| 1 | Dismantling the brick or stone masonry in lime or cement mortar above 3.00M height including stacking the useful materials for reuse and removing the debris away from the work site etc. complete as per direction of the Engineer-in-charge. |
| 2 | Dismantling and removing cement concrete including stacking the useful materials for re-use and removing the debris away from the work site as per direction of the Engineer-in-charge. |
| 3 | Earth work in excavation of foundation and plinth including dressing & leveling the bed and depositing the excavated materials away from the work site with all leads, lifts & delifts etc. complete as per direction of the Engineer-in-charge. |
| 4 | Filling foundation and plinth with sand well watered and rammed including cost, carriage, royalty and all other taxes of materials etc. complete as per direction of the Engineer-in-charge. |
| 5 | Cement concrete (M-15) with 40mm size hard granite crusher broken Metal of approved quarry including hoisting,laying hire charges of concrete mixture, Generater with transportation of material & machineries to the site including dewatering & cost, carriage, royalty and all other taxes of materials with curing for a required days etc. complete as per direction of the Engineer-in-charge. |
| 6 | CC (M-20) with 20mm & down graded size hard granite crusher broken Chips of approved quarry including hoisting,laying hire charges of concrete mixture, Generater with transportation of material & machineries to the site including dewatering & cost, carriage, royalty and all other taxes of materials with curing for a required days etc. complete as per direction of the Engineer-in-charge. |
| 7 | RCC (M-25) with 20mm & down graded size hard granite crusher broken Chips of approved quarry including hoisting,laying hire charges of concrete mixture, Generater with transportation of material & machineries to the site including dewatering & cost, carriage, royalty and all other taxes of materials with curing for a required days etc. complete as per direction of the Engineer-in-charge. |
| 8 | Rigid smooth centering & shuttering for CC/RCC works (Cut off and Raft) including false work and dismantling them after casting including cost, carriage and all other taxes of materials to the site of work etc. complete as per direction of the Engineer-in-charge. |
| 9 | Wassls & Fins. |
| 10 | Base of Column, Foundation, Plinth Band, Footing, Mass concrete etc. |
| 11 | Supplying, fitting & placing in position uncoated HYSD bar for M.S. reinforcement for RCC work including straightening, cutting, bending, binding and tying the rails and placing in position including cost, carriage & all other taxes of M.S. steel & binding wire 18 to 20 gauge etc. complete as per direction of the Engineer-in-charge. |
| 12 | Providing weep holes in reinforced cement concrete abutment with 100mm dia A.C. pipe extending through the full width of structure including cost, carriage and all other taxes of materials etc. complete as per direction of the Engineer-in-charge. |
| 13 | Filling foundation & plinth with the excavated materials including watering & ramming with all leads, lifts and delifts etc. complete as per direction of the Engineer-in-charge. |
| 14 | Supplying of Bitumenous expansion joint board (ISI) 16mm thick and inserting premoulded bitumen expansion joints including cleaning with cost of all labour cess T&P etc. all complete asper directyion of Engineer-in-Charge. |
| 15 | Supplying laying & fixing in position NP-3 RCC Hume Pipe with colar joint in Cement mortar (1:3) including cost,carriage and all other taxes of materials etc.complete asper direction of Engineer in Charge. |
| 16 | Earth work in all kinds of soil excluding sand or sandy soil with mechanical carriage 5 k.m lead including rough dressing and benching old embankment and breaking clods 5cm to7 cm laying in layers not exceeding 0.30m depth. As per direction of Engineer-in -charges.( Royality shall be deduct from earth filling section )(Measurement to be taken on the finished compacted section & Earth shall be arranged by the contractor at his own cost & risk ). Please Enable Macros to View BoQ information |