| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Executive Engineer Electric Division-III , JPDCL Jammu Name of Work: Fixing of Rate Contract (Labour Charges) for Reclamation/Repairs of Damaged Distribution Transformers of Various Ratings viz 25Kva, 63KVa, 100KVa, 200/250KVa, 400/500KVa, 630KVa; Aluminum wound /Copper wound under SASCI Scheme The period of execution shall be till the validity of this scheme and the same rates can also be used for other works under the jurisdiction of Electric Division-III, JPDCL, Jammu (J&K) for FY 2026-27.” Contract No: e-NIT No. 10 of 2026-27 dt. 29-04-2026 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # |
| 2 | Item Description |
| 3 | 25 KVA Distribution Transformer (Aluminium Wound) |
| 4 | Unloading of transformer from vehicle, |
| 5 | Dragging of tranaformer from stacking site/Unloading site to worksite,Opening of Transformers, Draining of oil, Opening of HV/LV Connections, Taking out core, Opening of Side Channel Laminations. |
| 6 | Labour Charges for Taking out of all coils after opening of connections and inspection of coils to ascertain damages. |
| 7 | Labour charges for repairing ,welding of Transformer Tank , radiators , Arresting of oil leakages etc if any including |
| 8 | Labour charges for cleaning and washing of Transformer Tank , radiators top cover etc. |
| 9 | Painting of Transformer Tank (inner and outer side) , radiators including supply. |
| 10 | Impregnation and Heat tretment of Transformer/coils |
| 11 | Refixing of coils and reffitting of Transformer including providing of cork sheet,packing gutties and other sundry. |
| 12 | Fitting of LT Bushing |
| 13 | Fitting of LT Bush Rod |
| 14 | Heat Treatment of Transformer by short Circuit |
| 15 | Labour charges for dragging from work site to heat treatment site, heat treatment site to filling site , filling site to testing site , testing site to loading or stacking site during work. |
| 16 | Loading of repaired Transformer to Vehicle including dragging from stacking site in Divl. Workshop. |
| 17 | Testing of transformer after repairs |
| 18 | 63 KVA Distribution Transformer (Aluminium Wound) |
| 19 | Unloading of transformer from vehicle, |
| 20 | Dragging of tranaformer from stacking site/Unloading site to worksite,Opening of Transformers, Draining of oil, Opening of HV/LV Connections, Taking out core, Opening of Side Channel Laminations. |
| 21 | Labour Charges for Taking out of all coils after opening of connections and inspection of coils to ascertain damages. |
| 22 | Labour charges for repairing ,welding of Transformer Tank , radiators , Arresting of oil leakages etc if any including |
| 23 | Labour charges for cleaning and washing of Transformer Tank , radiators top cover etc. |
| 24 | Painting of Transformer Tank (inner and outer side) , radiators including supply. |
| 25 | Impregnation and Heat tretment of Transformer/coils |
| 26 | Refixing of coils and reffitting of Transformer including providing of cork sheet,packing gutties and other sundry. |
| 27 | Fitting of LT Bushing |
| 28 | Fitting of LT Bush Rod |
| 29 | Heat Treatment of Transformer by short Circuit |
| 30 | Labour charges for dragging from work site to heat treatment site, heat treatment site to filling site , filling site to testing site , testing site to loading or stacking site during work. |
| 31 | Loading of repaired Transformer to Vehicle including dragging from stacking site in Divl. Workshop. |
| 32 | Testing of transformer after repairs |
| 33 | 100 KVA Distribution Transformer (Aluminium Wound) |
| 34 | Unloading of transformer from vehicle, |
| 35 | Dragging of tranaformer from stacking site/Unloading site to worksite,Opening of Transformers, Draining of oil, Opening of HV/LV Connections, Taking out core, Opening of Side Channel Laminations. |
| 36 | Labour Charges for Taking out of all coils after opening of connections and inspection of coils to ascertain damages. |
| 37 | Labour charges for repairing ,welding of Transformer Tank , radiators , Arresting of oil leakages etc if any including |
| 38 | Labour charges for cleaning and washing of Transformer Tank , radiators top cover etc. |
| 39 | Painting of Transformer Tank (inner and outer side) , radiators including supply. |
| 40 | Impregnation and Heat tretment of Transformer/coils |
| 41 | Refixing of coils and reffitting of Transformer including providing of cork sheet,packing gutties and other sundry. |
| 42 | Fitting of LT Bushing |
| 43 | Fitting of LT Bush Rod |
| 44 | Heat Treatment of Transformer by short Circuit |
| 45 | Labour charges for dragging from work site to heat treatment site, heat treatment site to filling site , filling site to testing site , testing site to loading or stacking site during work. |
| 46 | Loading of repaired Transformer to Vehicle including dragging from stacking site in Divl. Workshop. |
| 47 | Testing of transformer after repairs |
| 48 | 200/250 KVA Distribution Transformer (Aluminium Wound/ Copper Wound) |
| 49 | Unloading of transformer from vehicle, |
| 50 | Dragging of tranaformer from stacking site/Unloading site to worksite,Opening of Transformers, Draining of oil, Opening of HV/LV Connections, Taking out core, Opening of Side Channel Laminations. |
| 51 | Labour Charges for Taking out of all coils after opening of connections and inspection of coils to ascertain damages. |
| 52 | Labour charges for repairing ,welding of Transformer Tank , radiators , Arresting of oil leakages etc if any including |
| 53 | Labour charges for cleaning and washing of Transformer Tank , radiators top cover etc. |
| 54 | Painting of Transformer Tank (inner and outer side) , radiators including supply. |
| 55 | Impregnation and Heat tretment of Transformer/coils |
| 56 | Refixing of coils and reffitting of Transformer including providing of cork sheet,packing gutties and other sundry. |
| 57 | Fitting of LT Bushing |
| 58 | Fitting of LT Bush Rod |
| 59 | Heat Treatment of Transformer by short Circuit |
| 60 | Labour charges for dragging from work site to heat treatment site, heat treatment site to filling site , filling site to testing site , testing site to loading or stacking site during work. |
| 61 | Loading of repaired Transformer to Vehicle including dragging from stacking site in Divl. Workshop. |
| 62 | Testing of transformer after repairs |
| 63 | 400/500 KVA Distribution Transformer (Copper Wound) |
| 64 | Unloading of transformer from vehicle, |
| 65 | Dragging of tranaformer from stacking site/Unloading site to worksite,Opening of Transformers, Draining of oil, Opening of HV/LV Connections, Taking out core, Opening of Side Channel Laminations. |
| 66 | Labour Charges for Taking out of all coils after opening of connections and inspection of coils to ascertain damages. |
| 67 | Labour charges for repairing ,welding of Transformer Tank , radiators , Arresting of oil leakages etc if any including |
| 68 | Labour charges for cleaning and washing of Transformer Tank , radiators top cover etc. |
| 69 | Painting of Transformer Tank (inner and outer side) , radiators including supply. |
| 70 | Impregnation and Heat tretment of Transformer/coils |
| 71 | Refixing of coils and reffitting of Transformer including providing of cork sheet,packing gutties and other sundry. |
| 72 | Fitting of LT Bushing |
| 73 | Fitting of LT Bush Rod |
| 74 | Heat Treatment of Transformer by short Circuit |
| 75 | Labour charges for dragging from work site to heat treatment site, heat treatment site to filling site , filling site to testing site , testing site to loading or stacking site during work. |
| 76 | Loading of repaired Transformer to Vehicle including dragging from stacking site in Divl. Workshop. |
| 77 | Testing of transformer after repairs |
| 78 | 630 KVA Distribution Transformer (Copper Wound) |
| 79 | Unloading of transformer from vehicle, |
| 80 | Dragging of tranaformer from stacking site/Unloading site to worksite,Opening of Transformers, Draining of oil, Opening of HV/LV Connections, Taking out core, Opening of Side Channel Laminations. |
| 81 | Labour Charges for Taking out of all coils after opening of connections and inspection of coils to ascertain damages. |
| 82 | Labour charges for repairing ,welding of Transformer Tank , radiators , Arresting of oil leakages etc if any including |
| 83 | Labour charges for cleaning and washing of Transformer Tank , radiators top cover etc. |
| 84 | Painting of Transformer Tank (inner and outer side) , radiators including supply. |
| 85 | Impregnation and Heat tretment of Transformer/coils |
| 86 | Refixing of coils and reffitting of Transformer including providing of cork sheet,packing gutties and other sundry. |
| 87 | Fitting of LT Bushing |
| 88 | Fitting of LT Bush Rod |
| 89 | Heat Treatment of Transformer by short Circuit |
| 90 | Labour charges for dragging from work site to heat treatment site, heat treatment site to filling site , filling site to testing site , testing site to loading or stacking site during work. |
| 91 | Loading of repaired Transformer to Vehicle including dragging from stacking site in Divl. Workshop. |
| 92 | Testing of transformer after repairs |
| 93 | Common items for all Capacities of Transformers |
| 94 | Dismentling and reerection of HT jumper sets in case of repairs at site ( for all capacities) |
| 95 | Reconditioning of LV Coil…..(Aluminium) |
| 96 | Reconditioning of LV Coil…..(Cppper) |
| 97 | Winding of HV Leg coil…. (Aluminium) |
| 98 | Winding of HV Leg coil…. (Copper) |
| 99 | Winding of LV Leg coil…. (Aluminium) |
| 100 | Winding of LV Leg coil…. (Copper) |
| 101 | Fitting of HT Bushing (for all capacities) |
| 102 | Fitting of HT Bush Rod (for all capacities) |
| 103 | Filtration/Dehydration of Old/Used Transformer oil including filling in Transformer tank.(for all capacities) |
| 104 | Filling of New/ Fresh Transformer oil in Transformer Tank.(for all capacities) |
| 105 | Sorting/stacking/weighing of Aluminium Scrap of all ratings transformers and damaged Bush rods etc Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 No Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information Compatibility Report for BOQe-NIT68.xls Run on 05-03-2024 17:31 If the workbook is saved in an earlier file format or opened in an earlier version of Microsoft Excel, the listed features will not be available. Significant loss of functionality # of occurrences Version Any effects on this object will be removed. Any text that overflows the boundaries of this graphic will appear truncated. 3.0 Excel 97-2003 Some cells in this workbook contain data validation rules, which refer to values on other worksheets. These rules won't be saved. 4.0 Excel 97-2003 Minor loss of fidelity Some cells or styles in this workbook contain formatting that is not supported by the selected file format. These formats will be converted to the closest format available. 4.0 Excel 97-2003 |