| 1 | Earth work in excavation in foundation in all types of soil mixed with charri, bajari, kankar, soft rock, hard rocks etc. including wet earth work with slush with all lead and lift including back filling and disposal of surplus excavated earth including labours, T&P, taxes etc. for proper completion of the work. |
| 2 | Supplying and laying Sand on top & bottom of Pipe including cost of all material, labour, lead and lift, T&P, taxes etc. for proper completion of the work. |
| 3 | M-15 (1:2:4) cement concrete with OPC-43 grade cement, Kanhar river sand FM³ 2.5, coarse aggregate of dalla grit, 4.75-20mm. including cost of all material, labour, T&P, lead & lift, mechanical mixing & placing including cost of all labour, material, T&P, roylity and all taxes etc. for proper completion of work. |
| 4 | Reinforced cement concrete in M-25 with OPC-43 grade cement, Kanhar river sand FM³ 2.5, coarse aggregate of dalla grit, 4.75-20mm. including cost of all material, labour, T&P, lead & lift, mechanical mixing & placing including cost of all labour, material, T&P, roylity and all taxes etc. for proper completion of work. |
| 5 | Centering and shuttering for CC/RCC work including cost of labour, material, T&P, staging etc. required for proper completion of work. |
| 6 | Cutting, bending, placing and binding of steel reinforcement on Collar Joint of pipe including cost of all labour, material, T&P, M.S. binding wire for proper completion of work. |
| 7 | Providing & Fixing 1200mm. Ø HUME PIPE including cost of all material, labour, T&P etc. required for proper completion of work. |
| 8 | Random rubble stone masonery in 1:4 cement (OPC 43 grade) and sand mortar including cost of all material, labour and T&P etc required for proper completion of work. |
| 9 | Struck deep Pointing work for exposed surface of stone masonry in 1:2CM with cement OPC-43 grade, sand etc. including cost of all material, labour and T&P etc required for proper completion of work. |
| 10 | Laying of coarse sand in filters including cost of all material, cost of all materials labours carriage T&P lead required for proper completion of work. |
| 11 | Supplying and laying hard stone dalla grit 4.75mm. To 20mm. size in filters and in gaps of C.C. block including cost of all material, labours, T&P lead etc. required for proper completion of work. |
| 12 | Supplying and laying hard stone ballast 20mm to 40mm size in filters including cost of all material, labours, T&P lead etc. required for proper completion of work. |
| 13 | Dewatering of Foundation by hiring diesel pump 5 HP/Electric motor of same capacity including operator cost, cost of dewatering equipment and its accessories, labour etc. |
| 14 | Supply and fixing P.V.C. pipe 100 mm for making weep holes in wing wall including cost of all materials, labour and T&P required for proper completion of work. |
| 15 | Stone pitching in launching appron and back side of wing wall including all materials labour and T&P required for proper completion of work. |
| 16 | Earth work in making drain diversion work to facilitate proposed work on site properly including all labours, T&P, taxes etc. for proper completion of the work. |
| 17 | Earth work in back filling in foundation with manual compaction including all labours, T&P, taxes etc. for proper completion of the work. |
| 18 | Earth work in making Road diversion work to facilitate proposed work on site properly including all labours, T&P, taxes etc. for proper completion of the work. |
| 19 | Earth work in excavation in all type of soil for channelization of drain/Nala including all lead & lifts proper compaction and disposal including dewatering if required as per direction of Engineer-in-charge. |
| 20 | Earth work In removal and disposal of road diversion including all labours, T&P, etc. for proper completion of the work..As directed by Engineer -in-charge Please Enable Macros to View BoQ information |