|
| 1 | Replacement, providing & fixing of mechanical seal of M&P make 250 KW horizontal split casing pump set having 1033 meter cube discharge at head of 62 meter complete with stationery face, rotary face and sleeve, eomplete in all respect at pump set 2No. Pump house Phase V&VI at WW-39. |
| 2 | Servicing/repairing of DG Set 20KVA (Kirloskar make) installed at pump house phase-III & IV at Water Works Sector39, Chandigarh with following parts/items: Lubricant oil filter, Lubricant oil, Diesel filter set, Coolant, Self stater repair and Labour Charges etc. |
| 3 | Replacement of following size bearings of 250KW pump set, bed no. 1 & 2 (Phase V & VI) and 200HP pump set, bed no.1 (Phase I & II) including cost of dismenteling and refixing, greassing etc. complete in all respect. Make SKF/FAG/TATA |
| 4 | Ball bearing 6314-C3 |
| 5 | Ball bearing 6312-C3 |
| 6 | Repair of Soft Starter in the main Electric Panel for 250 KW, 3 Phase, 415 volts electric motor by replacement of defective 3 pole contactor block AF-580-30-11, along with cleaning of bus bar link, replacement of control wiring wherever required, including labour charges for replacement of contactor block of bed no.2 at Pump House Phase-V&VI Water Works Sector-39, Chandigarh. Маkе: АBB/Siemens/Danfoss. |
| 7 | Relacement, providing and fixing of coupling pins along with rubber bush complete for 200&215 HP Pump set (Pump house I & II) complete in all respect. |
| 8 | Repair of foundation of 200 & 215HP pump set (Pump house phase I & II) by means of dismantling/chipping concrete from surface of foundation, laying of epoxy mixed cement concrete using jeera bajri on foundation for proper leveling of base frame including cost of required shuttering wherever required complete in all respect to entire satisfaction of EIC. |
| 9 | Replacement of MS base frame made out of MS channel as per size and design of existing base frame inducing cost of cutting, jointing welding, drilling holes, priming, painting, transportation, dismantling of complete pump and motor from bed, dismentling of tapper by cutting with gas tourch and refixing after replacement of base frame and rejointing of tapper with arc welding etc. at bed No.1&2, 215/200 HP (Phase I&II) for supplying raw water to WW Sec.12, Chd complete in all respects. |
| 10 | Replacement/ Providing and fixing of foundation bolt 20mm dia 300mm long by mean of drilling in concrete foundation, fixing of bolts with special compound including dismantling existing foundation bolts, making proper level of base frame along with allingment of pump set at bed No.1&2, 215/200 HP, (Phase I&II) for supplying raw water to WW Sec.12, Chd. complete in all respects. |
| 11 | Reparing of speed reduction gear box having helical gear arrangement coupled with 138HP Diesel engine for supplying clear water to Water Works Sector-32 by replacement of broken driving shaft, broken driver gear, worn out driver gear, intermittent helical gear, along with replacement of bearings, lubricant, gaskets, rubber spider for engine side coupling, oil seals, bearing end plates including cost of other lathe work and testing on load etc. complete in all respect. |
| 12 | Replacement of complete coupling set along with coupling pins, rubber bushes, lock nuts including cost of lathe work for making inside bore, making key way and dismentling of existing coupling and fixing of new coupling complete in all respect. Make:Lovejoy/Fenner |
| 13 | Dismantling/ cutting of old rusted Z-bend, taking out from trench and stacking near site with the help of mechanical equipments including cost of gas cutting & manpower at bed No. 9, HP 393 dieseal engine pump house Phase-III complete in all respect. |
| 14 | Fabricating, providing, fixing & testing of Z-bend made of mild steel circulator pipes of thickness 6mm & sizes 400mm along with providing and fixing of slip on flanges of 20mm thickness at both ends of Z-bend, including cost of welding, painting, nut, bolts & rubber gasket etc. at bed No. 9, HP 393 dieseal engine pump house Phase-III complete in all respect |
| 15 | Less against old material. Please Enable Macros to View BoQ information |