|
| 1 | Dismantling of following type of road surface for laying of pipe line including sorting out of serviceable and unserviceable materials proper stacking of serviceable materials at suitable place and disposal of unserviceable materials at suitable place. |
| 2 | Interlocking C.C. Tile Road |
| 3 | Bituminous Road |
| 4 | Cement Concrete Road (300 mm thickness and 150 mm base) |
| 5 | Excavation of earth in ordinary soil (loam, clay or sand) to give upto 1 mt. Cover from top of the pipe including lift upto 1.5mt. and lead from centre of trenches and refilling of earth in 20 cm. layers with watering and ramming etc. complete in all respect. |
| 6 | Supply of following sizes of HDPE pipes including cost of pipes, FOR destination, all taxes duties and insurance charges, cost of jointing materials, loading unloading, third party inspection charges, packing and forwarding charges, road transportation charges etc complete. |
| 7 | 200 mm dia HDPE / PE-100 / PN -10 Pipe (conforming to IS : 4984:2016) or latest amendment |
| 8 | 180 mm dia HDPE / PE-100 / PN -10 Pipe (conforming to IS : 4984:2016) or latest amendment |
| 9 | 160 mm dia HDPE / PE-100 / PN -10 Pipe (conforming to IS : 4984:2016) or latest amendment |
| 10 | Carting, laying & jointing following type of pipes and lowering the same into already prepared trenches and laying true to alignment and gradient, including all labour, T&P, supply & fixing of all require specials conforming to latest / relevant IS specification as per requirement of site, loading and unloading, shifting of public utilities such as under ground electric cables, telephone lines, water pipe lines, gas line, Sewer line, water house connections, sewer house connections etc., also includes sectional pressure testing of pipe line etc. all complete as per direction of Engineer in charge. |
| 11 | 200 mm dia HDPE / PE-100 / PN -10 Pipe (conforming to IS : 4984:2016) or latest amendment |
| 12 | 180 mm dia HDPE / PE-100 / PN -10 Pipe (conforming to IS : 4984:2016) or latest amendment |
| 13 | 160 mm dia HDPE / PE-100 / PN -10 Pipe (conforming to IS : 4984:2016) or latest amendment |
| 14 | Horizontal Directional Drilling for Pipes Installation by HDD method including preparing and setting up the plant and equipment, preparing new pipe-work material, installing new pipe-work and commissioning system or making the system ready for commissioning by HDD operation including, all related civil and mechanical works like excavation, shoring/strutting, etc. drilling, stringing, reaming, and pulling back the new pipe-work on the designed bore path alignment, proper disposal of drilling fluid and back fill of site after completion all inclusive as per as per the instruction of Engineer-in-charge all complete. |
| 15 | 160 to 200 mm dia |
| 16 | Connection of 200mm HDPE pipe to existing 500 mm dia distribution main pipe including supply of all required materials, specials etc., hiring of JCB, RCC Breaker etc. bailing out of water, traffic diversion arrargements work, shifting of utility etc. with all labour, T&P etc. complete as per direction of Engineer-in-Charge. |
| 17 | Provide all material ,labour and T&P etc. fixing of following type of timbering in trenches with 50 mm thick country wood planks, 150 X 75 mmsize sal wood wallers and 125mm dia. sal wood ballies for struts 1.5 m c/c including removal of all timbering after laying of sewer etc. all complete as per direction of Engineer-in-Charge. |
| 18 | Close Timbering (0.00 TO 3.00m) |
| 19 | Bailing out or Pumping out water for diversion by dewatering pumps including all consumables, diesel, oil, petrol, lubricants etc. and disposal of water all complete as per direction of Engineer-in-Charge. |
| 20 | Inter-connection of HDPE pipe to existing branch Distribution system including supply of all material, labour, T&P etc. complete as per direction of Engineer in charge. |
| 21 | Provision for crossings of nalas along the alignment of pipeline including supply of C.I.tyton pipe and specials etc. complete as per direction of Engineer in charge. |
| 22 | Nala crossing (upto 1.5 m wide) |
| 23 | Nala crossing (upto 1.5 to 3.0m wide) |
| 24 | Supply, Carting to site of work, lowering, fixing and jointing of D.I.D/F Sluice Valve 200 mm dia Class-I as per IS IS: 14846: 2000 PN 1.0/ PN 1.6 suitable for a working pressure of 10 Kg / Sq.Cm. in trenches including FOR destinstion, all taxes and insurance, cost of fittings, all jointing materials, such as rubber packing, nut bolts any type of D.I. specials etc. complete work as per direction of Engineer in charge. |
| 25 | 200 mm C.I. D/F Sluice Valve |
| 26 | Supply of all materials and construction of following chambers as per type design of U.P. Jal Nigam including supply of labour, materials, T&P etc. complete. |
| 27 | Sluice Valve Chambers (Masonry Type) |
| 28 | Reinstatement of following type of roads including supply of all materials, labour, T&P etc.required for proper compiition of work as per specifications |
| 29 | C.C.Tiles Road which includes Laying of 80mm thick C.C soling including dressing surface and including supply of tile, filling of jointing with local sand spreading and blinding coat of 10 mm to 25 mm deep of local sand over the entire surface and including all labour T&P etc. required for proper completion of work with P.C.C. 1:6:12 in cement course sand and 40 mm th. Stone ballast. |
| 30 | Bituminous Road which includes Laying of Bituminous road providing grannular sub base, WBM, Dense bituminous macadam and bituminous concrete course in desired thickness along with primer, tack coat and seal coat (Thick ness may be taken according to PWD specification of the respective roads) and proper compaction including all material, labour, T&P etc. complete. |
| 31 | Cement Concrete Road which includes Laying C C road in 1:2:4 cement, coarse sand and 20 mm stone ballast including supply of all labour, material, T&P etc. complete as per direction of engineer in charge. |
| 32 | P.C.C. (1:4:8) in base concrete which includes Laying C C in 1:4:8 cement, coarse sand and 20 mm stone ballast in base concrete including supply of all labour, material, T&P etc. complete as per direction of engineer in charge. Please Enable Macros to View BoQ information |