |
| 9 | Material and labour for machine pressed precast concrete interlocking paver block with grey cement and pigment of any shape and size as approved by GE conforming to IS 15658-2006 of 60 mm thickness, M-35 grade complete all as specified and directed. |
| 10 | Taking down unserviceable LT cable for repair/ replacement etc (from cable duct/underground trench / pole), stacking properly (cable, pipe and bricks) complete all as directed by the Engr-in-Charge of the following cross - sections :- (Note :- Necessary earth work to be measured and paid separately. |
| 11 | 10 sqmm 4 core to 16 Sqmm, 4 Core |
| 12 | 25 Sqmm to 35 Sqmm, 3.5 core |
| 13 | Relaying of XLPE insulated, screened PVC bedded, galvanised steel strip or wire armoured electric power cable 1100 Volts grade with stranded aluminium conductor cable, laid in trench or fixed to wall / passing through pipe/ pole. (retrieved against item No 1 above) incl necessary aluminium thimbles, jointing and testing complete all as specified and directed for the following sizes and cross sectional area :- (Note :- Necessary earth work to be measured and paid separately. |
| 14 | 10 sqmm 4 core to 16 Sqmm, 4 Core |
| 15 | 25 Sqmm to 35 Sqmm, 3.5 core |
| 16 | Supply, Laying, jointing and testing XLPE insulated, screened PVC bedded, galvanised steel strip or wire armoured electric power cable 1100 Volts grade with stranded aluminium conductor cable, laid in trench or fixed to wall/passing through pipe/pole incl necessary thimbles complete all as specified and directed for the following sizes and cross sectional area :- (Note :- Necessary earth work to be measured and paid separately. |
| 17 | 10 Sqmm, 4 core |
| 18 | 16 Sqmm, 4 core |
| 19 | 25 Sqmm, 4 core |
| 20 | 35 Sqmm, 3.5 core Please Enable Macros to View BoQ information |
| 21 | 35 Sqmm, 3.5 core Please Enable Macros to View BoQ information |