|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level |
| 3 | 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 4 | 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Small lintels not exceeding 1.5 m clear span, moulding as in cornices, window sills, string courses, bands, copings, bed plates, anchor blocks and the like. |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo- Mechanically Treated bars of grade Fe-500D or more. |
| 8 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand). |
| 9 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate |
| 10 | 12 mm cement plaster finished with a floating coat of neat cement of mix : 1:6 (1 cement: 6 coarse sand). |
| 11 | Providing and laying cement concrete pavement of M-10 with ready mixed concrete from batching plant of reputed cement manufacture and transported to the site of work in transit mixer having continuous agitated mixer, manufactured as per mixed design of M-10 grade of cement concrete work including pumping of R.M.C from transit mixer to site. Placing in required camber compulsory with plate / screed vibrator, with wire brush etc. and curing including cost admixture in recommended proportions as per I.S. 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per specifications and direction of Engineer-in-charge Note : 1) Excess/less cement used than specified in this item is payable/ recoverable separately. M-10 grade plain cement concrete by using 220Kg of cement per cum of concrete. |
| 12 | Providing and laying 100mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. |
| 13 | Supply of earth at site including excavation, royalty, loading, unloading and banking the same in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with ½ tonne roller or wooden or steel rammers and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions including carriage of earth by mechanical transport lead upto 15.00 km. All kinds of soil. |
| 14 | Providing & Fixing Red Sand Stone Slab 30 mm thick (undressed) over drains. |
| 15 | Hiring & running charges of JCB machine on hourly basis including all operations i.e. to and fro, carriage, crawling of machine, operator and fuel etc. complete. |
| 16 | Supply and filling building rubbish in trenches, plinth, road in layers not exceeding 20 cm in depth, with power rolling earch layer with half tonne roller and rolling every third and topmost layer with roller of minimum 8 tonne, with all lead and lifts. |
| 17 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 18 | Lettering with black Japan paint of approved brand and manufacture |
| 19 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture Please Enable Macros to View BoQ information |