| 1 | Earthwork in excavation of foundation of structures of culverts,abntments piers, retaining walls etc. as per drawing and technical specification, including setting out construction of shoring and bracing removal of stumps and other deleterious matter, dressing of sides and bottom, back filling the excavation earth to the extent required and utilising the remaning earth locally for road work upto 3.00 m depth as per MORTH Specification 304EXCLUDING DEWATERINGOrdinary soilManual Means |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. |
| 3 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing :; a)All works upto plinth level |
| 4 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing :; b)In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level. |
| 5 | Centering & shuttering including Strutting, Propping & removal of forms for :;Foundations, Footings, Bases for columns |
| 6 | Centering & shuttering including Strutting, Propping & removal of forms for :;Vertical surfaces such as retaing walls, return walls, Partitions, walls (any thickness) including attached Pilasters, Buttresses, Plinth and string courses, Fillets and the like |
| 7 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in chargeA) 110 mm dia |
| 8 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation rom drain and foundation of other structures graded and compacted to meet requirement of Table 300-2 as per MORTH specification 305 |
| 9 | Supplying of laterite stone soling of size 150-200 mm size and murrum having P.I. Value not more than 6 and laying including packing with smaller stones and consolidation with power road roller including spreading, watering and consolidation of binding material etc.(Measurements shall be considered on finished item) . |
| 10 | Providing and laying 50mm(consolidated thickness)full grout using granitic or basaltic stone of specified grading at 6.00 cu.m. per 100 sq.m. grouting with hot bitumen straight run bitumen(or with such bituminous material of grade and type as specified by the Engineer-in-Charge)at 5.0kg. per sq. m. binding with key aggregate of granitic or basaltic stone of specified grading at 1.5 cu.m. per 100 sq.m. including Providing and laying seal coat sealing the voids in a bituminious surface laid with F.E loader with 1 Cu.m. bucket capacity to the specified levels, grade and cross fall using Type A seal coat with 0.98 kg/sqm of bitumen of grade as per MoRT&H specifications clause 513. |
| 11 | Clearing jungle including up rooting of rank vegetation grass bush wood trees and sapling of girth upto 30 cm. measured at a height of 1 m above ground level & removal of rubbish upto a distance of 50 mt. outside the periphery of the area cleared. (if however, only grass is met with the area will be measured and paid for under item 4001). Please Enable Macros to View BoQ information |