| 1 | Extra for earth work in hard soil as per specification and direction of E/I. (vide classfication of soil item - B) |
| 2 | Providing coarse clean sand in filling in foundation trenches or in plinth including thick with all leads and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I. (Mode of measurement compacted voume) |
| 3 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes, royalty all complete as per building specification and direction of E/I. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)In Foundation |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size) |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level.1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete |
| 8 | Providiag designation 75B brick work in Cement Mortar (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing taxes and royalty all complete job as per building specificition and direction of E/l. |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts |
| 12 | Supplying, fitting and fixing M.S. grill gate with M.S. grill made of 20X6mm M.S. flats or 16mm M.S. square bars fitted on 25X25X6mm M.S. Angle frame of size 60X60X6mm. Including cost of fabrication, providing necessary locking arrangement with haskal and domny duly fixed in P.C.C. (1:2:4) blocks of required size applying a priming red lead paint over steel work, taxes all complete as per drawing specification and direction of E/I. |
| 13 | Providing 12mm thick cement plaster (1:6) -with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty as per building direction of E/I. |
| 14 | Providing Tor steel reinforcement of 10mm dia to 16 mm bars as per approved design and drawing exclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. |
| 15 | Providing two coat of painting with ready mixed paint of approved shade and make over steel surface including cleaning the surface throughly, scaffolding and taxes all after removing dirt including scales smokes, grease and sand papering including cost of scaffolding and taxes all complete as per building specification and direction of E/I. |
| 16 | Providing two coats of snowcem over new surface -do- -do- all complete job as per specification and direction of E/I. |
| 17 | Providing angle as per I.S. 22665 x 65 x 6 / 8 / 10 mm (Gr. A) |
| 18 | Providing barbed wire for fencing - 4 Point, 2 Ply, 12 SWG, 150mm Apart. |
| 19 | Labour for fitting and fixing barbed wire fencing in four rows horizontal up to a height of 1.85 M and two diagonals including fixing of post in cement concrete at 2.5 M centers including cost of staples (but excluding the cost of cement concrete angle iron post its cutting and making holes, nuts and bolts) all complete as per building specification and direction of E/I. |
| 20 | CEMENT |
| 21 | BRICK |
| 22 | STEEL |
| 23 | STONE CHIPS |
| 24 | Goods & Services Tax (G.S.T.) - 18% |
| 25 | Labour Cess - 1% Please Enable Macros to View BoQ information |