|
| 1 | Supply, Installation and Maintainance for 60 Days) The contractor has to provide the man power also for maintance of the infrastructure installed. Note:- The quantity mentioned is tentative (only for rates) and can vary as per the site requirements. |
| 2 | Angle Iron/Channel Iron/Flat Iron for Various use like clamps, Braces etc |
| 3 | Shakle Insulators |
| 4 | Cable Suspension clamps |
| 5 | Weasel Conductor |
| 6 | GI Nuts and Bolts of Different sorts |
| 7 | GI Wire |
| 8 | LT AB Cable 50 mmsq |
| 9 | LT AB Cable 35 mmsq |
| 10 | Electronic Digital Display Board 5 ft Length and 1 Ft Breadth Reflecting (Power Development Department Welcome to Shri Amarnath Ji Yatris) |
| 11 | Flex Boards 6 Ft Length and 4 Ft Breadth with stands and Reflectors. Displaying (Power Development Department Welcome to Shri Amarnath Ji Yatris) |
| 12 | FRLS PVC insulated Copper Cable 1.5 mmsq |
| 13 | FRLS PVC insulated Copper Cable 2.5 mmsq |
| 14 | FRLS PVC insulated Copper Cable 4 mmsq |
| 15 | FRLS PVC insulated Copper Cable 6 mmsq |
| 16 | FRLS PVC insulated Copper Cable 10 mmsq |
| 17 | Aluminium Cable armoured 2 Core 16 mmsq |
| 18 | Aluminium Cable armoured 3.5 Core 16 mmsq |
| 19 | Switch Piano 5 Amps |
| 20 | Socket 3 Pin 6 Amps |
| 21 | Switch Piano 15 Amps |
| 22 | Socket 6 Pin 15 Amps |
| 23 | MCB SPN 40-63 Amps |
| 24 | MCB SPN 6-32 Amps |
| 25 | MCB DB 16 Amps |
| 26 | MCB DB 6 Amps |
| 27 | Switch Board Panel with 5 Amps Switch Socket 20 Nos with 3mm thick Bakelight sheet for Mobile Charging |
| 28 | PVC Conduit 25 mm, medium grade with necessary clamps and saddles. |
| 29 | PVC Conduit 20 mm, medium grade with necessary clamps and saddles. |
| 30 | Gang Box 10 Way |
| 31 | LED Holder |
| 32 | Square Box 4\\"x4\\" |
| 33 | LED Bulbs 30 Watts |
| 34 | LED Bulbs 9 Watts |
| 35 | LED Bulbs 5 Watts |
| 36 | LED Bulbs 40 Watts |
| 37 | LED Bulbs 50 Watts |
| 38 | Ceiling fans with 1200 mm sweep 80 watts |
| 39 | Wall hanging fans 600 mm sweep |
| 40 | Twin Core Service Cable 10mmsq |
| 41 | 100 Amps MCCB along with Box |
| 42 | Changeover Switch 2 Pole, 4 Pole 63 Amps |
| 43 | Extension Cord of 100 Amps with 5 sockets |
| 44 | Earthing of sheds and other infrastrucure installed with GI rod and Salt coal etc. |
| 45 | Replacement of already installed 120 Watts LED Flood Lights with Light Detecting Sensor to turn ON/OFF Luminarie automatically. Please Enable Macros to View BoQ information |