|
| 1 | w.no. 19 medical college dirven pump work |
| 2 | Earthwork in excavation for struchures i/c all comp. as SR No.251 |
| 3 | Providing and laying cement concrola 1:6:12 i/c all com as SR No.273 |
| 4 | First class brick work in 1:4 cement and fine sand i/c all comp. as SR No.305(a) |
| 5 | Furnishing and placing reintforced cement concrement in super structure as per drawing and Techinal specification. M20 (1:2:4). SR Mo.283 |
| 6 | Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and Techinal specifications causes. SR No. 504 |
| 7 | Plastering with cement mortar (1:4) 12 mm thick on brickwork in substructure/superstructure. SR .584 |
| 8 | Finishing walls with white bases putty i/c all comp. D.S.R. 13.46.1. |
| 9 | Finishing walls with w.p.c. paint i/c all comp. as SR No. 660+661 |
| 10 | Providing and laying verified tiles in floor i/c all comp. |
| 11 | Solar water System with Storage facility Solar Submersible automated pump (1 HP 160V Solar Submersibble Pump set-1.0 Nos, HP Controllar Solar+Grid-1.0 Nos, 335W Solar 10 Module (Cut Cell)-3.0 Nos Float Switch-1.0, Nos, 5000 Ltr GI Tank holding Structure with ladder, stand post and foundation Bolt.) |
| 12 | Boring with 100mm dia casing pipe for hand pump/tubwell, in all soils except ordinary hard rocks requiring blasting, 1/c removing the casing pipe after the hand pump/tubewell is lowered and tested. |
| 13 | 100mm dia pipe PVC lowering in boring (DSR 2021-23.3.1) |
| 14 | Site Clearance and other unforeseen items. |
| 15 | Excavation of earth in ordinary soil for pipe line and using main trenches including lift upto 1.50m and lend upto 50m and refilling watering, ramming of the excavated earth into the trenches and also disposal of surplus earth upto 50m from the center of trenches including supply of all materials labour, T&P complete as per instructions of engineer in charge |
| 16 | Ordinary soil @ 70% of total excavation |
| 17 | Construction of following chambers as per department type design and drawing including heavy duty MS Manhole cover and all materials, labours, T&P etc complete or proper completion of work as per Instruction of engineer in charge. |
| 18 | Sluice valve chamber (surface box type) |
| 19 | Air valve chamber 350(L)x350(W)x500(H)mm |
| 20 | Scour valve chambe dia upto 200mm-1000mm*1300mm |
| 21 | PRV Valve Chamber-1000x1200x1300 |
| 22 | Distribution System-Pipeline Excavation |
| 23 | Supply of following sizes for distribution system conforming to latest/relevant IS 4984-1995 specification with all joints materials and specials conforming to latest/relevant IS specification including F.O.R. Detination and all taxes and insurance etc. With loading, unloading and carting upto site of work, also including special for these pipes and loweing them into the trenches and laying true to alignment and gradient and jointing etc. complete as per instruction |
| 24 | Valves & Fittings |
| 25 | Supply and installation, testing etc. Ol single/double ball type air valve confirming to Intest/relevant IS specification including all taxes and insurance, carting upto site of work and lowering them into the trenches, fixing in position and jointing them with pipelines and testing etc. complete (including supply of jointing materials ans valve fittings etc.) as per instruction of engineer in charge. |
| 26 | Supply of following sizes of main/distribution system conforming to latest/relevant IS 8329/2000 specifications with all jointing material such as specials conforming to latest/relevant IS specification, suitable for DJ pipes as per IS-1239/2000 and IS-8329/2000 or their latest amendment including F.O.R. destination and all in taxes and insurance etc. with loading, unloading and carting upto site of work, also including specials for these pipes and lowering them into the trenches and laying true to alignment and gradient and cutting of pipes for making up the length but excluding the cost of trenches all complete as per engineer of incharge. |
| 27 | Excavation of earth in ordinary soil for pipe line and rising main treches including lift upto 1.50m and lend upto 50m and refilling watering, ramming of the excavated earth into the trenches and also disposal of including supply of all materials labour, T&P etc. complete as per instruction of engineer in charge. |
| 28 | Dismanteling of following type of surfaces including sorting out and slacking of serviceable materials and disposal of unservisable materials upto a distance of 50m as per instruction of engineer in charge. |
| 29 | Interlocking Road |
| 30 | Reinstatement of the following type of road surface with old and new materials Including supply of all materials, labour, T&P etc required for proper. |
| 31 | Interlocking Road |
| 32 | SUPPLY AND FIXING 3 NO SOLAR WATER COOLER WITH 150 X 150 WATER COOLER COMPLETE ALL RESPECT |
| 33 | Add 18% GST Please Enable Macros to View BoQ information |