| 1 | Earth work in excavation in all kinds of soil for road works with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and technical specification, including setting out, dressing of section to correct line, level, grade & camber for road work or dressing of sides and bottom for foundation of structures and loading into tippers, transporting to embankment site within all lifts and lead upto 1000mtr. and utilising the surplus earth locally for road work wherever required, backfilling the excavation earth to the extent required etc complete in all respect as per clause 301 & 304 of Specification for road & bridge work of MORT&H (5th Revision) & Direction of Engineer in charge. |
| 2 | Disposal extra soil deposited from road way cutting with tipper lead including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 3 | Filling Foundation & Plinth with excavated earth as per approved Drawing & Technical Specifications and as per Section - 2100 of MoSRT&H Specifications for Road & Bridge works (Latest Revision). |
| 4 | Providing, filling clean sand of approved quality in road work for construction of drainage layer and foundation trenches of structures in uniform layers, watered and rammed/ compacted as per approved drawing and technical specifications complete in all respect as per Section 900, 2100 and Clause 401 & 304 of MoRT&H specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 5 | Providing and laying Plain cement concrete of grade M-15 in foundation of CD works etc without formwork using 40mm to 10mm size crushed stone aggregates etc complete as per drawing and technical specification using High Strength approved quality Cement and coarse granite aggregate conforming to Table 1000-1 with formwork as per Section 900,1000,1500,1700, 2100, 2200 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. |
| 6 | Providing and laying R.C.C M-25 grade as per approved drawing and technical specifications complete in all respect as per section 900, 1000, 1500, 1700, 2200 & 2300 of MoRT&H specifications for Road & Bride works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 7 | Foundation (DRAIN) |
| 8 | Substructure (DRAIN) |
| 9 | SLAB (DRAIN) |
| 10 | Supplying, cutting, bending, binding, straightening, placing HYSD bars confirming to grade IS:1786-(Fe-500) for steel reinforcement works for finished item of work as per approved drawing and technical specifications complete in all respect as per section 900,1000 & 1600 of MoRT&H specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 11 | Providing and laying of filter media/metal spall backing using 45mm size crushed hard granite stone aggregates to the required thickness with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall and return wall of CD works to the full height compacted to a firm condition as per drawing and technical specifications complete in all respect satisfying the requirements laid down in Clause 2504.2.2 and Section 900 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. |
| 12 | Providing weep holes in abutment, wing wall, retaining wall, toe wall and RCC drain etc with 100mm dia A.C. pipe as per approved drawing and technical specifications complete in all respect as per Section 2200 & Clause 2706 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. Please Enable Macros to View BoQ information |