| 1 | Material Required | Material Required |
| 2 | Galvanized steel poles of tubular in design and swaged of the length 7 meters, with top cap welded and lightning spike and including MUFF @ 20 per Km | Galvanized steel poles of tubular in design and swaged of the length 7 meters, with top cap welded and lightning spike and including MUFF @ 20 per Km |
| 3 | Galvanized steel poles of tubular in design and swaged of the length 8 meters, with top cap welded and lightning spike and including MUFF @ 5 per Km | Galvanized steel poles of tubular in design and swaged of the length 8 meters, with top cap welded and lightning spike and including MUFF @ 5 per Km |
| 4 | Formed OFC Dead End andTermination Fittings including allsupporting items (@ 7/Km) | Formed OFC Dead End andTermination Fittings including allsupporting items (@ 7/Km) |
| 5 | OFC suspension fittings including all supporting items (@ 18/Km) | OFC suspension fittings including all supporting items (@ 18/Km) |
| 6 | Adjustable Cable Storage Bracket(@ 5/Km) | Adjustable Cable Storage Bracket(@ 5/Km) |
| 7 | Erection of 7m / 8m poles including excavation, fixing of MUFF, concreting, curing, Backfilling, Reinstatement, Compaction of earth, Stay arrangements etc. including obtaining Right-of-Way (RoW) permission and sign writing on poles with paint | Erection of 7m / 8m poles including excavation, fixing of MUFF, concreting, curing, Backfilling, Reinstatement, Compaction of earth, Stay arrangements etc. including obtaining Right-of-Way (RoW) permission and sign writing on poles with paint |
| 8 | Slinging / Laying and splicing of ADSS/ AOF including fixing of installation accessories and fixtures etc. Splicing & Jointing of Optical Fibre Cable, Link Testing & Acceptance Testing and makeover of route with As Built Diagram (ABD) of installed Cable routes. This also includes cost towards collection of ADSS Cable / AOF Cable and accessories from BSNL’s Store Depot | Slinging / Laying and splicing of ADSS/ AOF including fixing of installation accessories and fixtures etc. Splicing & Jointing of Optical Fibre Cable, Link Testing & Acceptance Testing and makeover of route with As Built Diagram (ABD) of installed Cable routes. This also includes cost towards collection of ADSS Cable / AOF Cable and accessories from BSNL’s Store Depot |
| 9 | Trenching, PLB Laying of underground OF cable inside PLB Pipe / DWC Pipe (at 135 cm depth), Concreting work on PLB Pipe / DWC Pipes including supply of cement, concrete and curing etc. as per engineering instruction (DWC and PLB will be supplied by BSNL)@10 Per km | Trenching, PLB Laying of underground OF cable inside PLB Pipe / DWC Pipe (at 135 cm depth), Concreting work on PLB Pipe / DWC Pipes including supply of cement, concrete and curing etc. as per engineering instruction (DWC and PLB will be supplied by BSNL)@10 Per km |
| 10 | Laying of PLB pipe | Laying of PLB pipe |
| 11 | Laying of 24F OFC | Laying of 24F OFC |
| 12 | Laying of DWC pipe | Laying of DWC pipe |
| 13 | Installation of FDF and WSC/OFTB, leading-in arrangement, jointing of pigtails and other related activity for construction of ADSS/Aerial OFC routes(FDF/WSC/OFTB will be supplied by BSNL)to be decided by site incharge based on site condition | Installation of FDF and WSC/OFTB, leading-in arrangement, jointing of pigtails and other related activity for construction of ADSS/Aerial OFC routes(FDF/WSC/OFTB will be supplied by BSNL)to be decided by site incharge based on site condition |