| 1 | Supply of stone pad |
| 2 | Supply of Clamp for top and Dropper Channel |
| 3 | Supply of Clamp for STP |
| 4 | Supply for LT Fuse Set DT Protection unit with SMC Box |
| 5 | Supply of Suspension Clamp |
| 6 | Supply of Dead End Clamp |
| 7 | Supply of LT Clamp with J Hook |
| 8 | Supply of F Clamp with N&B |
| 9 | Supply of Nut & Bolt Off Size |
| 10 | Carriage of PCC Pole From ESC, Sitapur to Dump Site |
| 11 | Carriage of ST Pole From ESC, Sitapur to Dump Site Sitapur |
| 12 | Carriage of ABC 3x50+1x35+1x16 sqmm From ESC, Sitapur to Dump site |
| 13 | Carriage of ABC 3x95+1x70+1x16 sqmm From ESC, Sitapur to Dump site |
| 14 | Carriage of ACSR Weasel Conductor From ESC, Sitapur to Dump site |
| 15 | Carriage of other Line Material From ESC, Sitapur to Dump Site |
| 16 | Shifting of PCC Pole From Dump Site to work site |
| 17 | Shifting of ST Pole From Dump Site to work site |
| 18 | Shifting of ABC 3x50+1x35+1x16 sqmm From Dump Site to work site |
| 19 | Shifting of ABC 3x95+1x70+1x16 sqmm From Dump Site to work site |
| 20 | Shifting of ACSR Weasel Conductor From Dump Site to work site |
| 21 | Shifting of other Line Material From Dump Site to work site |
| 22 | Fabrication of Top, T-off, Dropper Channel etc |
| 23 | Erection of Single PCC Pole with all accessories |
| 24 | Erection of Single ST Pole with all accessories |
| 25 | Erection of Double PCC Pole with all accessories |
| 26 | Laying stringing and sagging of ACSR Weasel conductor 11 KV line |
| 27 | Laying of ABC 3x50+1x35+1x16 sqmm |
| 28 | Laying of ABC 3x95+1x70+1x16 sqmm |
| 29 | Fixing of stay |
| 30 | Earthing of Pole |
| 31 | Dismentling of Old Line |
| 32 | Concreting of PCC Pole |
| 33 | Concreting of stay |
| 34 | Carrriage of Old used/ removel scrap material From work site to ESC, Sitapur/ J.E. Section Store Please Enable Macros to View BoQ information |