|
| 1 | Local Consultants Remuneration for Local Staff (inclusive of per diem allowance) |
| 2 | Support Staff (inclusive of per diem Allowance) |
| 3 | Transportation |
| 4 | Duty Travel to Site |
| 5 | Office Rent |
| 6 | Office Supplies, Utilities and Communication |
| 7 | Office Furniture and Equipment (Rental) |
| 8 | Report and Document Printing |
| 9 | Surveys & Investigation |
| 10 | Topographic Survey |
| 11 | Investigation |
| 12 | Network Survey and GPR |
| 13 | Cost of supply and fixing of boundary pillars |
| 14 | Land acquisition team including support staff and logistics |
| 15 | Professional Staff |
| 16 | Team Leader Cum Senior Highway Engineer |
| 17 | Senior Bridge Design Engineer |
| 18 | Highway Design Engineer |
| 19 | Traffic and Road Safety expert |
| 20 | Environmental Specialist |
| 21 | Material-cum-Geotechnical Engineer – Geologist |
| 22 | Senior Survey Engineer |
| 23 | Quantity Surveyor / Documentation Expert |
| 24 | Land Acquisition Expert |
| 25 | Utility Expert |
| 26 | Senior Geomatics Expert |
| 27 | Senior Hydrology and Hydraulics Expert |
| 28 | Sub-professional staff |
| 29 | Assistant Highway Engineer |
| 30 | Assistant Bridge Engineer |
| 31 | Assistant Quantity Surveyor |
| 32 | Assistant Survey Engineer |
| 33 | LA Team Member |
| 34 | Assistant Material and Quality Engineer |
| 35 | Support Staff |
| 36 | Office Manager |
| 37 | Typist |
| 38 | Office Boy |
| 39 | Nightwatch |
| 40 | Transportation (Fixed Cost) |
| 41 | The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of Consultants |
| 42 | Transportation (Fixed Cost) |
| 43 | trips of each KP to site 10x6 |
| 44 | Guest House Stay |
| 45 | Office Rent (Fixed Costs) |
| 46 | The rent cost includes maintenance, cleaning, repairs, etc. |
| 47 | Office Supplies, Utilities and Communication (Fixed Costs) |
| 48 | Office Supplies Drafting |
| 49 | Supplies Computer (12x2) |
| 50 | Running Costs |
| 51 | Domestic and International Communication |
| 52 | Office Furniture and Equipment (Rental) |
| 53 | Office Furniture and Equipment |
| 54 | Report and document Printing |
| 55 | (a) Monthly report (3 Per month)(b) Inception Report & QAP(c) Submission of Preliminary Alignment report including preliminary cost estimate for preferred alignment along with cost of land acquisition, traffic study and outcome.(d) Environment and Social Impact Screening Report(e) Draft Feasibility Report(f) Final Feasibility Report(g) Strip Plan with L.A. reports(h) Draft LA & Clearances 1 Report(i) Final LA & Clearances 1 Report(j) Draft Environmental Assessment Report and RAP(k) Final Environmental Assessment Report and RAP(l) Draft Detailed Design Report and Drawing etc.(m) Draft EMP(n) Draft Bidding Documents (o) Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. Final EMP.(p) Final Bidding Documents(q) Draft 3(a), 3(A) and 3(D) notification for land acquisition (3 copies each)(r) LA and Clearances II reports |
| 56 | Topographic Survey and sub-surface utilities detection Survey (Fixed Rate) |
| 57 | Detailed topographic surveys using Mobile/Aerial LIDAR or better TechnologyTopographic Survey including hire charges for equipment and supplies of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer |
| 58 | Investigation (Fixed Cost) |
| 59 | Road and bridge Inventory (through 3D NSV and MBIU) |
| 60 | FWD Test and Pavement Evaluation |
| 61 | Material Survey and Investigation |
| 62 | Sub-grade Investigation |
| 63 | Traffic Survey (including all sub-surveys such as axle load Surveys, O&D survey etc. as per TOR |
| 64 | Special Investigation for Hill Roads for slope stabilization |
| 65 | Land Acquisition Studies including GIS Mapping |
| 66 | Hydrological Models for Major Bridges |
| 67 | Geotechnical Investigation |
| 68 | Provisional Sum towards Environment Clearance/ Wildlife Clearance |
| 69 | GPR Survey for detection of underground utilitiesNote: To paid as per actual survey subject to condition that positive variation of upto 10% variation would be borne by the consultant |
| 70 | Cost of Supply & Fixing Boundary pillars |
| 71 | Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC 25:1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (on lumpsum basis) |
| 72 | Land acquisition team including support staff and logistics |
| 73 | Land acquisition support staff and logistics for land acquisition team as detailed below @Rs 2,50,000 per month for 5 months for each district. Please Enable Macros to View BoQ information |