| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Executive Engineer JPDCL Electric Div-I, Parade, Jammu. Name of Work: Fixing of Rate Contract for Maintainance/Emergent works of Distribution Network in the jurisdiction of Electric Division-I JPDCL Parade Jammu for the financial year 2026-27. Contract No: e- NIT No: ED-I/e-NIT/17 of 2026-27 Dated: 29.04.2026 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # |
| 2 | Item Description |
| 3 | Fixing of Rate Contract for Maintainance/Emergent works of Distribution Network in the jurisdiction of Electric Division-I JPDCL Parade Jammu. For the financial year 2026-27. |
| 4 | Erection of PCC 8 Mtr Pole |
| 5 | Erection of PCC 9 Mtr Pole |
| 6 | Erection of PCC 11 Mtr Pole |
| 7 | Erection of ST 8 Mtr Pole |
| 8 | Erection of ST 9 Mtr Pole |
| 9 | Erection of ST 11 Mtr Pole |
| 10 | Erection of ST 13 Mtr Pole |
| 11 | Dismantling of PCC Pole 8 Mtr Long |
| 12 | Dismantling of PCC Pole 9 Mtr Long |
| 13 | Dismantling of PCC Pole 11 Mtr Long |
| 14 | Dismantling of ST Pole 8 Mtr Long |
| 15 | Dismantling of ST Pole 9 Mtr Long |
| 16 | Dismantling of ST Pole 11 Mtr Long |
| 17 | Dismantling of ST Pole 13 Mtr Long |
| 18 | Unloading of PCC 8 Mtr Pole |
| 19 | Unloading of PCC 9 Mtr Pole |
| 20 | Unloading of PCC 11 Mtr Pole |
| 21 | Unloading of ST 8 Mtr Pole |
| 22 | Unloading of ST 9 Mtr Pole |
| 23 | Unloading of ST 11 Mtr Pole |
| 24 | Unloading of ST 13 Mtr Pole |
| 25 | Loading of PCC 8 Mtr Pole |
| 26 | Loading of PCC 9 Mtr Pole |
| 27 | Loading of PCC 11 Mtr Pole |
| 28 | Loading of ST 8 Mtr Pole |
| 29 | Loading of ST 9 Mtr Pole |
| 30 | Loading of ST 11 Mtr Pole |
| 31 | Loading of ST 13 Mtr Pole |
| 32 | Average carriage of PCC 8 Mtr Pole upto 100 Mtr |
| 33 | Average carriage of PCC 8 Mtr Pole additional 100 Mtr |
| 34 | Average carriage of PCC 9 Mtr Pole upto 100 Mtr |
| 35 | Average carriage of PCC 9 Mtr Pole additional 100 Mtr |
| 36 | Average carriage of PCC 11 Mtr Pole upto 100 Mtr |
| 37 | Average carriage of PCC 11 Mtr Pole additional 100 Mtr |
| 38 | Average carriage of ST 8 Mtr Pole upto 100 Mtr |
| 39 | Average carriage of ST 8 Mtr Pole additional 100 Mtr |
| 40 | Average carriage of ST 9 Mtr Pole upto 100 Mtr |
| 41 | Average carriage of ST 9 Mtr Pole additional 100 Mtr |
| 42 | Average carriage of ST 11 Mtr Pole upto 100 Mtr |
| 43 | Average carriage of ST 11 Mtr Pole additional 100 Mtr |
| 44 | Average carriage of ST 13 Mtr Pole upto 100 Mtr |
| 45 | Average carriage of ST 13 Mtr Pole additional 100 Mtr |
| 46 | Straightening of tilted poles 8 Mtr/ 9 Mtr long |
| 47 | Installation of Link Set |
| 48 | Installation of DO Set |
| 49 | Installation of HG Set |
| 50 | Installation of GO Set |
| 51 | Installation of LA Set |
| 52 | Average carriage of 25 KVA upto 100 Mtr |
| 53 | Average carriage of 63 KVA upto 100 Mtr |
| 54 | Average carriage of 100 KVA upto 100 Mtr |
| 55 | Additional Average carriage of 25 KVA 100 - 200 Mtr |
| 56 | Additional Average carriage of 63 KVA 100 - 200 Mtr |
| 57 | Additional Average carriage of 100 KVA 100 - 200 Mtr |
| 58 | Average carriage of 250 KVA upto 100 Mtr |
| 59 | Average carriage of 300 KVA upto 100 Mtr |
| 60 | Average carriage of 400 KVA upto 100 Mtr |
| 61 | Average carriage of 500 KVA upto 100 Mtr |
| 62 | Average carriage of 630 KVA upto 100 Mtr |
| 63 | Additional carriage of 250 KVA 100 - 200 Mtr |
| 64 | Additional carriage of 300 KVA 100 - 200 Mtr |
| 65 | Additional carriage of 400 KVA 100 - 200 Mtr |
| 66 | Additional carriage of 500 KVA 100 - 200 Mtr |
| 67 | Additional carriage of 630 KVA 100 - 200 Mtr |
| 68 | Loading of 25 KVA Transformer |
| 69 | Loading of 63 KVA Transformer |
| 70 | Loading of 100 KVA Transformer |
| 71 | Loading of 250 KVA Transformer |
| 72 | Loading of 300 KVA Transformer |
| 73 | Loading of 400 KVA Transformer |
| 74 | Loading of 500 KVA Transformer |
| 75 | Loading of 630 KVA Transformer |
| 76 | Unloading of 25 KVA Transformer |
| 77 | Unloading of 63 KVA Transformer |
| 78 | Unloading of 100 KVA Transformer |
| 79 | Unloading of 250 KVA Transformer |
| 80 | Unloading of 300 KVA Transformer |
| 81 | Unloading of 400 KVA Transformer |
| 82 | Unloading of 500 KVA Transformer |
| 83 | Unloading of 630 KVA Transformer |
| 84 | Mounting of 25 KVA Transformer |
| 85 | Mounting of 63 KVA Transformer |
| 86 | Mounting of 100 KVA Transformer |
| 87 | Mounting of 250 KVA Transformer |
| 88 | Mounting of 300 KVA Transformer |
| 89 | Mounting of 400 KVA Transformer |
| 90 | Mounting of 500 KVA Transformer |
| 91 | Mounting of 630 KVA Transformer |
| 92 | Erection of Guys in HT Line |
| 93 | Erection of Guys in LT Line |
| 94 | Earthing of Substation complete(Poles, Transformer, CT/PT, LA) |
| 95 | Dismantling of Link Set |
| 96 | Dismantling of DO Set |
| 97 | Dismantling of GO Set |
| 98 | Dismantling of HG Set |
| 99 | Dismantling of LA Set |
| 100 | Erection of Jumper Set HT Side |
| 101 | Erection of Jumper Set LT Side |
| 102 | Dismantling of Jumper Set HT Side |
| 103 | Dismantling of Jumper Set LT Side |
| 104 | Dismounting of 25 KVA Transformer |
| 105 | Dismounting of 63 KVA Transformer |
| 106 | Dismounting of 100 KVA Transformer |
| 107 | Dismounting of 250 KVA Transformer |
| 108 | Dismounting of 300 KVA Transformer |
| 109 | Dismounting of 400 KVA Transformer |
| 110 | Dismounting of 500 KVA Transformer |
| 111 | Dismounting of 630 KVA Transformer |
| 112 | Laying of ACSR Squirel Conductor |
| 113 | Laying of ACSR Weasel Conductor |
| 114 | Laying of ACSR Rabbit Conductor |
| 115 | Laying of ACSR Dog Conductor |
| 116 | Dismantling of ACSR Squirrel Conductor |
| 117 | Dismantling of ACSR Weasel Conductor |
| 118 | Dismantling of ACSR Rabbit Conductor |
| 119 | Dismantling of ACSR Dog Conductor |
| 120 | Tightening of loose conductor Squirrel/Weasel |
| 121 | Tightening of loose conductor Rabbit/Dog |
| 122 | Route clearance for making path for Corridor of 5 mtr./KM |
| 123 | Cement Bottoming of PCC/ST Poles of all sizes (Material for Cement Bottoming is to be provided by contractor) |
| 124 | Fixing of LT Circuit Component of Substation (LT cables,Thimbles,Busbar,Shackle insulators) with Fuse Set / MCCB with Box |
| 125 | Dismantling of LT Circuit Component of Substation (LT cables,Thimbles,Busbar,Shackle insulators) with Fuse Set / MCCB with Box |
| 126 | Branch Cutting |
| 127 | Unloading T & P items i.e Line materials Substations/HT/LT lines |
| 128 | Loading T & P items i.e Line materials Substations/HT/LT lines |
| 129 | Average carriage of T & P items i.e Line materials Substations/HT/LT lines upto 100 Mtr |
| 130 | Average carriage of T & P items i.e Line materials Substations/HT/LT lines 100 - 200 Mtr |
| 131 | Survey/Route Alignment |
| 132 | Drilling of Holes /Each |
| 133 | Fixing/Installation of 11 KV Disc Insulators with fittings |
| 134 | Dismantling of 11 KV Disc Insulators with fittings |
| 135 | Fixing of U-Clamps and Shackle Insulators |
| 136 | Dismantling of U-Clamps and Shackle Insulators |
| 137 | Fixing of 11 KV Pin Insulators with Pins |
| 138 | Dismantling of 11 KV Pin Insulators with Pins |
| 139 | Fixing of Top Clamps for Pin Insulators |
| 140 | Dismantling Fixing of Top Clamps for Pin Insulators |
| 141 | Fixing of Braces |
| 142 | Dismantling Fixing of Braces |
| 143 | Fixing of Danger Plates |
| 144 | Dismantling of Danger Plates |
| 145 | Fixing of Anti Climbing Devices Plates |
| 146 | Dismantling Fixing of Anti Climbing Devices Plates |
| 147 | Painting of Steel Tubular Poles Including Cross arms clamps etc. (Upto 9 Mtr.) (including cost of Paint) |
| 148 | Painting of Steel Tubular Poles Including Cross arms clamps etc. (Above 9 Mtr.) (including cost of Paint) |
| 149 | Painting of Cross arms and Clamps of PCC/Wooden Poles. (including cost of Paint) |
| 150 | Providing of earthing (Spiral/Pipe/Rod Type) including fixing to the pole and cross arm etc. |
| 151 | Fixing of Spacers for LV Lines (for 5 Wire System) |
| 152 | Fixing of Spacers for LV Lines (for 4 Wire System) |
| 153 | Fixing of Spacers for LV Lines (for 3 Wire System) |
| 154 | Fixing of Pre fabricated bracket and cross arm bed for placement of transformer (for transformers upto including 250 KVA) |
| 155 | Fixing of MS Channels 4/5/3 feet long along with Braces |
| 156 | Fixing of M S Angle Iron 9 feet long crossarm |
| 157 | Fixing of MS Angle Iron 5/4/3 feet long crossarm |
| 158 | Unloading of CT/PT Unit |
| 159 | Average carriage of CT/PT Unit upto 100 Mtr |
| 160 | Average carriage of CT/PT upto 100 - 200 Mtr |
| 161 | Erection of CT/PT Unit along with Trivector Meter |
| 162 | Testing and commissioning of CT/PT Unit |
| 163 | Fixing of Suspension/Anchoring Clamps |
| 164 | Laying of HT AB Cable 35 mmsq |
| 165 | Laying of HT AB Cable 50 mmsq |
| 166 | Laying of HT AB Cable 70 mmsq |
| 167 | Laying of HT AB Cable 95 mmsq |
| 168 | Laying of HT AB Cable 120 mmsq |
| 169 | Laying of HT AB Cable 185 mmsq |
| 170 | Laying of HT AB Cable 300 mmsq |
| 171 | Laying of HT AB Cable 400 mmsq |
| 172 | Laying of HT XLPE Cable 35 mmsq |
| 173 | Laying of HT XLPE Cable 50 mmsq |
| 174 | Laying of HT XLPE Cable 70 mmsq |
| 175 | Laying of HT XLPE Cable 95 mmsq |
| 176 | Laying of HT XLPE Cable 120 mmsq |
| 177 | Laying of HT XLPE Cable 185mmsq |
| 178 | Laying of HT XLPE Cable 300 mmsq |
| 179 | Laying of HT XLPE Cable 400 mmsq |
| 180 | Laying of LT AB Cable 35 mmsq |
| 181 | Laying of LT AB Cable 50 mmsq |
| 182 | Laying of LT AB Cable 70 mmsq |
| 183 | Laying of LT AB Cable 95 mmsq |
| 184 | Laying of LT AB Cable 120 mmsq |
| 185 | Laying of LT AB Cable 185 mmsq |
| 186 | Laying of LT AB Cable 300 mmsq |
| 187 | Laying of LT AB Cable 400 mmsq |
| 188 | Laying of LT XLPE Cable 35 mmsq |
| 189 | Laying of LT XLPE Cable 50 mmsq |
| 190 | Laying of LT XLPE Cable 70 mmsq |
| 191 | Laying of LT XLPE Cable 95 mmsq |
| 192 | Laying of LT XLPE Cable 120 mmsq |
| 193 | Laying of LT XLPE Cable 185 mmsq |
| 194 | Laying of LT XLPE Cable 300 mmsq |
| 195 | Laying of LT XLPE Cable 400 mmsq |
| 196 | Dismantling of HT AB Cable 35 mmsq |
| 197 | Dismantling of HT AB Cable 50 mmsq |
| 198 | Dismantling of HT AB Cable 70 mmsq |
| 199 | Dismantling of HT AB Cable 95 mmsq |
| 200 | Dismantling of HT AB Cable 120 mmsq |
| 201 | Dismantling of HT AB Cable 185mmsq |
| 202 | Dismantling of HT AB Cable 300 mmsq |
| 203 | Dismantling of HT AB Cable 400 mmsq |
| 204 | Dismantling of HT XLPE Cable 35 mmsq |
| 205 | Dismantling of HT XLPE Cable 50 mmsq |
| 206 | Dismantling of HT XLPE Cable 70 mmsq |
| 207 | Dismantling of HT XLPE Cable 95 mmsq |
| 208 | Dismantling of HT XLPE Cable 120 mmsq |
| 209 | Dismantling of HT XLPE Cable 185mmsq |
| 210 | Dismantling of HT XLPE Cable 300 mmsq |
| 211 | Dismantling of HT XLPE Cable 400 mmsq |
| 212 | Dismantling of LT AB Cable 35 mmsq |
| 213 | Dismantling of LT AB Cable 50 mmsq |
| 214 | Dismantling of LT AB/ Cable 70 mmsq |
| 215 | Dismantling of LT AB Cable 95 mmsq |
| 216 | Dismantling of LT AB Cable 120 mmsq |
| 217 | Dismantling of LT AB Cable 185 mmsq |
| 218 | Dismantling of LT AB Cable 300 mmsq |
| 219 | Dismantling of LT AB Cable 400 mmsq |
| 220 | Dismantling of LT XLPE Cable 35 mmsq |
| 221 | Dismantling of LT XLPE Cable 50 mmsq |
| 222 | Dismantling of LT XLPE Cable 70 mmsq |
| 223 | Dismantling of LT XLPE Cable 95 mmsq |
| 224 | Dismantling of LT XLPE Cable 120 mmsq |
| 225 | Dismantling of LT XLPE Cable 185 mmsq |
| 226 | Dismantling of LT XLPE Cable 300 mmsq |
| 227 | Dismantling of LT XLPE Cable 400 mmsq |
| 228 | Tightening of loose HT Cable AB/XLPE |
| 229 | Tightening of loose LT Cable AB/XLPE |
| 230 | Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables of HT Lines |
| 231 | Fixing of Straight Through Cable Jointing Kit for AB/XLPE cables of LT Lines |
| 232 | Dismantling of MS Channels 5/4/3 feet long along with Braces |
| 233 | Dismantling of M S Angle Iron 9 feet long |
| 234 | Dismantling of MS Angle Iron 5/4/3 feet long |
| 235 | Construction of Cemented Platform (8x8x6 feet) for 630/400 KVA Substation along with Mesh Fencing of 6 feet height( If Material to be provided by department for this item) |
| 236 | Construction of Cemented Platform (8x8x6 feet) for 630/400 KVA Substation along with Mesh Fencing of 6 feet height( If Material to be provided by Contractor for this item) |
| 237 | Fixing of IPC 120/50mm |
| 238 | Service connection (Domestic/Commercial) |
| 239 | Laying of LT PVC Single Core Cable 95 mmsq |
| 240 | Laying of LT PVC Single Core Cable 120 mmsq |
| 241 | Laying of LT PVC Single Core Cable 185 mmsq |
| 242 | Laying of LT PVC Single Core Cable 300 mmsq |
| 243 | Laying of LT PVC Single Core Cable 400 mmsq |
| 244 | Laying of LT PVC Single Core Cable 630 mmsq |
| 245 | Fixing of Al. Thimbles of different Sizes 95 mmsq |
| 246 | Fixing of Al. Thimbles of different Sizes 185 mmsq |
| 247 | Fixing of Al. Thimbles of different Sizes 300 mmsq |
| 248 | Fixing of Al. Thimbles of different Sizes 400 mmsq |
| 249 | Fixing of Al. Thimbles of different Sizes 630 mmsq |
| 250 | Stone Pad (300 mmx 300 mm x 75 mm) |
| 251 | Fixing of Aluminium Jointing Sleeves |
| 252 | Fixing of Suspension/Tension Clamp with eye hook |
| 253 | Fixing of Wedge connectors/PG Clamps |
| 254 | Fixing of GI Barbed wire for anti climbing |
| 255 | Sundry items like aluminium Lugs, jumpers, binding , Tape. |
| 256 | Fixing of LT Distribution Box for 63/100 KVA DTR with MCCB for incomer & SFU's for Outgoing Circuits |
| 257 | Fixing of LT Distribution Box for 200/250/300/400 KVA DTR with MCCB for incomer & SFU's for Outgoing Circuits |
| 258 | Laying of 3 and a half core PVC 95 mmsq LT XLPE Cable/ AB Cable |
| 259 | Fixing of LT Distribution Box for 500/630 KVA DTR with MCCB for incomer & SFU's for Outgoing Circuits |
| 260 | Fixing of Nuts & Bolts |
| 261 | Fixing of 32/63 amps TPN Switch Disconnector Fuse Unit |
| 262 | Erection of Mesh Fencing(Material to be provided by department for this item) |
| 263 | Erection of Angle post for fencing |
| 264 | Concreting of Angle post of Fencing (with material) |
| 265 | Dismantling of Mesh Fencing |
| 266 | Fabrication of steel |
| 267 | Painting of Mesh fencing and Angle post with Alumininum Paint (including cost of Paint) Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 No Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |