| 1 | Supplying and fixing of Precast RCC slabs(factory made,the factory should be ISO certified and registered under Dirctorate of Industries, Govt. of India) at site in concrete Grade of M-25 with 20 mm nominal size Granitic or basaltic aggregate, consolidated by means of mechanical platform, vibration etc. with lifting hooks of M.s. 10mm bars and PVC cups including cost of reincforcement, Certificate from manufacturer shall be produced indicating grade of concret and minimum content of steel in the product along with 5 year free replacement warranty in case of breakage complete and as directed by Engineer -in -charge. a) Size 900 x 400 x 150 mm with steel reinforcement not less than 7 kg per unit -30 T capacity. |
| 2 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. a)All kinds of soil |
| 3 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. |
| 4 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : a) All works upto plinth level |
| 5 | Centering & shuttering including Strutting, Propping & removal of forms for : a) Foundations, Footings, Bases for columns |
| 6 | Providing TMT steel reinforcement bars of (SAIL, TATA. VIZAG, JSW Steel Ltd.) ) (Confirming to IS 1786 of 1986) for RCC work (conforming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member. |
| 7 | Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) a) All works upto plinth level |
| 8 | Centering & shuttering including Strutting, Propping & removal of forms for : iii) Columns, Piers, Pillars, Aburments, Posts and struts (square rectangle polygon in plan) |
| 9 | Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) |
| 10 | b) In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and structs etc. upto floor five level |
| 11 | Providing & fixing ornamental gat of M.S. tube section 8 x 4cm Main frame & square bars 20mm x20mm as per detailed Architectural drawing no. (4) along with RCC columns in either side of the gate with ornamental plaster for the said RCC columns etc. complete including fixing etc. size of ornamental gate. |
| 12 | Ornamental plaster for column |
| 13 | Providing & fixing G.I. mesh for Generator room |
| 14 | Providing/fixing G.I./M/S sheet box for electric pump covering with M.S. fream etc. |
| 15 | Providing/Fixing 10 H.P. kirloskar water pump/ pand board seetim pipe 4'' inlate & outlate pipe/starter/carpenter and other electrical fitting plumbing/current pump to pipe line etc. Please Enable Macros to View BoQ information |