Name of Work:- Restoration of Retaining wall along sewa river damaged during floodnear work shop CPS-1
Sl. No.
Item Description
1
Earth work in surface excavation not exceeding 30 cm in (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer in charge. Ordinary rock.
2
Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
3
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand) : 4 graded stone aggregate 40 mm nominal size).
4
Providing and fixing U-PVC pipes (working pressure 4 kg / cm²) Single socketed pipe 110 mm dia.
5
Providing and fillingof Stone boulder behind wall.
6
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
7
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centring, shuttering, finishing and reinforcement - All work up to plinth level ::1:1½:3 (1 cement : 1½ coarse sand) : 3 graded stone aggregate 20 mm nominal size). Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.