|
| 1 | Engaging & operation of one no. Pokeland machine having capacity 200/210 (L&T, Tata Hitachi etc.) with one operator including cost of fuel, lubricants and repair maintenance etc. for removal of slip/landslide/excavation in dry and wet condition, complete in all respect as per direction of I/C. Payment for engaging excavator cum loader shall be made only for actual working hours at site, no idle charges shall be paid. If machine is trapped in slip / earth, contractor shall make its own arrangement to haul the machine, for which no extra payment shall be made to contractor, and also machine shall be considered in idle condition. Cost of mobilization & demobilization from site shall be borne by contractor. |
| 2 | Providing and laying of Mechnically Woven Double Twisted Hexgonal shaped Gabions (Zinc Coated) of size 3mx1mx1m with two diaphrams at 1m interval having mesh opening 100mm x120mm, mesh wire diameter 3mm for gabians, edge/selvedge wire diameter 3.9mm and lacing wire diameter 2.2mm (excluding boulder) and directed by Engineer-in-charge, including supply of all material, labour, T&P etc required for proper completion of the work. |
| 3 | Providing and laying of Empty Cement Bags (Gunny Bags) filled with local sand and tightened using sutli and carriage upto site including preparing subgrade before placing in position, also including supply of all material, labour, T&P etc required for proper completion of the work. |
| 4 | Providing and laying of black polythene sheet of approved quality for stopping leakage through RBM filled empty cement bags used for making Bundha as required and directed by Engineer-in-charge, including supply of all material, labour, T&P etc required for proper completion of the work. |
| 5 | Engaging & operation of one no. wheel type excavator cum loader machine (preferably JCB/L&T/ BEML etc) having capacity 75 BHP with one operator and one helper or skid steer loader Bob cut (height not more than 2.0 m) having capacity 75 BHP with one operator and one helper including cost of fuel lubricants and repair maintenance etc. for removal of slip / landslide/ excavation in dry and wet condition, complete in all respect as per direction of I/C. Payment for engaging excavator cum loader shall be made only for actual working hours at site, no idle charges shall be paid. If machine is trapped in slip / earth, contractor shall make its own arrangement to haul the machine, for which no extra payment shall be made to contractor, and also machine shall be considered in idle condition. Cost of mobilization & demobilization from site shall be borne by contractor. |
| 6 | Engaging & operation of one tractor along with one driver and one helper & trolley having hydraulic jack arrangement. Including cost of fuel lubricants and repair maintenance etc. for removal of slip / landslide/ excavation in dry and wet condition, complete in all respect as per direction of I/C. Capacity of tractor must be not less than 45 BHP, and loading capacity of trolley must not be less than 2.25 cum. Payment for engaging Tractor with trolley shall be made only for actual working hours at site, no idle charges shall be paid. If tractor is trapped in slip / earth, contractor shall make its own arrangement to haul it, for which no extra payment shall be made to contractor, and also tractor shall be considered in idle condition. Cost of mobilization & demobilization from site shall be borne by contractor. |
| 7 | Removal of sand/RBM filled EC bags used for making bundha after completion of the work and its proper disposal including all labour material T&P etc as per direction of E/I required for proper completion of work. |
| 8 | Engaging & operation of one no. wheel type Tipper capacity of 05.50 cum/10tonne with one operator and one helper including cost of fuel lubricants and repair maintenance etc. for loading & unloding of excavated maaterial dry and wet condition, complete in all respect as per direction of E/C. Payment for engaging wheel type Tipper 05.50 cum with one operator and one helper shall be made only for actual working hours at site, no idle charges shall be paid. If machine is trapped in slip / earth, contractor shall make its own arrangement to haul the machine, for which no extra payment shall be made to contractor, and also machine shall be considered in idle condition. Cost of mobilization & demobilization from site shall be borne by contractor. Please Enable Macros to View BoQ information |