| 1 | Cleaning of drainage up to silt at site with disposal of 60mtr. including waste making diversion etc....all comp. |
| 2 | Dismentling of old Damaged B.O.E soling and stacking of dismantaled bricks at site required for proper completion of the work as per directed by Engineer-in-charge within distance of 60 metre etc....all comp. (Non Schedule Item 01) |
| 3 | Brick soling with straight over burnt bricks laid flat and dry (labour only) including preparation of subgrade to prescribed camber, filling joints with local earth, spreading blinding coat of 1 cm. (3/8\\") depth of local earth over the entire surface and including labour and T&P etc. but excluding of all material required for proper completions of the work. As per P.W.D schedule item No- 785 |
| 4 | Dismantling of old damaged B/W including stacking of serviceable material and disposal of unserviceable material with in lead of 60 meaters. As per direction of Engineer-In-Charge….all comp. As Per S.I No- 692 |
| 5 | Earth in cutting or embankment in ordinary soil excavation to done from regular pits with cortage 5 km. distance without royality etc....all comp. As Per S.I No- 253 |
| 6 | P/L cement concrete with 1:6:12 (1 cement 6 fine sand, 12 brick ballast 40mm nominal size etc……..all Comp. As per P.W.D.schedule item. No. 273 |
| 7 | Class-150 brick work with 1:4 cement & c-sand mortar etc…......all comp. As per P.W.D.schedule item.No. 305 |
| 8 | 12mm thick Plaster with cement & C- sand mortar in 1:5 including supply of all material labor etc…......all comp. As per P.W.D.schedule item. No. 584(i) |
| 9 | Supply, Laying & Consolidation of 22.4 - 53mm. Gauge stone ballast and screening material by Hand Rammer. etc.....all comp. |
| 10 | Supply & Laying of 125 micron thick Milki White Polythene sheet under or sub-base to act as separation between sub-base and concrete Slab(for C.C road) etc.....all comp. As Per S.I No- 19 |
| 11 | P/L in cement, concrete 4:2:1 with 20mm stone aggregate coarse sand and cement etc.....all comp. As per P.W.D schedule item No. 279(i) |
| 12 | R.C.C. Work with cement approved coarse sand and 2cm (3/4\\") gauge approved stone ballast in proportion of 1:1.5:3 for Slab works etc……….all Comp. As per P.W.D.schedule item. No. - 284 (A). |
| 13 | M.S. or iron in plain work such as R.cc i\c bending for proper shape and i\c supply of steel & its wastage, bend, hooks, and authorized overlapping shall be measured and i\c cost of binding wire.etc………..all Comp. As per P.W.D.schedule item. N0.504 |
| 14 | S/F of granite stone indication board in brick masonary padastal etc....all work comp. As Per Direction Of E/I/C |
| 15 | Deduct cost of old bricks obtained from dismantling....all comp. |
| 16 | Deduct cost of old brick\ Bats obtained from dismantling....all comp. Please Enable Macros to View BoQ information |