|
| 1 | Dismantling brick or stone masonry in lime or cement mortar under 3.0M height including stacking the usefull materials for reuse and removing the debris within 50 M lead. |
| 2 | Construction of Single under reamed pile foundation of 300mm dia and 4.00 mtr long with RCC M20 grade using 20mm and down grade black hard granite (Crusher broken) stone chips including cost of boring but excluding cost of M.S./Tor steel but including the cost of labour, conveyance, taxes, royalty, etc. all complete as per the direction of engineer-in-charge. |
| 3 | Earth work in Hard Soil or Gravelly Soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of Engineer-in-charge |
| 4 | Supplying, filling in foundation and plinth with sand including watering and ramming, poking & compacting including cost, conveyance, royalties, taxes of the materials and cost of all labour, labour cess, T&P etc. required for the work complete. |
| 5 | Providing and laying Plain Cement Concrete of proportion (1:3:6) in foundation and floors using 4 cm. size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality and from approved quarry including the cost of all materials, cost of labour, conveyance, taxes, royalties, loading, unloading, curing, labour cess, T&P, etc. all complete as per the direction of Engineer-in-charge. |
| 6 | RCC work of M-20 grade including cost of centering and shuttering using 20mm and down grade size black hard granite (Crusher Broken) chips of approved quality from approved quary including the cost of all materials, cost of all labour, conveyance, taxes, loading, unloading, T&P, royalty, labour cess, all complete as per the direction of Engineer-in-charge but excluding the cost of steel reinforcement.Pile cap |
| 7 | Grade beam |
| 8 | Column |
| 9 | RCC band |
| 10 | Cutting, Straightening, coiled or bent up MS Rod of TOR steel using SAIL/RINL /TATA /JINDAL /SHYAM Steel including bending, binding,welding and joining if necessary and tying the grills and placing in position as required for RCC work and hoisting, lowering laying icluding cost, conveyance, taxes of MS rod or TOR steel and binding wire of 18 to 20 gauge and labour required for the work for bending,binding and tying the grills etc. complete. |
| 11 | Providing Fly-Ash Brick masonry work in F&P using Fly-Ash Bricks of size 250mm x 120mm x80mm in cement mortar (1:6) including the cost of all materials, cost of labour, conveyance, taxes, loading, unloading, royalties, labour cess, scaffolding, curing for required period, T&P, etc. all complete as per the direction of the Engineer-in-charge. |
| 12 | Providing Fly-Ash Brick masonry work in Superstructure using Fly-Ash Bricks of size 250mm x 120mm x80mm in cement mortar (1:6) including the cost of all materials, cost of labour, conveyance, taxes, loading, unloading, royalties, labour cess, scaffolding, curing for required period, T&P, etc. all complete as per the direction of the Engineer-in-charge. |
| 13 | Providing 12 mm thick cement plaster in cement mortar (1:6) including racking out joints, scraping and cleaning the surface including the cost of materials, labour, conveyance, taxes, loading and unloading, labour cess, royalties, scaffolding, watering and curing, T&P etc. complete. |
| 14 | Providing 16 mm thick cement plaster in cement mortar (1:6) including racking out joints, scraping and cleaning the surface including the cost of materials, labour, conveyance, taxes, loading and unloading, labour cess, royalties, scaffolding, watering and curing, T&P etc. complete. |
| 15 | Supplying, fabricating and fixing of Structural steel work using GI sections such as angle, flat, channel, square bar, plate, pipes etc. including cutting, bending, welding, hoisting and fixing in position including cost, conveyance,taxes of materials, laboutr, T&P, etc. complete. |
| 16 | Supplying and fixing barbed wire fencing in Iron post / RCC post by means of staples and straining hooks tying with G.I. wire incluidng the cost of staples, hookes, wire, cost of labour, conveyance, taxes, etc. all complete as per the direction of Engineer-in-Charge but excluding the cost of post . |
| 17 | Priming with one coat of water bound cement primer of approved quality and make including the cost of all materials, labour, conveyance, taxes, loading, unloading, scaffolding, T&P, etc. all complete as per the direction of Engineer-in-charge. |
| 18 | Providing and painting with two coats of weather coat paint of approved quality, make and shade on new work including the cost of all materials, labour, conveyance, taxes, loading, unloading, scaffolding, T&P, etc. all complete as per the direction of Engineer-in-charge. |
| 19 | Providing and Painting two coats of synthetic enamel paint of approved quality, make and shade on Iron / Wood Works over one coat of primer including the cost of sand papering, surface polishing, cost of all materials, cost of labour, conveyance, taxes, loading, unloading, scaffolding, T&P, etc. as per direction of Engineer-in-charge. Please Enable Macros to View BoQ information |