|
| 1 | Labour Charge |
| 2 | Earth filling under floor and in sub-station area including cost of earth. Earth to be obtained from outside the corporation area including its cartage and ramming, watering, dressing in 20 cm's thick layers including cost of earth with all lead and lift etc. |
| 3 | Supply of Gravel & spreading in switch yard area with 20mm nominal size in required thickness as directed by Engineer-In-Charge. |
| 4 | Excavation in foundation for retaining, breast walls etc., in all type of soils and rocks including all lead, lift and disposal of surplus material as per direction of Engineer-in-Charge. |
| 5 | Cleaning, Dressing and labling of Switch yard and carry out from yard to out side. |
| 6 | Repairing of Plinth as per direction of Engineer in Charge. |
| 7 | Dismantling of Transformers from double pole /plinth including opening of all connections, circuts & earthing strip etc. (250 KVA). |
| 8 | Dismantling of Transformers from double pole /plinth including opening of all connections, circuts & earthing strip etc. (400 KVA). |
| 9 | Excavation of earth of size 2.1x2.1x1.2 meter for DTR Plinth. |
| 10 | Cement concreting work in ratio 1:4:8 of DTR Plinth. |
| 11 | Brick work in 1:4 ratio of DTR Plinth. |
| 12 | RR massonary work in 1:6 ratio of DTR Plinth. |
| 13 | RCC Work of 1:2:4 ratio 15 cm thickness of DTR Plinth. |
| 14 | Cement Plaster on side walls in 1:4 ratio of DTR Plinth. |
| 15 | Erection, providing and fixing of wire mesh of size 50x35 mm around plinth and toe wall duly welded with frame of M.S angle iron 35 x35x6 mm and strip of size 35x6 mm in mid of each side along with wire mesh (width of wire mesh 1.5 meter ) with the height of 0.5 meter above the plinth and 2 meter above the toe wall with 1 No. gate and locking arrangment in the toe wall size including grouting of 6 Nos. legs in the ratio in block of size 0.25x0.25x0.45 meter including gravlling of shingle of size 20 to 40 mm and complete painting of wire mesh with aluminium paint with two coat (Including the cost of cement and all material) |
| 16 | Installation/ mounting of new 400/500 KVA Tranformer on plinth structure and fixing of channel / angle etc. and making all connections of HT and LT side and its complete commissioning. |
| 17 | Installation/ mounting of new 250 KVA Tranformer on plinth structure and fixing of channel / angle etc. and making all connections of HT and LT side and its complete commissioning. |
| 18 | Mounting & Fixing of TPMO on double pole structures including making of connections complete work |
| 19 | Mounting & Fixing of Fuse sets on double pole structures including making of connections complete work |
| 20 | Dismantling of Fencing and Gate of S/S including fabrication cutting and welding works at Sub Station |
| 21 | Installation of T/F trolley Inclding Cartage/back cartage. |
| 22 | Dismantling of damage LT PVC Cable (3.5 Core and single core) from DTR to Pole. |
| 23 | Back cartage of petty material,0-20 km |
| 24 | Laying & Fixing Insulated Cable LT XLPE Alu. Cond. Power cable |
| 25 | Earthing of T/F LA & Body with 2 nos MS Earth Rod GI strip and earth wire separate. |
| 26 | Dismantle of Exiting TPMO/GO Switch/Isolator. |
| 27 | Dismantle of Exiting Fuse Set |
| 28 | Reconnection of Jumpers Cable and Earthing. |
| 29 | Back head load Cartage of Small Line Material 0-1 Km. |
| 30 | Providing Temporary Supply Arrangement at S/s by 11/0.4 KV Trolly Including Proper Safety Arrangement. Please Enable Macros to View BoQ information |