| 1 | SITC of 4-Pole structure for HT Crossing on 16 Mtrs. ST poles at BHAG NALLAH (11KV KOREPUNNU-II AND INDUSTRY FEEDER); AT BEI NALLAH (11KV KOOTHA-II FEEDER) AND AT TARNAH NALLAH (11KV DINGA AMB-II FEEDER) with ACSR Weasel Conductor in respect of Electric Sub Division Hiranagar of JPDCL Electric Division Kathua |
| 2 | 16 Mtr. Long pole (ST-410 SP 56) |
| 3 | i) Top GI Channel x-arm 100X50X6= 24No.= 6.6 Mtr ii) Belting M.S Angle 50X50X6= 24No. = 5.31 Mtr iii)Bracing M.S.Angel 50X50X6= 24No. = 7.05 Mtr iv)Bracing M.S.Angel 50X50X6= 6No. = 7.5 Mtrv)TopClamb for belting&Braceing angel 50X8 =66 No |
| 4 | 30 mm² ACSR Weasel Conductor |
| 5 | PG Clamps for ACSR weasel conductor |
| 6 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 7 | 11KV Polymeric composite Disc Insulator 12KV,min failing load 45kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 8 | Galvanized Nuts and Bolts |
| 9 | GI Barbed wire for Guard nutting |
| 10 | Danger Plates with Clamp |
| 11 | Anti Climbing Devices with clamps |
| 12 | Earthing Complete by GI Pipe 40mm dia or GI Rod 20mm ,2.5 mtrs long through GI Strip |
| 13 | Red oxide Paint |
| 14 | Aluminium Paints |
| 15 | Cement Bottoming 1:2:4 mix as per REC Standrad 0.5 CUM per pole |
| 16 | Aluminium Jointing Sleeves |
| 17 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 18 | SITC of 4-Pole structure for HT Crossing on 16 Mtrs. ST poles with ACSR Rabbit Coductor at BHAG NALLAH (11KV MUKANPUR FEEDER) & (02Nos. At 11KV HARIA CHAK FEEDER); AT TARNAH FEEDER (01No. AT 11KV CHADWAL FEEDER); (01No. AT 11KV DINGA AMB-I FEEDER) & (02Nos. AT 11KV DINGA AMB-II FEEDER) in respect of Electric Sub Division Hiranagar of JPDCL Electric Division Kathua |
| 19 | 16 Mtr. Long pole (ST-410 SP 56) |
| 20 | i) Top GI Channel x-arm 100X50X6= 56No.= 15.4 Mtr ii) Belting M.S Angle 50X50X6= 56No. = 12.39 Mtr iii)Bracing M.S.Angel 50X50X6= 56No. = 16.45 Mtr iv)Bracing M.S.Angel 50X50X6= 14No. = 17.5 Mtrv)TopClamb for belting&Braceing angel 50X8 =224 No. |
| 21 | 50 mm² ACSR Rabbit Conductor |
| 22 | PG Clamps for ACSR weasel conductor |
| 23 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 24 | 11KV Polymeric composite Disc Insulator 12KV,min failing load 45kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 25 | Galvanized Nuts and Bolts |
| 26 | GI Barbed wire for Guard nutting |
| 27 | Danger Plates with Clamp |
| 28 | Anti Climbing Devices with clamps |
| 29 | Earthing Complete by GI Pipe 40mm dia or GI Rod 20mm ,2.5 mtrs long through GI Strip |
| 30 | Red oxide Paint |
| 31 | Aluminium Paints |
| 32 | Cement Bottoming 1:2:4 mix as per REC Standrad 0.5 CUM per pole |
| 33 | Aluminium Jointing Sleeves |
| 34 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 35 | Laying of LT line on 8 Mtrs. ST poles with ACSR Weasel Conductor on 3 Phase 4 wire at BINDI KAMAD in respect of Electric Sub Division Hiranagar of JPDCL Electric Division Kathua |
| 36 | 8Mtr. Long pole (ST-410 SP 15) |
| 37 | GI U-Clamp for Shackle insulators |
| 38 | 16 KN Shackle insulators |
| 39 | 30 mm² ACSR Weasel Conductor |
| 40 | Galvanized Nuts and Bolts |
| 41 | Red Oxide Paint |
| 42 | Aluminium Paints |
| 43 | Cement bottoming 1:2:4 mix as per REC standerds .45 Cum/pole |
| 44 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 45 | Shifting of HT line on 9 Mtrs. PCC poles with ACSR Weasel Conductor FROM KATLIMORH TO ARNOHA in respect of Electric Sub Division Hiranagar of JPDCL Electric Division Kathua |
| 46 | 9 Mtr. Long Pole(WL-300 Kg ) |
| 47 | GI V cross-arm with top Bracket including clamp |
| 48 | GI Channel x-arm includingclaps and braces |
| 49 | 30 mm² ACSR Weasel Conductor |
| 50 | PG Clamps for ACSR weasel conductor |
| 51 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 52 | 11KV Polymeric composite Disc Insulator 12KV,min failing load 45kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 53 | Galvanized Nuts and Bolts |
| 54 | Danger Plates with Clamp |
| 55 | Earthing Complete by GI Pipe 40mm dia or GI Rod 20mm ,2.5 mtrs long through GI Strip |
| 56 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 57 | Dismantling of existing line & write back of dismantled material at Divisional Store |
| 58 | Shifting of HT line on 9 Mtrs. ST poles with ACSR Weasel Conductor WARD No.2, KATLI in respect of Electric Sub Division Hiranagar of JPDCL Electric Division Kathua |
| 59 | 9 Mtr. Long pole (ST-410 SP 33) |
| 60 | GI V cross-arm with top Bracket including clamp |
| 61 | GI Channel x-arm includingclaps and braces |
| 62 | 30 mm² ACSR Weasel Conductor |
| 63 | PG Clamps for ACSR weasel conductor |
| 64 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 65 | 11KV Polymeric composite Disc Insulator 12KV,min failing load 45kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 66 | Galvanized Nuts and Bolts |
| 67 | Danger Plates with Clamp |
| 68 | Earthing Complete by GI Pipe 40mm dia or GI Rod 20mm ,2.5 mtrs long through GI Strip |
| 69 | Red oxide Paint |
| 70 | Aluminium Paints |
| 71 | Cement Bottoming 1:2:4 mix as per REC Standrad 0.5 CUM per pole |
| 72 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 73 | Shifting/Creation of 250 KVA Sub Station on PCC poles at Ward No.1, Katli in respect of Electric Sub Division Hiranagar of Electric Division Kathua |
| 74 | Shifting of existing 250 KVA, 11/0.433-0.250KV;50 Hz, Al wound Distribution Transformer (250KVA available at site) |
| 75 | Gapless Surge Arrestor,9 KV ,10 KA ,LA with polymer housing, Stn. Type |
| 76 | 11KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type |
| 77 | 11 KV Horn Gap Fuse Set 3 Phase 200A |
| 78 | 185 mm² (2 Ckt) Cable,1.1KV Grade, PVC Insulated Stranded Conductor FRLS type. |
| 79 | 9 Mtr. Long pole (PCC WL -300 KG) |
| 80 | 11KV Polymeric composite Disc Insulator 12KV,min failing load 45KN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 81 | GI Channel/Angle/Flat of sizes including clamps. |
| 82 | Galvanized Nuts and Bolts. |
| 83 | Earthing of substation -Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. |
| 84 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lightening Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 85 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 86 | Wedge connectors /PG clamps |
| 87 | Danger plate with clamps |
| 88 | Anti-Climbing Device with Clamps |
| 89 | Shifting of HT line on 9 Mtrs. ST poles with ACSR Weasel Conductor at Ward No.1, Katli in respect of Electric Sub Division Hiranagar of Electric Division Kathua |
| 90 | 9 Mtr. Long pole (ST-410 SP 33) |
| 91 | GI V cross-arm with top Bracket including clamp |
| 92 | GI Channel x-arm includingclaps and braces |
| 93 | 30 mm² ACSR Weasel Conductor |
| 94 | PG Clamps for ACSR weasel conductor |
| 95 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 96 | 11KV Polymeric composite Disc Insulator 12KV,min failing load 45kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 97 | Galvanized Nuts and Bolts |
| 98 | Danger Plates with Clamp |
| 99 | Earthing Complete by GI Pipe 40mm dia or GI Rod 20mm ,2.5 mtrs long through GI Strip |
| 100 | Red oxide Paint |
| 101 | Aluminium Paints |
| 102 | Cement Bottoming 1:2:4 mix as per REC Standrad 0.5 CUM per pole |
| 103 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 104 | Laying of LT line on 8 Mtrs. ST poles with ACSR Weasel Conductor on 3 Phase 4 wire at Ward No.1, Katli in respect of Electric Sub Division Hiranagar of Electric Division Kathua |
| 105 | 8Mtr. Long pole (ST-410 SP 15) |
| 106 | GI U-Clamp for Shackle insulators |
| 107 | 16 KN Shackle insulators |
| 108 | 30 mm² ACSR Weasel Conductor |
| 109 | Galvanized Nuts and Bolts |
| 110 | Red Oxide Paint |
| 111 | Aluminium Paints |
| 112 | Cement bottoming 1:2:4 mix as per REC standerds .45 Cum/pole |
| 113 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 114 | Insertion/Laying of 08Mtrs. ST Poles with ACSR Weasel Conductor at Ward No.2, Katli; Sountha; Kheri and various other locations in respect of Electric Sub Division Hiranagar of JPDCL Electric Division Kathua |
| 115 | 8Mtr. Long pole (ST-410 SP 15) |
| 116 | GI U-Clamp for Shackle insulators |
| 117 | 16 KN Shackle insulators |
| 118 | Nuts and Bolts |
| 119 | 30mmsq. ACSR Weasel Conductor |
| 120 | Shifting of HT line on 9 Mtrs. ST poles with ACSR Weasel Conductor FROM PARSHURAM MANDIR TO PHE GARA in respect of Electric Sub Division Hiranagar of Electric Division Kathua |
| 121 | 9 Mtr. Long pole (ST-410 SP 33) |
| 122 | GI V cross-arm with top Bracket including clamp |
| 123 | GI Channel x-arm includingclaps and braces |
| 124 | 30 mm² ACSR Weasel Conductor |
| 125 | PG Clamps for ACSR weasel conductor |
| 126 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 127 | 11KV Polymeric composite Disc Insulator 12KV,min failing load 45kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 128 | Galvanized Nuts and Bolts |
| 129 | Danger Plates with Clamp |
| 130 | Earthing Complete by GI Pipe 40mm dia or GI Rod 20mm ,2.5 mtrs long through GI Strip |
| 131 | Red oxide Paint |
| 132 | Aluminium Paints |
| 133 | Cement Bottoming 1:2:4 mix as per REC Standrad 0.5 CUM per pole |
| 134 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 135 | Laying of LT line on 8 Mtrs. ST poles with ACSR Weasel Conductor on 3 Phase 4 wire at KOULI in respect of Electric Sub Division Hiranagar of Electric Division Kathua |
| 136 | 8Mtr. Long pole (ST-410 SP 15) |
| 137 | GI U-Clamp for Shackle insulators |
| 138 | 16 KN Shackle insulators |
| 139 | 30 mm² ACSR Weasel Conductor |
| 140 | Galvanized Nuts and Bolts |
| 141 | Red oxide Paint |
| 142 | Aluminium Paints |
| 143 | Cement bottoming 1:2:4 mix as per REC standerds .45 Cum/pole |
| 144 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 145 | Creation of 25KVA Sub Station on PCC poles at ST BASTI REHNI in respect of Electric Sub Division Hiranagar of JPDCL Electric Division Kathua |
| 146 | 25 KVA, 11/0.433-0.250KV;50 Hz, Al wound Distribution Transformer of latest Energy efficiency level-2( new), IS1180 part -1, 2014 as per latest upto date amendment |
| 147 | Gapless Surge Arrestor,9 KV ,10 KA ,LA with polymer housing, Stn. Type |
| 148 | 11KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type |
| 149 | 11 KV Horn Gap Fuse Set 3 Phase 200A |
| 150 | 25 mm² Single core cable,1.1K V Grade, PVC Insulated Stranded Conductor FRLS type. |
| 151 | 9 Mtr. Long pole (PCC WL 300 KG) |
| 152 | 11KV Polymeric composite Disc Insulator 12KV,min failing load 45KN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 153 | GI Channel/Angle/Flat of sizes including clamps for L.A set/G.O set/Horn Gap |
| 154 | Galvanized Nuts and Bolts. |
| 155 | 32/63 Amps TPN switch Disconnector fuse unit |
| 156 | Cement bottoming 1:2:4 mix as per REC standerds .5 Cum/pole |
| 157 | Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. |
| 158 | LT Distribution Box for 16 KV DTR with MCCB for incommer and SFU's for out going Circuits |
| 159 | Laying of HT line on 9 Mtrs. ST poles with ACSR Weasel Conductor at ST BASTI REHNI in respect of Electric Sub Division Hiranagar of JPDCL Electric Division Kathua |
| 160 | 9 Mtr. Long pole (ST-410 SP 33) |
| 161 | GI V cross-arm with top Bracket including clamp |
| 162 | GI Channel x-arm includingclaps and braces |
| 163 | 30 mm² ACSR Weasel Conductor |
| 164 | PG Clamps for ACSR weasel conductor |
| 165 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 166 | 11KV Polymeric composite Disc Insulator 12KV,min failing load 45kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 167 | Galvanized Nuts and Bolts |
| 168 | Danger Plates with Clamp |
| 169 | Earthing Complete by GI Pipe 40mm dia or GI Rod 20mm ,2.5 mtrs long through GI Strip |
| 170 | Red oxide Paint |
| 171 | Aluminium Paints |
| 172 | Cement Bottoming 1:2:4 mix as per REC Standrad 0.5 CUM per pole |
| 173 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 174 | Laying of LT line on 8 Mtrs. ST poles with ACSR Weasel Conductor on 3 Phase 4 wire at ST BASTI REHNI in respect of Electric Sub Division Hiranagar of JPDCL Electric Division Kathua |
| 175 | 8Mtr. Long pole (ST-410 SP 15) |
| 176 | GI U-Clamp for Shackle insulators |
| 177 | 16 KN Shackle insulators |
| 178 | 30 mm² ACSR Weasel Conductor |
| 179 | Galvanized Nuts and Bolts |
| 180 | Red oxide Paint |
| 181 | Aluminium Paints |
| 182 | Cement bottoming 1:2:4 mix as per REC standerds .45 Cum/pole |
| 183 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 184 | Shifting of HT line on 9 Mtrs. PCC poles with ACSR Weasel Conductor AT BACHETAR in respect of Electric Sub Division Hiranagar of JPDCL Electric Division Kathua |
| 185 | 9 Mtr. Long Pole(WL-300 Kg ) |
| 186 | GI V cross-arm with top Bracket including clamp |
| 187 | GI Channel x-arm includingclaps and braces |
| 188 | 30 mm² ACSR Weasel Conductor |
| 189 | PG Clamps for ACSR weasel conductor |
| 190 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 191 | 11KV Polymeric composite Disc Insulator 12KV,min failing load 45kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 192 | Galvanized Nuts and Bolts |
| 193 | Danger Plates with Clamp |
| 194 | Earthing Complete by GI Pipe 40mm dia or GI Rod 20mm ,2.5 mtrs long through GI Strip |
| 195 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 196 | Dismantling of existing line & write back of dismantled material at Divisional Store |
| 197 | Shifting/re-erection 63KVA Sub Station at BACHETAR in respect of Electric Sub Division Hiranagar of Electric Division Kathua |
| 198 | Shifting of existing 63KVA, 11/0.433-0.250KV;50 Hz, Al wound Distribution Transformer (63KVA Transformer available at site) |
| 199 | Gapless Surge Arrestor,9 KV ,10 KA ,LA with polymer housing, Stn. Type |
| 200 | 11KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type |
| 201 | 11 KV Horn Gap Fuse Set 3 Phase 200A |
| 202 | 50 mm² (2 Ckt) Cable,1.1KV Grade, PVC Insulated Stranded Conductor FRLS type. |
| 203 | 9 Mtr. Long pole (PCC WL -300 KG) |
| 204 | 11KV Polymeric composite Disc Insulator 12KV,min failing load 45KN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 205 | 30 mm² ACSR Weasel Conductor |
| 206 | GI Channel/Angle/Flat of sizes including clamps. |
| 207 | Galvinized Nuts and Bolts. |
| 208 | Earthing of substation -Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. |
| 209 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lightening Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 210 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 211 | Wedge connectors /PG clamps |
| 212 | Danger plate with clamps |
| 213 | Anti Climbing Devices with clamps |
| 214 | 3 Ph 4 Wire Trivector meter with CT (Prodigy Meter) |
| 215 | Laying of HT line on 9 Mtrs. PCC poles with ACSR Weasel Conductor at BACHETAR in respect of Electric Sub Division Hiranagar of Electric Division Kathua |
| 216 | 9 Mtr. Long pole (WL-300Kg) |
| 217 | GI V cross-arm with top Bracket including clamp |
| 218 | GI Channel x-arm includingclaps and braces |
| 219 | 30 mm² ACSR Weasel Conductor |
| 220 | PG Clamps for ACSR weasel conductor |
| 221 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 222 | 11KV Polymeric composite Disc Insulator 12KV,min failing load 45kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 223 | Galvanized Nuts and Bolts |
| 224 | Danger Plates with Clamp |
| 225 | Anti Climbing Devices with clamps |
| 226 | Earthing Complete by GI Pipe 40mm dia or GI Rod 20mm ,2.5 mtrs long through GI Strip |
| 227 | Cement Bottoming 1:2:4 mix as per REC Standrad 0.5 CUM per pole |
| 228 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 229 | Laying of LT line on 8 Mtrs. ST poles with ACSR Weasel Conductor on 3 Phase 4 wire at BACHETAR in respect of Electric Sub Division Hiranagar of Electric Division Kathua |
| 230 | 8Mtr. Long pole (WL-300Kg) |
| 231 | GI U-Clamp for Shackle insulators |
| 232 | 16 KN Shackle insulators |
| 233 | 30 mm² ACSR Weasel Conductor |
| 234 | Galvanized Nuts and Bolts |
| 235 | Danger Plante with Clamp |
| 236 | Anti Climbing Devices with clamps |
| 237 | Earthingt Complete by GI Pipe 40mm or GI rod 20mm 2.5Mtr long through GI Strip |
| 238 | Cement bottoming 1:2:4 mix as per REC standerds .45 Cum/pole |
| 239 | Creation of 63KVA Sub Station at WARD NO.3, KADETAR in respect of Electric Sub Division Hiranagar of Electric Division Kathua |
| 240 | 63 KVA, 11/0.433-0.250KV;50 Hz, Al wound Distribution Transformer of latest Energy efficiency level-2 ( new), IS1180 part -1, 2014 as per latest upto date amendment with externally fitted MCCB with cable box and 4x4 mtrs. Suitable cable of ratings.(Aluminium Wound upto 200 KVA, Copper Wound for 250 KVA or Higher KVA rattings.) |
| 241 | Gapless Surge Arrestor,9 KV ,10 KA ,LA with polymer housing, Stn. Type |
| 242 | 11KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type |
| 243 | 11 KV Horn Gap Fuse Set 3 Phase 200A |
| 244 | 50 mm² (2 Ckt) Cable,1.1KV Grade, PVC Insulated Stranded Conductor FRLS type. |
| 245 | 9 Mtr. Long pole (PCC WL -300 KG) |
| 246 | 11KV Polymeric composite Disc Insulator 12KV,min failing load 45KN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 247 | GI Channel/Angle/Flat of sizes including clamps. |
| 248 | Galvinized Nuts and Bolts. |
| 249 | Earthing of substation -Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. |
| 250 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lightening Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 251 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 252 | Wedge connectors /PG clamps |
| 253 | Danger plate with clamps |
| 254 | Anti Climbing Devices with clamps |
| 255 | Laying of HT line on 9 Mtrs. PCC poles with ACSR Weasel Conductor at WARD NO.3, KADETAR in respect of Electric Sub Division Hiranagar of Electric Division Kathua |
| 256 | 9 Mtr. Long pole (WL-300Kg) |
| 257 | GI V cross-arm with top Bracket including clamp |
| 258 | GI Channel x-arm includingclaps and braces |
| 259 | 30 mm² ACSR Weasel Conductor |
| 260 | PG Clamps for ACSR weasel conductor |
| 261 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 262 | 11KV Polymeric composite Disc Insulator 12KV,min failing load 45kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 263 | Galvanized Nuts and Bolts |
| 264 | Danger Plates with Clamp |
| 265 | Anti Climbing Devices with clamps |
| 266 | Earthing Complete by GI Pipe 40mm dia or GI Rod 20mm ,2.5 mtrs long through GI Strip |
| 267 | Cement Bottoming 1:2:4 mix as per REC Standrad 0.5 CUM per pole |
| 268 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 269 | Laying of LT line on 8 Mtrs. ST poles with ACSR Weasel Conductor on 3 Phase 4 wireat WARD NO.3, KADETAR in respect of Electric Sub Division Hiranagar of Electric Division Kathua |
| 270 | 8Mtr. Long pole (WL-300Kg) |
| 271 | GI U-Clamp for Shackle insulators |
| 272 | 16 KN Shackle insulators |
| 273 | 30 mm² ACSR Weasel Conductor |
| 274 | Galvanized Nuts and Bolts |
| 275 | Danger Plante with Clamp |
| 276 | Anti Climbing Devices with clamps |
| 277 | Earthing Complete by GI Pipe 40mm or GI rod 20mm 2.5Mtr long through GI Strip |
| 278 | Cement bottoming 1:2:4 mix as per REC standerds .45 Cum/pole |
| 279 | Aluminium Jointing Sleeves |
| 280 | Shifting of HT line on 9 Mtrs. PCC poles with ACSR Weasel Conductor AT PRANGOLI in respect of Electric Sub Division Hiranagar of JPDCL Electric Division Kathua |
| 281 | 9 Mtr. Long Pole(WL-300 Kg ) |
| 282 | GI V cross-arm with top Bracket including clamp |
| 283 | GI Channel x-arm includingclaps and braces |
| 284 | 30 mm² ACSR Weasel Conductor |
| 285 | PG Clamps for ACSR weasel conductor |
| 286 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 287 | 11KV Polymeric composite Disc Insulator 12KV,min failing load 45kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 288 | Galvanized Nuts and Bolts |
| 289 | Danger Plates with Clamp |
| 290 | Earthing Complete by GI Pipe 40mm dia or GI Rod 20mm ,2.5 mtrs long through GI Strip |
| 291 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 292 | Dismantling of existing line & write back of dismantled material at Divisional Store |
| 293 | Shifting of HT line on 9 Mtrs. ST poles with ACSR Weasel Conductor at Ward No.1, Katli in respect of Electric Sub Division Hiranagar of Electric Division Kathua |
| 294 | 9 Mtr. Long pole (ST-410 SP 33) |
| 295 | GI V cross-arm with top Bracket including clamp |
| 296 | GI Channel x-arm includingclaps and braces |
| 297 | 30 mm² ACSR Weasel Conductor |
| 298 | PG Clamps for ACSR weasel conductor |
| 299 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 300 | 11KV Polymeric composite Disc Insulator 12KV,min failing load 45kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 301 | Galvanized Nuts and Bolts |
| 302 | Danger Plates with Clamp |
| 303 | Earthing Complete by GI Pipe 40mm dia or GI Rod 20mm ,2.5 mtrs long through GI Strip |
| 304 | Red oxide Paint |
| 305 | Aluminium Paint |
| 306 | Cement Bottoming 1:2:4 mix as per REC Standrad 0.5 CUM per pole |
| 307 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 308 | Dismantling of existing line & write back of dismantled material at Divisional Store |
| 309 | Laying of LT line on 8 Mtrs. ST poles with ACSR Weasel Conductor on 3 Phase 4 wire at SADROTA, LAKHARI KUDHATER & BAGGAN in respect of Electric Sub Division Ramkot of JPDCL Electric Division, Kathua |
| 310 | 8Mtr. Long pole (ST-410 SP 15) |
| 311 | GI U-Clamp for Shackle insulators |
| 312 | 16 KN Shackle insulators |
| 313 | 30 mm² ACSR Weasel Conductor |
| 314 | Galvanized Nuts and Bolts |
| 315 | Red Oxide Paint |
| 316 | Aluminium Paint |
| 317 | Cement bottoming 1:2:4 mix as per REC standerds .45 Cum/pole |
| 318 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 319 | Replacement/insertion of damaged Poles in HT line with 9 mtrs PCC Poles at MANDLI FEEDEER, LAKHARI FEEDER & GURHA FEEDER in respect of Electric Sub Division Ramkot of JPDCL Electric Division, Kathua |
| 320 | 9 Mtr. Long Pole (PCC WL- 300 Kg) |
| 321 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 322 | Nuts and Bolts |
| 323 | ACSR Weasel Conductor |
| 324 | Replacement/insertion of damaged Poles in HT line with 9 mtrs ST Poles at MANDLI FEEDEER & LUDERA FEEDER in respect of Electric Sub Division Ramkot of JPDCL Electric Division, Kathua |
| 325 | 9 Mtr. Long pole (ST-410 SP 33) |
| 326 | 11KV Polymeric composite Pin Insulator 12KV, 5kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm |
| 327 | Nuts and Bolts |
| 328 | ACSR Weasel Conductor |
| 329 | Replacement of damaged Poles in LT line with 8 mtrs PCC Poles at LAKHARI FEEDER & MANDLI FEEDER in respect of Electric Sub Division Ramkot of JPDCL Electric Division, Kathua |
| 330 | PCC pole 8 mtrs.long(Wl-300 Kg) |
| 331 | U-Clamp |
| 332 | Shackle Insulator |
| 333 | Nuts and Bolts |
| 334 | ACSR Weasl conductor |
| 335 | Replacement of damaged Poles in LT line with 8 mtrs ST Poles at PHE FEEDER, LUDHERA FEEDER, LAKHARI FEEDER & GURHA FEEDER in respect of Electric Sub Division Ramkot of JPDCL Electric Division, Kathua |
| 336 | PCC pole 8 mtrs.long(Wl-300 Kg) |
| 337 | U-Clamp |
| 338 | Shackle Insulator |
| 339 | Nuts and Bolts |
| 340 | ACSR Weasl conductor Please Enable Macros to View BoQ information |