|
| 1 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 2023 5.1.2 |
| 2 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth .Thermo-Mechanically Treated bars of grade Fe-500D or more DSR 5.22A.6 |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete dsr 2023/ 5.9.1 |
| 4 | Earth work by mechinical / manual means in rough excavation, banking excavated earth in layers not exceeding 20cm in d epth, breaking clods, watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and for all lift All kinds of soil DSR NO.2.8.1/2023 |
| 5 | earth work in cutting or filling in ordinary soil loam clay or sand including 1.5 mtr lift &lead upto 8 km including part of earth cartage royality all complete as per direction pg enginner incharge. DSR 2023/2.6+CARTAGE +LAND COST |
| 6 | Construction of Granular Sub-Base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, compacted of work. as direted by Engineering in incharge. stone ballast granullar 53mm to 26.50mm @27.56%,26.5 to 9.5 mm @22.5%,9.5 to 4.75 mm @10%,4.75 mm below @mm below @40% all complete. |
| 7 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50 mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge.60 mm thick C.C. paver block of M-35 grade with approved colour design and pattern. DSR 16.91.1/2023(rate-1045.65) |
| 8 | demolishing brick work manually/by mechanical means including stacking of seviceable material and disposal of unserviceable material within 50 mtrs lead as perdirection of engineer-in-charge in cement mortar DSR2023/15.7.4(RATE-2060.20) |
| 9 | 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources DSR 4.2.3/2023 |
| 10 | Providing and laying at or near ground level factory made kerh stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete etc as per direction of Engineer-in-charge (length of finished kert edging shall be measured to calculate volume for payment) (Precast C.C. kerb stone shall be approved by Engineer-in-charg including first coat primer and two coat enemel paint on new plaster surface. |
| 11 | Brick work with class 150 bricks of designation 15 in foundation and plinth in: cement mortar 1:4(1 cement :4 coarse sand )(as per DAR) OR DSR S.I NO. 6.1.1/2023 (Rate 7846.30) |
| 12 | Providing and laying of cement concrete OF 1:4:8 (1 Cement : 4 coarse sand :8 graded Brick ballst aggregate 40 mm nominal size) in foundation under floors including supply of all meterials, labour & T&P etc. required for proper completion of the work item no. 275 SOR/2022 |
| 13 | 12 mm cement plaster of mix :1:4 (1 cement: 4 coarse sand) DSR 2023/13.4.1 (RATE-357.35) |
| 14 | SUPPLY OF OLD BRICK TO THE CONTRACTOR (PWD SOR 2025 materials) |
| 15 | SUPPLY OF OLD BRiCKS BAT TO THE CONTRACTORE (PWD SOR 2025 materials) |
| 16 | SUPPLY AND FIXING OF 160MM DIA HDPE PIPE 100/PN-6(JAL NIGAM2022).(PSR-2838/MDA/EE/2024) |
| 17 | painting two coat over priming coat (but including cost of priming coat) on new wood work and on plastered surface or steel and other metal surface with superior synthetic enemel paint of standared make brushing to give an even shade and finished and including cleaning the surface all dirt dust and ather foreign matter sand paparing and stripping including cost matter and scoured with wire brushes fine steel / wood scrappers sand papering and knotting including coat of all and supply of all materials ,labour and T&P etc.required for proper completion of the work. (SOR 2022 1B+2+4(iii) |
| 18 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width aswell as 10 sqm on plan) including getting out and disposal of excavatedearth lead upto 50 m and for all lift, as directed by Engineer-in-charge.All kinds of soil +25% ADD FOR FOUL SOIL .DSR 2.6.1 /2023(rate-177.50) Please Enable Macros to View BoQ information |