|
| 1 | Cleaning of drainage up to silt at site with disposal of 60mtr. including waste making diversion etc....all comp. |
| 2 | Dismantling of old damaged B/W including stacking of serviceable material and disposal of unserviceable material with in lead of 60 meaters. As per direction of Engineer-In-Charge….all comp. As Per S.I No- 692 |
| 3 | Excavation in foundation in soil mixed with moorum /shingle /kankar, requiring the use of special T&P inculding lift up to 1.5 m & lead up to 30 m work excuted under water or liquid mud and in or under foul condition…..all complete as per P.W.D schedule item no. 251+258 (a) |
| 4 | Earth in cutting or embankment in ordinary soil excavation to done from regular pits with cortage 5 km. distance without royality etc....all comp. As Per S.I No- 253 |
| 5 | P/L cement concrete with 1:6:12 (1 cement 6 fine sand, 12 brick ballast 40mm nominal size etc……..all Comp. As per P.W.D.schedule item. No. 273 |
| 6 | Class-150 brick work with 1:4 cement & c-sand mortar etc…......all comp. As per P.W.D.schedule item.No. 305 |
| 7 | Supply, Laying & Consolidation of 22.4 - 53mm. Gauge stone ballast and screening material by Hand Rammer. etc.....all comp. |
| 8 | 12mm thick Plaster with cement & C- sand mortar in 1:5 including supply of all material labor etc…......all comp. As per P.W.D.schedule item. No. 584(i) |
| 9 | P/L in cement, concrete 4:2:1 with 20mm stone aggregate coarse sand and cement etc.....all comp. As per P.W.D schedule item No. 279(i) |
| 10 | Supply & Laying of 125 micron thick Milki White Polythene sheet under or sub-base to act as separation between sub-base and concrete Slab(for C.C road) etc.....all comp. As Per S.I No- 19 |
| 11 | Providing and Laying of factory made 80 mm thick interlocking cement concrete tiels (30mpa) including 25mm thick compacted bed of fine sand compacting and proper embeding /laying of interlocking tiels levelling and dressing of surface to required level and slope, filling joints with fine sand including the cost of material, labour and T&P etc. required for proper completion of the work. As directed by Engineer-In-Charge….all comp. As Per S.I No- 786(1) New Item |
| 12 | R.C.C. Work with cement approved coarse sand and 2cm (3/4\\") gauge approved stone ballast in proportion of 1:1.5:3 for Slab works etc……….all Comp. As per P.W.D.schedule item. No. - 284 (A). |
| 13 | M.S. or iron in plain work such as R.cc i\c bending for proper shape and i\c supply of steel & its wastage, bend, hooks, and authorized overlapping shall be measured and i\c cost of binding wire.etc………..all Comp. As per P.W.D.schedule item. N0.504 |
| 14 | S/F of granite stone indication board in brick masonary padastal etc....all work comp. As Per Direction Of E/I/C |
| 15 | Deduct cost of old bricks obtained from dismantling....all comp. |
| 16 | Deduct cost of old brick\ Bats obtained from dismantling....all comp. Please Enable Macros to View BoQ information |