|
| 1 | API 6D 6 IN 300 Series W by W, A by G Ball Valve, Gas over oil actuator as per technical Specifications and specific requirements for the project | API 6D 6 IN 300 Series W/W, A/G Ball Valve, Gas over oil actuator, fully welded construction, butt weld end connection along with spares as per technical Specifications and specific requirements for the project |
| 2 | API 6D 4 IN 300 Series W by W, A by G Ball Valve, Gas over oil actuator, as per technical Specifications and specific requirements for the project | API 6D 4 IN 300 Series W/W, A/G Ball Valve, Gas over oil actuator, fully welded construction, butt weld end connection along with spares as per technical Specifications and specific requirements for the project |
| 3 | API 6D 4 IN 600 Series F by F, A by G Ball Valve, Gas over oil actuator as per technical Specifications and specific requirements for the project | API 6D 4 IN 600 Series F/F, A/G Ball Valve, Gas over oil actuator, bolted split body, flanged end connection along with spares as per technical Specifications and specific requirements for the project |
| 4 | API 6D 4 IN 300 Series F by F, A by G Ball Valve, Gas over oil actuator as per technical Specifications and specific requirements for the project | API 6D 4 IN 300 Series F/F, A/G Ball Valve, Gas over oil actuator, bolted split body, flanged end connection along with spares as per technical Specifications and specific requirements for the project |
| 5 | API 6D 6 IN 300 Series W by W, A by G Ball Valve, Gear or Lever operated HOV with limit switch along with spares as per technical Specifications and specific requirements for the project | API 6D 6 IN 300 Series W/W, A/G Ball Valve, Gear /Lever operated (HOV), fully welded construction, butt weld end connection, with limit switch along with spares as per technical Specifications and specific requirements for the project |
| 6 | API 6D 6 IN 300 Series W by W, U by G Ball Valve, Gear or Lever operated HOV with limit switch along with spares as per technical Specifications and specific requirements for the project | API 6D 6 IN 300 Series W/W, U/G Ball Valve, Gear /Lever operated (HOV), fully welded construction, butt weld end connection, with limit switch along with spares as per technical Specifications and specific requirements for the project |
| 7 | API 6D 4 IN 300 Series W by W, U by G Ball Valve, Gear or Lever operated HOV with limit switch along with spares as per technical Specifications and specific requirements for the project | API 6D 4 IN 300 Series W/W, U/G Ball Valve, Gear /Lever operated (HOV), fully welded construction, butt weld end connection, with limit switch along with spares as per technical Specifications and specific requirements for the project |
| 8 | API 6D 4 IN 600 Series F by F, A by G Ball Valve, Gear or lever operated with limit switch along with spares as per technical Specifications and specific requirements for the project | API 6D 4 IN 600 Series F/F, A/G Ball Valve, Gear/lever operated , split-body construction, flanged end connection, with limit switch along with spares as per technical Specifications and specific requirements for the project |
| 9 | API 6D 6 IN 300 Series F by F, A by G Ball Valve, Gear or lever operated with limit switch along with spares as per technical Specifications and specific requirements for the project | API 6D 6 IN 300 Series F/F, A/G Ball Valve, Gear/lever operated, split-body construction, flanged end connection, with limit switch along with spares as per technical Specifications and specific requirements for the project |
| 10 | API 6D 4 IN 300 Series F by F, A by G Ball Valve, Gear or lever operated with limit switch along with spares as per technical Specifications and specific requirements for the project | API 6D 4 IN 300 Series F/F, A/G Ball Valve, Gear/lever operated, split-body construction, flanged end connection, with limit switch along with spares as per technical Specifications and specific requirements for the project |
| 11 | Charges for mobilization and demobilization as per technical Specifications and specific requirements for the project | Charges for mobilization & de-mobilization as per technical Specifications and specific requirements for the project |
| 12 | Assistance in Actuator Commissioning as per technical Specifications and specific requirements for the project | Assistance in Actuator Commissioning as per technical Specifications and specific requirements for the project |