|
| 1 | Construction of CC Block Road |
| 2 | Filling with available earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15 cm), with intermediate layer of compacted earth (Soil density of 98%) after every four layers of compacted depth of fly ash, sides & top layer of filling shall be done with earth having total minimum compacted thickness 30 cm or as decided by Engineer -in-charge, including compacting each layer by rolling/ ramming and watering, all complete as per drawing and direction of Engineer -in - charge. (As per DSR-2.38) |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. (As per DSR-2.27) |
| 4 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. (As per DSR-16.78.1) |
| 5 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per specifications and directions of Engineer-in-Charge. (As per DSR-16.79) |
| 6 | Providing & Laying Politheen sheet (125 micron) below C.C. |
| 7 | Cement concrete pavement with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), including finishing complete.. (As per DSR-11.7) |
| 8 | Expension joint & filling bitumen/seltax board with sub mixed etc complete cost of material labour etc complete on 4.50 m distance. |
| 9 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. (As per DSR-2.6) |
| 10 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. (As per DSR-2.27) |
| 11 | 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources). (As per DSR-4.1.5) |
| 12 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in: Cement mortar 1:6 (1 cement : 6 coarse sand). (As per DSR- 6.4.2) |
| 13 | Cement concrete pavement with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), including finishing complete.. (As per DSR-11.7) |
| 14 | 12 mm cement plaster of mix : 1:6 (1 cement: 6 coarse sand). (As per DSR-13.4.2) |
| 15 | Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc.complete. 600 mm dia RCC pipes. (As per DSR-19.35.2) GST Paid Seperatly Please Enable Macros to View BoQ information |