|
| 1 | Side clearence of grass and vegitetion tree. Including of all labour T&P etc. S.I No 259 |
| 2 | Earth work in exevation in Rock/Moorum soil foundation including lead upto 30m and left upto 1.5m. Including of all labour T&P etc. S.I. No 252 |
| 3 | Supply and filling of local sand in foundation including of all material labour T&P etc. S.I. No 255 |
| 4 | cement concrete with 1:4:8 cement core sand and 40mm stone ballast in base of flour. Including of all material labour T&P etc. S.I. No 281 |
| 5 | R.C.C. work with 1:1.5:3 cement core sand and 20mm stone grenite grit in foundation colume. Including of all material labour T&P etc. S.I. No 289 |
| 6 | R.C.R. Massnary in 1:6 stone khanda foundation Including of all material labour T&P etc. S.I. No Ch. 8 (a) |
| 7 | R.C.C. work with 1:2:4 cement core sand and 20mm stone grenite grit in plinth beam. Including of all material labour T&P etc. S.I. 285 |
| 8 | M-150 class brick work 1:6 cement sand morter in plinth to foundation. Including of all material labour T&P etc. S.I. No 303 |
| 9 | 2.5cm thick D.P.C. with 1:1.5:3 cement core sand and 13mm stone grenite grit With W.P.C. material as required in plinth level etc. including of all material labour T&P etc. S.I. 361 |
| 10 | M-150 class brick work 1:6 cement sand morter in super struchur one brick wall. Including of all material labour T&P etc. S.I. 303 |
| 11 | R.C.C. work with 1:1.5:3 cement core sand and 20mm stone grenite grit in colume including of all material labour T&P etc. S.I. 289 |
| 12 | R.C.C. work with 1:2.4 cement core sand and 20mm stone grenite grit in lintel including of all material labour T&P etc. S.I. 285 |
| 13 | 12mm thick plaster 1:6 cement sand morter. In plane surface. Including of all material labour T&P etc. S.I. 586 |
| 14 | 12mm thick plaster 1:6 cement sand morter. In rough surface. Including of all material labour T&P etc. S.I. 586 |
| 15 | Earth work in filling B.C. soil including earth cartage by tractor trolly within 1km. Including of all labour T&P etc. |
| 16 | Supply and filling of local sand in plinth including of all material labour T&P etc. S.I. 255 |
| 17 | cement concrete with 1:4:8 cement core sand and 40mm stone ballast in base of flour. Including of all material labour T&P etc. S.I. No 281 |
| 18 | 40mm thick P.C.C. floor with 1:2:4 cement core sand and 20mm stone grenite grit. In canal finish with 3mm floting coat of neat cement etc. including of all material labour T&P etc. S.I. 605 |
| 19 | P/F of glass strip 3.15 mm thick thickness in joint of floor and skirting at the time of laying floor with 3.5 cm deep etc. S.I. 631 (i) |
| 20 | S/F of roaling sutter of aprroved make of 80x1.25mm cold rold M.S. Laths inter locked throughout their entire length and joint together at the end locks and mounted on specially designed pipe shaft with brackets side guides and arrangements for inside and |
| 21 | P/F of 27.5mm long wire springs grade 2 for rolling shutters. S.I. 521 |
| 22 | P/F of top cover for rolling shutters. S.I. 522 |
| 23 | P/F of ball bearing for rolling shutters. S.I. 523 |
| 24 | M.S. angle Iron veltilater frame including cutting & welding in all complete of work. Including of all material labour T&P etc. S.I. 523 New Item 2 |
| 25 | M.S. or tor steel iron work such as R.C.C. wrought to required shape including cutting and bainding in all complete of work. Including of all material labour T&P etc. S.I. No 502 |
| 26 | Water proof cement washing three two coat on new work including of all material labour T&P etc. S.I. No 660 |
| 27 | M.S. Or Iron work in heavy size such as trusses built up gates doors frames records racks roof work,gate etc.wrought to required form including drilling holes rivetting or welding where necessary and also including supply of steel,bolts nut wasrage etc. |
| 28 | S/F Galvanised corrugated iron roffing 24 B.W.C or 0.50 mm thick pre-painted galvalume aluminium zinc coating G.I. based corrugated steel sheet of any colour having tensile strength 550 MPa fixed in position with self tapping screw including all tools and |
| 29 | Supplying and fixing of 22 B.W.G. ridges valleys and gutters for irion roofing fixing with jor U 10mm (3/8\\") dia with G.I. Limpet and bitumen washers complete including supply of all materials, labour and tools and plant etcc. Required, labour and tools a |
| 30 | Painting work with new iron with one coat of redimix primer paint and two coat of redimix supirior quality paint. In door and ventilator etc. S.I. No 644 |
| 31 | Painting work with new iron with one coat of redimix primer paint and two coat of redimix supirior quality paint. In truss etc. S.I. No 641 |
| 32 | Finishing wall with water proof smoshisem paint with two coat in outer side of new work. S.I. No 660 |
| 33 | Boring of holes 200mm dia piles of single under reamed of 500mm bulb and 3.50mtr deep including all peoper completion of works. |
| 34 | Earth work in Excavation of Foundation in bc soil i/cs/o all matareal labour t&p etc |
| 35 | Sand Filling in Foundation |
| 36 | c.c 1:4:8 with cement sand and mortarand 40 mm stone Grit |
| 37 | R.c.c 1:2:4 with cement sand and mortarand 20 mm stone Grit |
| 38 | Ms iron work |
| 39 | Frist Class Brick work in Masonry with 1:4 cement sand and morta |
| 40 | 12mm Thik plaster with 1:4 cement sand and mortar |
| 41 | Applying putty two coats of wall by birla white cement i/c s/o all matareal labour t&p etc as per S.O.R. |
| 42 | Applying two coats of painting by oil bound distemper as per S.O.R. 13.47.1 |
| 43 | Side clearence of grass and vegitetion tree. Including of all labour T&P etc. |
| 44 | Earth work in exevation in Rock/Moorum/Kankar soil foundation including lead upto 30m and left upto 1.5m. Including of all labour T&P etc. S.I. 252 |
| 45 | Supply and filling of local sand in foundation including of all material labour T&P etc. |
| 46 | cement concrete with 1:4:8 cement core sand and 40mm stone ballast in base of flour. Including of all material labour T&P etc. |
| 47 | M-150 class brick work 1:6 cement sand morter in plinth to foundation. Including of all material labour T&P etc. |
| 48 | P.C.C in 1:2:4 with cement sand & 20mm stone grit including all labour material in all complete etc. |
| 49 | R.C.C in 1:2:4 in plane surface with cement sand & 20mm stone grit including all labour material in all complete etc. S.I. 283 |
| 50 | Earth work in filling B.C. soil including earth cartage by tractor trolly within 1km. Including of all labour T&P etc. |
| 51 | 12mm thick plaster 1:6 cement sand morter. In plane surface. Including of all material labour T&P etc. |
| 52 | Earth work in filling B.C. soil including earth cartage by tractor trolly within 1km. Including of all labour T&P etc. |
| 53 | Water proof cement washing three two coat on new work including of all material labour T&P etc. |
| 54 | Finishing wall with water proof smoshisem paint with two coat in outer side of new work. |
| 55 | Boring work through 163mm dia DTH RIG Machine and lowering of casing. |
| 56 | Supply of 140mm dia PVC pip 6kg/sgm. |
| 57 | Rentel charge of rig machine for boring. |
| 58 | Grabil |
| 59 | Supply And Fixing Summersable Pump(All M\L &T\P Complete ) |
| 60 | S/F of Sign Board Please Enable Macros to View BoQ information |