| 1 | 4.12.1 :- Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-incharge. 1. All kinds of soil [Through Rate] |
| 2 | 11.5.3 :- 12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate]including pointing in white cement mixed with pigment of matching shade complete. [Through Rate] |
| 3 | 10.100.2 :- Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] |
| 4 | 7.21.1:- Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] |
| 5 | 6.2.1:- Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor four level, excluding the cost of centering, shuttering and finishing: 1. 1:1½:3 (1 cement : 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate] |
| 6 | [6.30.3] Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform [ThroughRate] |
| 7 | 21.110.27 :- Supplying, erection, testing and commissioning of submersible motor pumping set non clog for sewerage having head 30.00 m as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked including all accessories (like SS Pipes, SS Chain (Shackle Chain) ,SS Foundation Bolt, complete base frame, Monorail, Chain Guide Line, Auto Compiling, Duct Foot Bend (D/F Bend) etc. complete in all respect 27. Discharge Capacity (LPM) - 1800 Power Capacity (BHP) - 20 [Through Rate] |
| 8 | 14.51.3 :-Hire charges for Hydraulic excavator/Loader like JCB/Pock lain, Hitachi etc with all accessories having bucket capacity 3. Hire Charges for excavator with over0.75 cum bucket capacity [Through rate] |
| 9 | [1.LB021] LB021. Sewer man [Rate] |
| 10 | [1.PM019] PM019. Hire and running charges of Generator 250 KVA [Rate] |
| 11 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo- Mechanically Treated bars of grade Fe-500D or more [Through Rate] Please Enable Macros to View BoQ information |