| 1 | Pavers Block UPC , Labour required for site clearence do-do-E/I |
| 2 | Earth work excavation in foundation Trenches in ordinary soil (vide classification of soil item -A) and disposal of excavated earth as obtained . all complete as per approved design, building specification and direction of E/I ( 5.1.1+ 5.1.2) |
| 3 | Providing Coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts . all complete as per building specification and direction of E/I (Mode of measurement compacted volume) (5.1.10) |
| 4 | Provinding and laying 60 mm thick factory made cement concrete interlocking paver block of m-30 grade by blocking compaction and pattern over and including 50 mm thick compaction of approved size and design and shape laid in required colour and pattern and bed of coarse sand filling the joints with fine sand do-do-E/I {Rate=951.00/1.13=841.59} (16.68 DSR21) |
| 5 | Providing Plain cement concrete in open foundation complete as per drawing and technical specifications p.c.c m-15(1:2:4)do-do-E/I (5.3.1.2 BCD) |
| 6 | Add carriage of material, sand(AVG LEAD 20 km(p) (BCD) |
| 7 | s/chips( AVG LEAD 15 km(P)) |
| 8 | paver block/bricks(AVG LEAD 20 km(P)) |
| 9 | Cement (Lead 10 Km.(P)) |
| 10 | Pavers Block Pandra, Labour required for site clearence do-do-E/I |
| 11 | Earth work excavation in foundation Trenches in ordinary soil (vide classification of soil item -A) and disposal of excavated earth as obtained . all complete as per approved design, building specification and direction of E/I (5.1.1+5.1.2) |
| 12 | Providing Coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts . all complete as per building specification and direction of E/I (Mode of measurement compacted volume) (5.1.10) |
| 13 | Provinding and laying 60 mm thick factory made cement concrete interlocking paver block of m-30 grade by blocking compaction and pattern over and including 50 mm thick compaction of approved size and design and shape laid in required colour and pattern and bed of coarse sand filling the joints with fine sand do-do-E/I {Rate=951.00/1.13=841.59} (16.68 DSR21) |
| 14 | Providing Plain cement concrete in open foundation complete as per drawing and technical specifications p.c.c m-15(1:2:4)do-do-E/I (5.3.1.2 BCD) |
| 15 | Add carriage of material ,sand(AVG LEAD 20 km(p) (BCD) |
| 16 | s/chips( AVG LEAD 15 km(P)) |
| 17 | paver block/bricks(AVG LEAD 20 km(P)) |
| 18 | Cement (Lead 10 Km.(P)) |
| 19 | Sahdah Grih, Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per buy lading specification and direction of E/I (Mode of measurement compacted volume). (5.1.10) |
| 20 | Providing designation 75B one Brick flat soling as per building specification and direction of E/I (5.6.3) |
| 21 | Providing P.C.C M-150 in nominal mix of (1:2:4) in foundation with approved quality of stone chips 20mm to 6 mm size graded and clean coarse sand of F.M. 2.5 to 3 EXcluding screening shuttering mixing cement concrete in mixer and placing in position, vibrating, striking, curing taxes and royalty all complete as per building specification and direction of E/I (5.3.1.2) |
| 22 | providing designation 75 B brick work in c.m (1:6)in foundation and plinth as per building specification and direction of E/I (5.2.6) |
| 23 | Providing and laying in position cement concrete of sepecified grade excluding the cost of centring and shuttering all wolrk upto plinth level (1:1.5:3) (1 Cement : 1.5 Coarse sand (Zone III) : 3 graded stone aggregates 20 mm nominal size) all complete as per building specification and direction of E/I. (5.3.1.1) (5.3.1.1) |
| 24 | providing 12mm thick cement plaster (1:4)__ do___ do__ E/I (5.7.2+ 5.7.11) |
| 25 | Providing R.C.C M-200 in nominal mix of (1:1.5:3) in foundation with approved quality of stone chips 20mm to 6 mm size graded and clean coarse sand of F.M. 2.5 to 3 including screening shuttering mixing cement concrete in mixer and placing in position, vibrating, striking, curing taxes and royalty all complete as per building specification and direction of E/I (5.3.2.1) |
| 26 | Centering and Shutering including strutting propping etc.and remove all, Foundation, Footing bases of Column etc for mass concrete (5.3.17) |
| 27 | Centering and Shutering including strutting propping etc.and remove all, Column, pillers, piers and abutment etc () |
| 28 | Centering and Shutering including strutting propping etc.and remove all, Lintels, Beams, Plinth Beam and Girders etc () |
| 29 | Centering and Shutering including strutting propping etc.and remove all, Column, pillers, piers and abutment etc |
| 30 | Centering and Shutering including strutting propping etc.and remove all, Lintels, Beams, Plinth Beam and Girders etc |
| 31 | Centering and Shutering including strutting propping etc.and remove all, Suspended floors roofs landing balconies and access platform |
| 32 | Providing tor steel reinforcement of 10mm, 12mm & 16mm dia bars as per approved deign and drawing as per building specification and direction of E/I (a) 10mm (TMT coil Fe 500) (only valid for TATA(Tucson), SAIL, JSPL, Elcetrosteel Ltd. Bokaro and Vizag(RINL) (b) 12mm (TMT coil Fe 500) (only valid for TATA(Tiscon), SAIL, JSPL, Elcetrosteel Ltd. Bokaro and Vizag(RINL) (c) 16mm (TMT coil Fe 500) (only valid for TATA(Tiscon), SAIL, JSPL, Elcetrosteel Ltd. Bokaro and Vizag(RINL) |
| 33 | Providing 6mm. Thick cement plaster (1:4) in celling with clean coarse sand of F.M. 1.5 as per building specification and direction of E/I |
| 34 | Providing two coat snowcem of approved shade and make over a coat of cement primer on new surface including preparing the plastered surface smooth with sand paper. Scaffolding, curing and taxes all complete as pr building specification and direction of E/I |
| 35 | Supplying and laying rip-rap with good quality of boulders duly packed including the cost of materials, royalty, taxes etc. but excluding the cost of carriage all complete as per building specification and direction of E/I. (5.6.8, Part - A) |
| 36 | Supplying 6.9 mm thickness Iron Joint 250 x 125 im mm (M-195 © (i), P - 43) |
| 37 | Labour for hosting, placing and fixing in position R.S. joist or tee including cutting to required shape and size straigthening all complete as per building specification and direction of E/I. (But excluding the cost of joist or tee) (5.5.26) |
| 38 | ADD carriage of materials, Sand (Lead 15 Km.(P)) |
| 39 | Brick (Lead 8 Km.(P)) |
| 40 | Cement + rod (Lead 04 Km.(P)) |
| 41 | Stone Chips (Lead 15 Km.(P)) |
| 42 | Boulder (Lead 10km) |
| 43 | Pavers Block Bhamal, Labour required for site clearence do-do-E/I |
| 44 | Earth work excavation in foundation Trenches in ordinary soil (vide classification of soil item -A) and disposal of excavated earth as obtained . all complete as per approved design, building specification and direction of E/I ( 5.1.1+ 5.1.2) |
| 45 | Providing Coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts . all complete as per building specification and direction of E/I (Mode of measurement compacted volume) (5.1.10) |
| 46 | Provinding and laying 60 mm thick factory made cement concrete interlocking paver block of m-30 grade by blocking compaction and pattern over and including 50 mm thick compaction of approved size and design and shape laid in required colour and pattern and bed of coarse sand filling the joints with fine sand do-do-E/I {Rate=951.00/1.13=841.59} (16.68 DSR21) |
| 47 | Providing Plain cement concrete in open foundation complete as per drawing and technical specifications p.c.c m-15(1:2:4)do-do-E/I (5.3.1.2 BCD) |
| 48 | Add carriage of material, sand(AVG LEAD 15 km(p) (BCD) |
| 49 | s/chips( AVG LEAD 15 km(P)) |
| 50 | paver block/bricks(AVG LEAD 20 km(P)) |
| 51 | Cement (Lead 15 Km.(P)) |
| 52 | Add cost for Signboard and Photography |
| 53 | Goods & Service Tax (G.S.T. 18%) |
| 54 | 1% Labour Cess Please Enable Macros to View BoQ information |