| 1 | Quarrying,Collecting, supplying and stacking hard granite stone boulder of 15cm to 30cm size from approved quarry at work site with conveying from stacks & rough stone dry packing in aprons and revetments of the slope of the embankment including filling interstices with small stones wedging and hammering with cost, conveyance, royalty T & P, labour charges , cess and all other taxes of materials, all incidential charges, quality control test etc. complete as per direction of the Engineer-in-charge.(Measurement will be taken on finished level section.) |
| 2 | Earth work in excavation of foundation in all kinds of soil including dressing and levelling the bed and depositing the excavated materials clear of worksite with all leads, lifts, delifts and dewatering including removing bushes, stumps and any other foreign materials from the working area as well as from the foundation trenches with cost of all labour, hire and running charges of all machineries, labour welfare cess etc. complete in all respect as per specification and direction of the Engineer-in-Charge. |
| 3 | Quarrying,collecting,supplying and stacking of hard granite stone boulder of at least 30cm in length in any direction, 50kg. in weight and 0.028 cum in volume from approved quarry free from weather skin surface and other deleterious materials dumping the stones in rip raps, spur and slope protection works including filling the interstices with small stones wedging and packing surface to proper line leveles including fixing wave breakers etc.including cost,conveyance,royalty taxes of all materials of approved quality with uniform colour and texture from approved quarry with all leads,lifts delifts including dumping in water hire charges of boats, lunch etc. and all other incidental charges with quality control test etc.complete asper specification and direction of the Engineer in Charge (Measurement to be taken in level section & 1/6th voids will be deducted from the finished levelsection and payment will be made to the quantity so arrived between the stack measurement and level section after deduction of 1/6th voids, which ever is less). |
| 4 | Earth work in excavation of foundation and plinth including dressing & leveling the bed and depositing the excavated materials away from the work site with all leads, lifts & delifts etc. complete as per direction of the Engineer-in-charge. |
| 5 | Filling foundation and plinth with sand well watered and rammed including cost, carriage, royalty and all other taxes of materials etc. complete as per direction of the Engineer-in-charge. |
| 6 | Cement concrete (M-15) with 40mm size hard granite crusher broken Metal of approved quarry including hoisting,laying hire charges of concrete mixture, niddle vibrator, plate vibrator, Generater with transportation of material & machineries to the site including dewatering & cost, carriage, royalty and all other taxes of materials with curing for a required days etc. complete as per direction of the Engineer-in-charge. |
| 7 | CC (M-15) with 20mm & down graded size hard granite crusher broken Chips of approved quarry including hoisting,laying hire charges of concrete mixture, Generater with transportation of material & machineries to the site including dewatering & cost, carriage, royalty and all other taxes of materials with curing for a required days etc. complete as per direction of the Engineer-in-charge. |
| 8 | Rigid smooth centering & shuttering for CC/RCC works (Cut off and Raft) including false work and dismantling them after casting including cost, carriage and all other taxes of materials to the site of work etc. complete as per direction of the Engineer-in-charge. Please Enable Macros to View BoQ information |