|
| 1 | Electrical Items : |
| 2 | Cable Holding clamp with N&B |
| 3 | PP & CLAMP WITH N&B ST POLE SP-55 |
| 4 | 33 KV END CLAMP FOR ACSR PANTHER |
| 5 | GI Pipe 4'\\" Dia |
| 6 | 11 KV H.S Cable J/K 3x240 sq mm(I/D) |
| 7 | 11KV H.S Cable J/K 3x240 sq mm(O/D) |
| 8 | 11kv 3P(400A)3pin vert. mount GO AB TPMO |
| 9 | 12 Volt Battery DC |
| 10 | 24V BATTERY CHARGER |
| 11 | Labour (Service) |
| 12 | INSURANCE OF ASSETS -PROPERTY |
| 13 | REINFORCEMENT FOR RCC WORK |
| 14 | MS WORK FOR LEDDER, RAILING & OTHER |
| 15 | SPECIAL EARTHING |
| 16 | FABRICATION OF STEEL |
| 17 | EXCAVATION OF PIT FOR POLE |
| 18 | ERECTION OF SP-55 DOUBLE POLE |
| 19 | GROUTING OF POLE |
| 20 | DISMANTLING OF PANELS |
| 21 | LAYING OF U/G 11 KV CABLE IN TRENCH |
| 22 | EXCAVATION OF EARTH FOR DTR PLINTH |
| 23 | CEMENT CONCRETING WORK DTR PLINTH |
| 24 | BRICK WORK IN 1:4 RATIO DTR PLINTH |
| 25 | CEMENT PLASTER ON DTR PLINTH |
| 26 | FIXING OF TPMO |
| 27 | FIXING OF FUSE SET |
| 28 | FIXING OF LIGHTNING ARRESTOR |
| 29 | FIXING OF 11 KV XLPE JOINTING KIT |
| 30 | CARTAGE SP-55 POLE, 151-200KM |
| 31 | CARTAGE OF PETTY MATERIAL,151-200KM |
| 32 | CARTAGE 11 KV PANELS, 151-200 KM |
| 33 | CARTAGE 1.5/3 MVA POWER T/ F(151-200KM) |
| 34 | CARTAGE 10/12.5 MVA POWER T/ F(151-200KM) |
| 35 | HEADLOAD CARTAGE SP-55 POLE(0-1 KM) |
| 36 | HEADLOAD CARTAGE OF MATERIAL(0-1 KM) |
| 37 | DISMANTLING OF CABLE/NEUTRAL STAND |
| 38 | DISMANTLING OF FENCING AND GATE |
| 39 | DISMANTLING OF POWER T/F 3/1.5 MVA |
| 40 | SHIFTING OF 5/3 MVA |
| 41 | SHIFTING OF 12.5 MVA |
| 42 | LOADING T/F(12.5/10 MVA) IN VEHICLE |
| 43 | LOADING T/F(3/1.5 MVA) IN VEHICLE |
| 44 | UNLOADING T/F(12.5/10 MVA) IN VEHICLE |
| 45 | UNLOADING T/F(3/1.5 MVA) IN VEHICLE |
| 46 | ERECTION OF POWER T/F(12.5/10 MVA) |
| 47 | ERECTION OF CABLE/NEUTRAL STAND |
| 48 | RE-ERECTION OF FENCING/GATE |
| 49 | ERECT.11 KV VCB(O/G-B/C-I/C)PANEL |
| 50 | TESTING AND COMMISSNING OF POWER T/F |
| 51 | TESTING 11 KV VCB |
| 52 | LAYING OF CONTROL CABLE |
| 53 | HEADLOAD CARTAGE OF 11 KV VCB I/C |
| 54 | HEADLOAD CARTAGE OF 11 KV VCB O/ G Please Enable Macros to View BoQ information |